Back to kitchen remodel contractors
Robinson Renovations
- Based in
- San Rafael
- On San Francisco permits
- May 2014 to Sep 2020
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2018 | Completed final sign-off Feb 2019 | 88 King St | replace in kind kitchen cabinets. add pendant light. replace in kind shower, toilet, tile.Details
replace in kind kitchen cabinets. add pendant light. replace in kind shower, toilet, tile. | $65,000 |
| May 9, 2017 | Completed final sign-off Sep 2017 | 348 Church St | in-kind remodel of (e) kitchen& bathroom at (e) locations. new fixtures & finishes. no structural changes.Details
in-kind remodel of (e) kitchen& bathroom at (e) locations. new fixtures & finishes. no structural changes. | $12,000 |
| Feb 13, 2015 | Completed final sign-off Apr 2016 | 119 Corwin St | #2 - interior remodel includes an update kitchen, stair, living/dining room, and bathroom. hydronic radiant heat system will be added. no structural or exterior work intended under this permit.Details
#2 - interior remodel includes an update kitchen, stair, living/dining room, and bathroom. hydronic radiant heat system will be added. no structural or exterior work intended under this permit. | $120,000 |
| May 19, 2014 | Completed final sign-off Jul 2014 | 88 King St | remove old laminate floor/carpeting in 3 rooms and replace with new laminate. replace bathroom vanity, install new crown molding, baseboards in 3 rooms, tile backsplash in kitchen. new paint, new bath vent fan, led disc lights. new entry way fixture, replace 2 pendent lights.Details
remove old laminate floor/carpeting in 3 rooms and replace with new laminate. replace bathroom vanity, install new crown molding, baseboards in 3 rooms, tile backsplash in kitchen. new paint, new bath vent fan, led disc lights. new entry way fixture, replace 2 pendent lights. | $40,000 |