Back to kitchen remodel contractors
Roly Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2018 to Aug 2026
- Last 24 months
- 13 permits filed
37 permits since 2000: 24 completed, 10 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 8 completed, 3 in progress. Typically 10 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress issued Aug 2026 | 263 08th Av | renovation at third floor apartment #265. replace 7 windows at street facade, 4 at side and rear, 1 new window at side. add 20 sq ft at existing light well. renovate kitchen, renovate 1 bathroom, add 1 new full bath.Details
renovation at third floor apartment #265. replace 7 windows at street facade, 4 at side and rear, 1 new window at side. add 20 sq ft at existing light well. renovate kitchen, renovate 1 bathroom, add 1 new full bath. | $140,000 |
| Sep 15, 2025 | In progress issued Dec 2025 | 1550 Diamond St | revision to pa #202501108136. relocate kitchen, change primary bath & half bath layout at 3rd floor. add one new fire rated window. window replacement at east, south and west facades. replace quardrail in kind at east facing roof deck. 2 new skylights.Details
revision to pa #202501108136. relocate kitchen, change primary bath & half bath layout at 3rd floor. add one new fire rated window. window replacement at east, south and west facades. replace quardrail in kind at east facing roof deck. 2 new skylights. | $78,000 |
| Jan 28, 2025 | Completed final sign-off Jun 2025 | 556 Laidley St | in-kind (1) kitchen remodel with electrical upgrade.Details
in-kind (1) kitchen remodel with electrical upgrade. | $28,000 |
| Jan 10, 2025 | In progress issued Jan 2025 | 1550 Diamond St | new conditioned space within existing first floor. replace 2 windows in kind - renovate kitchen and bath, relocate partitions at second floor - new furnace - add 1 new windowDetails
new conditioned space within existing first floor. replace 2 windows in kind - renovate kitchen and bath, relocate partitions at second floor - new furnace - add 1 new window | $45,000 |
| Sep 10, 2024 | Completed final sign-off Oct 2024 | 1550 Diamond St | comply with nov 201415981 and 201468241. remove existing kitchen at 3rd fl. installed without a permit. existing kitchen at 2nd fl to remainDetails
comply with nov 201415981 and 201468241. remove existing kitchen at 3rd fl. installed without a permit. existing kitchen at 2nd fl to remain | $3,500 |
| Jan 4, 2024 | Completed final sign-off Dec 2024 | 57 Russell St | upper unit #57 - remodel kitchen. remodel bathroom with (n) fixtures, (n) finishes; replace (rear windows); remove wall between kitchen & living room; add shear wallsDetails
upper unit #57 - remodel kitchen. remodel bathroom with (n) fixtures, (n) finishes; replace (rear windows); remove wall between kitchen & living room; add shear walls | $90,000 |
| Dec 19, 2022 | Completed final sign-off Dec 2023 | 550 Davis St | remodel (1) kitchen and 2 bathrooms, upgrade electrical panel, install new recessed lights, new outlets and switches. upgrade fireplace. non structural.Details
remodel (1) kitchen and 2 bathrooms, upgrade electrical panel, install new recessed lights, new outlets and switches. upgrade fireplace. non structural. | $80,000 |
| Nov 14, 2022 | Completed final sign-off Jun 2023 | 150 Lombard St | unit 806: kitchen remodel, new electrical, new plumbing, no structural or layout changesDetails
unit 806: kitchen remodel, new electrical, new plumbing, no structural or layout changes | $42,500 |
| Sep 29, 2022 | Completed final sign-off Jun 2023 | 47 San Jacinto Wy | remodel kitchen and 2 bathroom. there is a sign of water intrution so we will check and repairDetails
remodel kitchen and 2 bathroom. there is a sign of water intrution so we will check and repair | $68,000 |
| Sep 10, 2021 | Completed final sign-off Dec 2021 | 955 Corbett Av | partial remodel removing one base kitchen cabinet repalce counter refinish existing flooring and new kitchen tile replace combo toilet.Details
partial remodel removing one base kitchen cabinet repalce counter refinish existing flooring and new kitchen tile replace combo toilet. | $10,400 |
| Feb 7, 2020 | Completed final sign-off Mar 2021 | 841 Vallejo St | relocate kitchen to dining rm, convert the original kitchen to bath. remodel 1 e bath. construct new non structural partitions, 2 skylights, light fixtures, millworks, and finishes.Details
relocate kitchen to dining rm, convert the original kitchen to bath. remodel 1 e bath. construct new non structural partitions, 2 skylights, light fixtures, millworks, and finishes. | $60,000 |