Permit GraphShortlistSan Francisco building permits since 2000

Rosconn Construction

Contractor license
552004
State license record
Based in
El Granada
On San Francisco permits
Apr 2002 to Jan 2020
Last 24 months
0 permits filed

47 permits since 2000: 36 completed, 9 never finaled, 2 expired or cancelled.

Of the 9 never-finaled permits, 2 are 5 to 10 years old, 7 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 3Stairs 8Kitchen remodel 2Bathroom remodel 2

8 stairs permits: 4 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 48 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 12, 2019Completed
final sign-off May 2019
3525 Taraval Stto comply with nov # 201937671 front stairs only install stair guardrail to upper landing .
Details
Permit
201904127815
Status
complete
Filed
Apr 12, 2019
Permit issued
May 7, 2019
Final sign-off
May 7, 2019
Declared cost
$850
Address
3525 Taraval St

to comply with nov # 201937671 front stairs only install stair guardrail to upper landing .

Open the permit page

$850
Jul 27, 2016Never finaled
issued Aug 2016, no final
235 Granada Avcomply with complaint 201622154, repair rear yard exterior stair, no change in configuration.; less than 50% repair & no fire wall.
Details
Permit
201607273508
Status
issued
Filed
Jul 27, 2016
Permit issued
Aug 15, 2016
Declared cost
$2,500
Address
235 Granada Av

comply with complaint 201622154, repair rear yard exterior stair, no change in configuration.; less than 50% repair & no fire wall.

Open the permit page

$2,500
Jul 25, 2016Completed
final sign-off Dec 2016
1250 Sacramento Strepair 14 step at side stairs. to comply with nov. #201617601 items #2, #5. work less than 50%.
Details
Permit
201607253220
Status
complete
Filed
Jul 25, 2016
Permit issued
Jul 25, 2016
Final sign-off
Dec 14, 2016
Declared cost
$2,400
Address
1250 Sacramento St

repair 14 step at side stairs. to comply with nov. #201617601 items #2, #5. work less than 50%.

Open the permit page

$2,400
Jul 22, 2013Completed
final sign-off Aug 2013
955 Burnett Avwindow replacement - visible from street (aluminum); 14 total , with same milgard brand. repair stair dry rot (< 50%); - 3 steps, 2 posts, add a stringer. max u-factor will be 0.32.
Details
Permit
201307222405
Status
complete
Filed
Jul 22, 2013
Permit issued
Jul 22, 2013
Final sign-off
Aug 20, 2013
Declared cost
$14,850
Address
955 Burnett Av

window replacement - visible from street (aluminum); 14 total , with same milgard brand. repair stair dry rot (< 50%); - 3 steps, 2 posts, add a stringer. max u-factor will be 0.32.

Open the permit page

$14,850
Jul 24, 2012Expired or cancelled
expired Feb 2016
959 Haight Strear stair repair in kind. not visible from street. repair handrail to code. replace 4 steps. one 3x3 landing. less 50%.
Details
Permit
201207245564
Status
expired
Filed
Jul 24, 2012
Permit issued
Jul 24, 2012
Declared cost
$3,800
Address
959 Haight St

rear stair repair in kind. not visible from street. repair handrail to code. replace 4 steps. one 3x3 landing. less 50%.

Open the permit page

$3,800
Jul 19, 2011Never finaled
issued Jun 2012, no final
1971 Wawona Stconvert (e) lower level laundry into family room, build new walls below (e) rear yard deck, part of new family room, add new stairway from (e) upper level living to new family room. add foundation to lower level, add plywood to walls, re-work (e) washer & dryer to garage level.
Details
Permit
201107190538
Status
issued
Filed
Jul 19, 2011
Permit issued
Jun 25, 2012
Declared cost
$47,000
Address
1971 Wawona St

convert (e) lower level laundry into family room, build new walls below (e) rear yard deck, part of new family room, add new stairway from (e) upper level living to new family room. add foundation to lower level, add plywood to walls, re-work (e) washer & dryer to garage level.

Open the permit page

$47,000
Aug 13, 2010Completed
final sign-off Oct 2010
90 Westgate Drremove dry rot/ water damge front entry stair and replace with new stair to match (e) layout
Details
Permit
201008138737
Status
complete
Filed
Aug 13, 2010
Permit issued
Aug 13, 2010
Final sign-off
Oct 20, 2010
Declared cost
$7,500
Address
90 Westgate Dr

remove dry rot/ water damge front entry stair and replace with new stair to match (e) layout

Open the permit page

$7,500
Aug 19, 2008Never finaled
issued Aug 2008, no final
462 21st Avrepair dry rot stops of stairs & decks ( ~30% of deck @ rear stair). repair 120 sqft shingle at side of bldg. all work not visible from street.
Details
Permit
200808199485
Status
issued
Filed
Aug 19, 2008
Permit issued
Aug 19, 2008
Declared cost
$7,800
Address
462 21st Av

repair dry rot stops of stairs & decks ( ~30% of deck @ rear stair). repair 120 sqft shingle at side of bldg. all work not visible from street.

Open the permit page

$7,800