Back to bathroom remodel contractors
Roebuck Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to May 2024
- Last 24 months
- 0 permits filed
127 permits since 2000: 72 completed, 34 never finaled, 21 expired or cancelled.
Of the 34 never-finaled permits, 8 are 5 to 10 years old, 26 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 1 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 568 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2016 | Expired or cancelled expired Oct 2025 | 2337 Vallejo St | expansion of kitchen into rear garden w/ (n) roof deck above. (n) half bath, kitchen remodel & rear yard landscape improvements. expansion of basement under kitchen to create (n) guest room, bathroom, laundry & mechanical room on this level.Details
expansion of kitchen into rear garden w/ (n) roof deck above. (n) half bath, kitchen remodel & rear yard landscape improvements. expansion of basement under kitchen to create (n) guest room, bathroom, laundry & mechanical room on this level. | $300,000 |
| Oct 22, 2010 | Expired or cancelled cancelled Mar 2015 | 340 Pine St | change of use to permanent assembly space. convert basement storage as shown on plans into bathrooms. permit assembly space for ground floor.Details
change of use to permanent assembly space. convert basement storage as shown on plans into bathrooms. permit assembly space for ground floor. | $9,999 |
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 360 Pine St | demo (e) interior finishes, front entry door off lobby area & elevator cabin. refinish with all new materials. alter one partition wall to be move. door replacement & replace w/new door. accessible entrance reconstruction, elevator cab upgrade (e) accessible bathroom upgrade.Details
demo (e) interior finishes, front entry door off lobby area & elevator cabin. refinish with all new materials. alter one partition wall to be move. door replacement & replace w/new door. accessible entrance reconstruction, elevator cab upgrade (e) accessible bathroom upgrade. | $75,000 |
| Jul 5, 2006 | Completed final sign-off Jan 2008 | 2116 Baker St | removal of cabinetry, plumbing & electrical fixtures, plaster, & drywall finishes for 1 kitchen & 2 bathrooms.Details
removal of cabinetry, plumbing & electrical fixtures, plaster, & drywall finishes for 1 kitchen & 2 bathrooms. | $50,000 |