Back to bathroom remodel contractors
Roberts Hardware
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Apr 2026
- Last 24 months
- 1 permit filed
29 permits since 2000: 25 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 12 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2026 | Completed final sign-off May 2026 | 724 Cole St | unit #2 - bathroom remodel. like for like. no structural work.Details
unit #2 - bathroom remodel. like for like. no structural work. | $25,000 |
| Mar 4, 2024 | Completed final sign-off Jul 2024 | 1108 Masonic Av | add shower to existing bathroom- plumbing and electrical permits by othersDetails
add shower to existing bathroom- plumbing and electrical permits by others | $15,000 |
| Dec 15, 2021 | Completed final sign-off Aug 2022 | 322 Presidio Av | unit #4: kitchen/bath remodel. install new kitchen cabinets, fooring, lighting, plumbing and electric. install new bathtub, tile, cabinets, flooring, plumbing and electric. covert existing wood burning fireplace to gas. no wall layout changes.Details
unit #4: kitchen/bath remodel. install new kitchen cabinets, fooring, lighting, plumbing and electric. install new bathtub, tile, cabinets, flooring, plumbing and electric. covert existing wood burning fireplace to gas. no wall layout changes. | $45,000 |
| Oct 31, 2018 | Completed final sign-off Dec 2019 | 2760 Sacramento St | unit 12. bathroom remodel - repair sheetrock, new tub, tile, electrical receptacles, switches, fans, paint, hook-up for plumbingDetails
unit 12. bathroom remodel - repair sheetrock, new tub, tile, electrical receptacles, switches, fans, paint, hook-up for plumbing | $32,500 |
| Apr 11, 2017 | Completed final sign-off Jun 2017 | 909 Central Av | bathroom remodel - new shower/sink/toilet, tile.Details
bathroom remodel - new shower/sink/toilet, tile. | $30,000 |
| Sep 4, 2015 | Completed final sign-off Jan 2016 | 1634 Haight St | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $25,000 |
| May 15, 2014 | Completed final sign-off Jun 2014 | 807 Masonic Av | bathroom remodel. remove (e) tub, toilet, sink. install new tile, shower & fixtures. no structural.Details
bathroom remodel. remove (e) tub, toilet, sink. install new tile, shower & fixtures. no structural. | $15,000 |
| May 15, 2014 | Completed final sign-off Jun 2014 | 809 Masonic Av | bathroom remodel. remove (e) tub, toilet, sink. install new tile, shower & fixtures. no structural.Details
bathroom remodel. remove (e) tub, toilet, sink. install new tile, shower & fixtures. no structural. | $15,000 |
| Apr 20, 2011 | Completed final sign-off Jan 2012 | 4144 23rd St | dry rot repair lower bath approx 20 sf., all work in kindDetails
dry rot repair lower bath approx 20 sf., all work in kind | $3,500 |
| Nov 29, 2010 | Expired or cancelled expired Jan 2012 | 151 Broderick St | bathroom remodel: remove existing tub, sink & toilet, install new tile shower and fixtures. no structural, no wall relocation. elec and plumbing by othersDetails
bathroom remodel: remove existing tub, sink & toilet, install new tile shower and fixtures. no structural, no wall relocation. elec and plumbing by others | $28,000 |
| Oct 15, 2008 | Completed final sign-off Aug 2010 | 2452 Washington St | conversion of bathroom to storage area at third floor.Details
conversion of bathroom to storage area at third floor. | $4,500 |
| Nov 19, 2007 | Completed final sign-off Jan 2008 | 1145 Hayes St | (unit #15) bathroom remodel (no structural) repalcement of tile @floor & walls light fixture to be florescent or on an occupant sensorDetails
(unit #15) bathroom remodel (no structural) repalcement of tile @floor & walls light fixture to be florescent or on an occupant sensor | $15,000 |
| Sep 22, 2003 | Completed final sign-off Jan 2006 | 762 Joost Av | 8'x15' 2 story kitchen addition, bathroom addition & bedroom remodelDetails
8'x15' 2 story kitchen addition, bathroom addition & bedroom remodel | $75,000 |