Back to bathroom remodel contractors
Roly Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2018 to Aug 2026
- Last 24 months
- 13 permits filed
37 permits since 2000: 24 completed, 10 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 12 completed, 6 in progress, 1 never finaled. Typically 1 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress issued Aug 2026 | 263 08th Av | renovation at third floor apartment #265. replace 7 windows at street facade, 4 at side and rear, 1 new window at side. add 20 sq ft at existing light well. renovate kitchen, renovate 1 bathroom, add 1 new full bath.Details
renovation at third floor apartment #265. replace 7 windows at street facade, 4 at side and rear, 1 new window at side. add 20 sq ft at existing light well. renovate kitchen, renovate 1 bathroom, add 1 new full bath. | $140,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 3121 20th St | unit #3: remodel (1) full bathroom, (1) half bathroom with no changes.Details
unit #3: remodel (1) full bathroom, (1) half bathroom with no changes. | $21,000 |
| Dec 10, 2025 | Completed final sign-off Sep 2026 | 3121 20th St | unit 3: revision to permit 202512010627. replace tub with shower in existing bathroom.Details
unit 3: revision to permit 202512010627. replace tub with shower in existing bathroom. | $3,000 |
| Dec 1, 2025 | Completed final sign-off Sep 2026 | 3121 20th St | unit 3- remodel bathroom to inlcude repalce tub in kind. no wall removal or layout changes( fully sprinklered)Details
unit 3- remodel bathroom to inlcude repalce tub in kind. no wall removal or layout changes( fully sprinklered) | $16,400 |
| Sep 15, 2025 | In progress issued Dec 2025 | 1550 Diamond St | revision to pa #202501108136. relocate kitchen, change primary bath & half bath layout at 3rd floor. add one new fire rated window. window replacement at east, south and west facades. replace quardrail in kind at east facing roof deck. 2 new skylights.Details
revision to pa #202501108136. relocate kitchen, change primary bath & half bath layout at 3rd floor. add one new fire rated window. window replacement at east, south and west facades. replace quardrail in kind at east facing roof deck. 2 new skylights. | $78,000 |
| Mar 7, 2025 | In progress issued Mar 2025 | 1550 Diamond St | revision to pa #2025-0110-8136 remove unpermitted roof over deck at rear yard. replace windows at 2nd & 3rd fl. replace interior stair run from 2nd to 3rd fl. at 3rd fl, renovate one bath, add new full bath.Details
revision to pa #2025-0110-8136 remove unpermitted roof over deck at rear yard. replace windows at 2nd & 3rd fl. replace interior stair run from 2nd to 3rd fl. at 3rd fl, renovate one bath, add new full bath. | $36,000 |
| Jan 10, 2025 | In progress issued Jan 2025 | 1550 Diamond St | new conditioned space within existing first floor. replace 2 windows in kind - renovate kitchen and bath, relocate partitions at second floor - new furnace - add 1 new windowDetails
new conditioned space within existing first floor. replace 2 windows in kind - renovate kitchen and bath, relocate partitions at second floor - new furnace - add 1 new window | $45,000 |
| Sep 26, 2024 | Completed final sign-off May 2025 | 1283 Page St | add a new master bathroom located on the 2nd fl within e closets and bedroom. add 24" x 49" window at existing window locationDetails
add a new master bathroom located on the 2nd fl within e closets and bedroom. add 24" x 49" window at existing window location | $12,000 |
| Jun 26, 2024 | In progress issued Jun 2024 | 84 Eagle St | 1 bathroom remodel in kind with no changes of layout. non structuralDetails
1 bathroom remodel in kind with no changes of layout. non structural | $24,000 |
| Mar 4, 2024 | Completed final sign-off Jun 2024 | 550 Davis St | unit #35 @ 3rd floor: bathroom remodel like for like and (e) electrical fire place remodel (60sf)Details
unit #35 @ 3rd floor: bathroom remodel like for like and (e) electrical fire place remodel (60sf) | $42,000 |
| Jan 4, 2024 | Completed final sign-off Dec 2024 | 57 Russell St | upper unit #57 - remodel kitchen. remodel bathroom with (n) fixtures, (n) finishes; replace (rear windows); remove wall between kitchen & living room; add shear wallsDetails
upper unit #57 - remodel kitchen. remodel bathroom with (n) fixtures, (n) finishes; replace (rear windows); remove wall between kitchen & living room; add shear walls | $90,000 |
| Mar 14, 2023 | Completed final sign-off Apr 2023 | 550 Davis St | remodel (1) bathroom with no structural changes.Details
remodel (1) bathroom with no structural changes. | $16,500 |
| Mar 14, 2023 | Completed final sign-off Dec 2023 | 550 Davis St | revision of application# 202212198687: adding one more bathroom remodel with no structural changes to scope.Details
revision of application# 202212198687: adding one more bathroom remodel with no structural changes to scope. | $16,000 |
| Dec 19, 2022 | Completed final sign-off Dec 2023 | 550 Davis St | remodel (1) kitchen and 2 bathrooms, upgrade electrical panel, install new recessed lights, new outlets and switches. upgrade fireplace. non structural.Details
remodel (1) kitchen and 2 bathrooms, upgrade electrical panel, install new recessed lights, new outlets and switches. upgrade fireplace. non structural. | $80,000 |
| Sep 29, 2022 | Completed final sign-off Jun 2023 | 47 San Jacinto Wy | remodel kitchen and 2 bathroom. there is a sign of water intrution so we will check and repairDetails
remodel kitchen and 2 bathroom. there is a sign of water intrution so we will check and repair | $68,000 |
| Sep 29, 2022 | Completed final sign-off Sep 2023 | 2407 Harrison St | unit 9: remodel bathroom not changing floor planDetails
unit 9: remodel bathroom not changing floor plan | $20,000 |
| Dec 14, 2021 | Completed final sign-off Mar 2022 | 1490 43rd Av | complete demolition, installing new electrical, new plumbing, new fixtures, new tile, new paint (not removing any walls) (2 bathrooms)Details
complete demolition, installing new electrical, new plumbing, new fixtures, new tile, new paint (not removing any walls) (2 bathrooms) | $31,600 |
| Nov 24, 2020 | Never finaled issued Nov 2020, no final | 3454 Pierce St | master bathroom remodel 0 demo all (e), build pocket door framing, upgrade plumbing up to code; install shower head, relocate pipes and drain, install exhaust fan, build custom shower pan, build bench in shower pan, shampoo niche, replace floor tiles, new sink, new toiletDetails
master bathroom remodel 0 demo all (e), build pocket door framing, upgrade plumbing up to code; install shower head, relocate pipes and drain, install exhaust fan, build custom shower pan, build bench in shower pan, shampoo niche, replace floor tiles, new sink, new toilet | $22,000 |
| Feb 7, 2020 | Completed final sign-off Mar 2021 | 841 Vallejo St | relocate kitchen to dining rm, convert the original kitchen to bath. remodel 1 e bath. construct new non structural partitions, 2 skylights, light fixtures, millworks, and finishes.Details
relocate kitchen to dining rm, convert the original kitchen to bath. remodel 1 e bath. construct new non structural partitions, 2 skylights, light fixtures, millworks, and finishes. | $60,000 |