Rosemount Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Mar 2025
- Last 24 months
- 2 permits filed
113 permits since 2000: 93 completed, 2 never finaled, 18 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 18 days from filing to permit and 546 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2021 | Completed final sign-off Sep 2025 | 938 Sanchez St | renovate (e) single family home and add vertical/horizontal addition. 1/f: renovate rec rm, bedrm & bath. infill addition at side. 2/f: renovate kitchen, living, dining, powder, infill addition at side. 3/f: add story, (3) bedrooms + (2) baths, w/d. create roof deck/ solar panels.Details
renovate (e) single family home and add vertical/horizontal addition. 1/f: renovate rec rm, bedrm & bath. infill addition at side. 2/f: renovate kitchen, living, dining, powder, infill addition at side. 3/f: add story, (3) bedrooms + (2) baths, w/d. create roof deck/ solar panels. | $400,000 |
| Dec 1, 2021 | Completed final sign-off Sep 2023 | 232 Downey St | renovate 2 unit bldg. unit 1: renovate kitchen/living/dining/bath & power room. unit 2: renovate kitchen/living/dining/bath & powder @ floor 3 & add powder & modify (e) dormer.add bath,renovate bedrooms replace front windows with all wood double hung with ogee.Details
renovate 2 unit bldg. unit 1: renovate kitchen/living/dining/bath & power room. unit 2: renovate kitchen/living/dining/bath & powder @ floor 3 & add powder & modify (e) dormer.add bath,renovate bedrooms replace front windows with all wood double hung with ogee. | $180,000 |
| Aug 9, 2018 | Completed final sign-off Aug 2019 | 666 41st Av | 1st fl - reconfigure bathroom & closet. reconstruct stair to floor 2; 2nd fl - renovate kitchen, open up wall to living/dining room; 3rd fl - add master bathroom, relocate washer/dryer to this floor. renovate (e) bathroom water closet. reconfigure bedroom closetsDetails
1st fl - reconfigure bathroom & closet. reconstruct stair to floor 2; 2nd fl - renovate kitchen, open up wall to living/dining room; 3rd fl - add master bathroom, relocate washer/dryer to this floor. renovate (e) bathroom water closet. reconfigure bedroom closets | $110,000 |
| Jan 30, 2015 | Completed final sign-off Jun 2016 | 4335 23rd St | reconfigure int. stair&extend fr 3/flr to bsmt. bsmt:add a bathrm&wet bar.1/flr:renov bedrooms&bathrms&washer&dryer.2/flr:renov kitchen/living/dining&powder rm. 3/flr:renov mstr bedrm&bathrm&infill open catherdral clg @ liv.Details
reconfigure int. stair&extend fr 3/flr to bsmt. bsmt:add a bathrm&wet bar.1/flr:renov bedrooms&bathrms&washer&dryer.2/flr:renov kitchen/living/dining&powder rm. 3/flr:renov mstr bedrm&bathrm&infill open catherdral clg @ liv. | $180,000 |