Back to kitchen remodel contractors
Roberts Hardware
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Apr 2026
- Last 24 months
- 1 permit filed
29 permits since 2000: 25 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2021 | Completed final sign-off Aug 2022 | 322 Presidio Av | unit #4: kitchen/bath remodel. install new kitchen cabinets, fooring, lighting, plumbing and electric. install new bathtub, tile, cabinets, flooring, plumbing and electric. covert existing wood burning fireplace to gas. no wall layout changes.Details
unit #4: kitchen/bath remodel. install new kitchen cabinets, fooring, lighting, plumbing and electric. install new bathtub, tile, cabinets, flooring, plumbing and electric. covert existing wood burning fireplace to gas. no wall layout changes. | $45,000 |
| Sep 4, 2015 | Completed final sign-off Jan 2016 | 1634 Haight St | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $25,000 |
| Feb 11, 2015 | Completed final sign-off Feb 2015 | 646 Greenwich St | unit #646. kitchen remodel: replace kitchen cabinets in same location, replace counters. no wall relocation. plumbing and electrical to be done by others.Details
unit #646. kitchen remodel: replace kitchen cabinets in same location, replace counters. no wall relocation. plumbing and electrical to be done by others. | $15,000 |
| Oct 7, 2014 | Completed final sign-off Jan 2015 | 4115 Kirkham St | upgrade heating plumbing, elec. ; replace rear 1 windows and 1 door ; u factor not> .4; (not seen from street);; bolt foundation, kitchen wall dryrot repair; insulate, relocate washerdryer.Details
upgrade heating plumbing, elec. ; replace rear 1 windows and 1 door ; u factor not> .4; (not seen from street);; bolt foundation, kitchen wall dryrot repair; insulate, relocate washerdryer. | $20,000 |
| May 27, 2009 | Completed final sign-off Jul 2017 | 672 Sacramento St | legalize hostel on the 3rd and 4th floors. reinstall cooking facilities in kitchen on 5th floor. work to comply with nov 200989221 and 200874821.Details
legalize hostel on the 3rd and 4th floors. reinstall cooking facilities in kitchen on 5th floor. work to comply with nov 200989221 and 200874821. | $25,000 |
| Jan 5, 2007 | Completed final sign-off Apr 2007 | 1484 Page St | kitchen remodel. replace kitchen cabinets & flooring. (no structural work) up date plumbing & electrical seperate permits. 50% or more lighting will be fluorscent.Details
kitchen remodel. replace kitchen cabinets & flooring. (no structural work) up date plumbing & electrical seperate permits. 50% or more lighting will be fluorscent. | $60,000 |
| Sep 22, 2003 | Completed final sign-off Jan 2006 | 762 Joost Av | 8'x15' 2 story kitchen addition, bathroom addition & bedroom remodelDetails
8'x15' 2 story kitchen addition, bathroom addition & bedroom remodel | $75,000 |