Back to bathroom remodel contractors
Rosemount Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Mar 2025
- Last 24 months
- 2 permits filed
113 permits since 2000: 93 completed, 2 never finaled, 18 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 6 days from filing to permit and 417 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2022 | Completed final sign-off Aug 2023 | 232 Downey St | revision to bpa#202112013449, 1/f create habitable area, (2) bedrooms, (1) bath, storage, create interior connecting stair to 2/f; 4/f alter interior sloped ceiling walls to 5'0"Details
revision to bpa#202112013449, 1/f create habitable area, (2) bedrooms, (1) bath, storage, create interior connecting stair to 2/f; 4/f alter interior sloped ceiling walls to 5'0" | $150,000 |
| Dec 22, 2021 | Completed final sign-off Sep 2025 | 938 Sanchez St | renovate (e) single family home and add vertical/horizontal addition. 1/f: renovate rec rm, bedrm & bath. infill addition at side. 2/f: renovate kitchen, living, dining, powder, infill addition at side. 3/f: add story, (3) bedrooms + (2) baths, w/d. create roof deck/ solar panels.Details
renovate (e) single family home and add vertical/horizontal addition. 1/f: renovate rec rm, bedrm & bath. infill addition at side. 2/f: renovate kitchen, living, dining, powder, infill addition at side. 3/f: add story, (3) bedrooms + (2) baths, w/d. create roof deck/ solar panels. | $400,000 |
| Dec 1, 2021 | Completed final sign-off Sep 2023 | 232 Downey St | renovate 2 unit bldg. unit 1: renovate kitchen/living/dining/bath & power room. unit 2: renovate kitchen/living/dining/bath & powder @ floor 3 & add powder & modify (e) dormer.add bath,renovate bedrooms replace front windows with all wood double hung with ogee.Details
renovate 2 unit bldg. unit 1: renovate kitchen/living/dining/bath & power room. unit 2: renovate kitchen/living/dining/bath & powder @ floor 3 & add powder & modify (e) dormer.add bath,renovate bedrooms replace front windows with all wood double hung with ogee. | $180,000 |
| Sep 24, 2019 | Completed final sign-off Apr 2021 | 24 Woodland Av | rev 201903084809 fdtn underpinning det & int header opening det. #24a - flr 1-alter int wall@stair; flr 2-incr opening btwn kit/liv, add sink, alter closets. #24 - incr opening btwn kit/liv, add bath, alter closets, reloc w/d, repl e garage beam & e footing. sprinkler under sep permit.Details
rev 201903084809 fdtn underpinning det & int header opening det. #24a - flr 1-alter int wall@stair; flr 2-incr opening btwn kit/liv, add sink, alter closets. #24 - incr opening btwn kit/liv, add bath, alter closets, reloc w/d, repl e garage beam & e footing. sprinkler under sep permit. | $2,000 |
| Aug 9, 2018 | Completed final sign-off Aug 2019 | 666 41st Av | 1st fl - reconfigure bathroom & closet. reconstruct stair to floor 2; 2nd fl - renovate kitchen, open up wall to living/dining room; 3rd fl - add master bathroom, relocate washer/dryer to this floor. renovate (e) bathroom water closet. reconfigure bedroom closetsDetails
1st fl - reconfigure bathroom & closet. reconstruct stair to floor 2; 2nd fl - renovate kitchen, open up wall to living/dining room; 3rd fl - add master bathroom, relocate washer/dryer to this floor. renovate (e) bathroom water closet. reconfigure bedroom closets | $110,000 |
| Jul 11, 2018 | Completed final sign-off Jul 2018 | 153 Crescent Av | revision to 201703070879, 201705045718 flr 2 - divide common bathroom into 2 bathrooms. create closet in leiu of w/d. flr 3 - create closet & w/dDetails
revision to 201703070879, 201705045718 flr 2 - divide common bathroom into 2 bathrooms. create closet in leiu of w/d. flr 3 - create closet & w/d | $17,500 |
| May 4, 2017 | Completed final sign-off Jul 2018 | 153 Crescent Av | revision to (e) permit app #2017-0307-0879. raise (e) roof 42" @ rear. convert attic to habitable story. modify approved dormers. create bedroom & bath.Details
revision to (e) permit app #2017-0307-0879. raise (e) roof 42" @ rear. convert attic to habitable story. modify approved dormers. create bedroom & bath. | $30,000 |
| Mar 7, 2017 | Completed final sign-off Jul 2018 | 153 Crescent Av | basement:convert portion area create bedrm, bath.1-car garage, bikes. int connecting stair to flr 1. flr1: renovate #153-kit/liv/din/bedrms/bath/powdr. flr2: renovate #155-kit/liv/din/bedrms/bath. add int stair to attic. attic: remain unconditioned/non-habitable- add dormer,sklts, deck @ rear roofDetails
basement:convert portion area create bedrm, bath.1-car garage, bikes. int connecting stair to flr 1. flr1: renovate #153-kit/liv/din/bedrms/bath/powdr. flr2: renovate #155-kit/liv/din/bedrms/bath. add int stair to attic. attic: remain unconditioned/non-habitable- add dormer,sklts, deck @ rear roof | $290,000 |
| Aug 2, 2002 | Completed final sign-off Jan 2003 | 1668 Great Hy | repair dryrot damage in lowe bathroom. dryrot atfront rear stairsDetails
repair dryrot damage in lowe bathroom. dryrot atfront rear stairs | $10,000 |
| Mar 7, 2001 | Completed final sign-off Apr 2001 | 2845 Baker St | remove tile in 2 bathroom. replace damage. retile. repair rear deck. repairs <50%.Details
remove tile in 2 bathroom. replace damage. retile. repair rear deck. repairs <50%. | $14,000 |