Back to bathroom remodel contractors
Rosconn Construction
- Based in
- El Granada
- On San Francisco permits
- Apr 2002 to Jan 2020
- Last 24 months
- 0 permits filed
47 permits since 2000: 36 completed, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 25, 2016 | Completed final sign-off Oct 2016 | 1124 Fell St | remove kitchen cabinets and install new. tile in bathroom.Details
remove kitchen cabinets and install new. tile in bathroom. | $26,000 |
| May 5, 2010 | Never finaled issued May 2010, no final | 4050 Geary Bl | repair dry rot at bottom wall next to bathroom, 7'/6" long ( max 7 studs, repl in kind at ground flr), no other work, replace gyp bdDetails
repair dry rot at bottom wall next to bathroom, 7'/6" long ( max 7 studs, repl in kind at ground flr), no other work, replace gyp bd | $1,800 |