Back to kitchen remodel contractors
Roberto De Leon
- Based in
- Novato
- On San Francisco permits
- Jul 2009 to Feb 2019
- Last 24 months
- 0 permits filed
47 permits since 2000: 30 completed, 13 never finaled, 4 expired or cancelled.
Of the 13 never-finaled permits, 7 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 14 completed, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2018 | Never finaled issued Nov 2018, no final | 3830 Divisadero St | unit 301: remodel kitchen, bathroom. new sheetrock throughout unit. replace in same location.Details
unit 301: remodel kitchen, bathroom. new sheetrock throughout unit. replace in same location. | $38,500 |
| Mar 29, 2018 | Never finaled issued Mar 2018, no final | 3830 Divisadero St | unit #201 - remodel kitchen, replace cabinets, remodel bathroom, replace shower bath tub, replace drywall of unit. no walls moved, removed added or infilled, all existing layouts to remain unchangedDetails
unit #201 - remodel kitchen, replace cabinets, remodel bathroom, replace shower bath tub, replace drywall of unit. no walls moved, removed added or infilled, all existing layouts to remain unchanged | $30,000 |
| Jan 26, 2018 | Completed final sign-off May 2018 | 1831 Pacific Av | kitchen remodel replace cabinets, kitchen floor upgrade power, plumbing new fixturesDetails
kitchen remodel replace cabinets, kitchen floor upgrade power, plumbing new fixtures | $20,000 |
| Jan 18, 2017 | Completed final sign-off Jun 2017 | 1831 Pacific Av | remodel (e) kitchen same place ( replace cabinets with counter , hardwood floor, remodel (e) bath (shower, tile , floor & walls)Details
remodel (e) kitchen same place ( replace cabinets with counter , hardwood floor, remodel (e) bath (shower, tile , floor & walls) | $18,000 |
| Oct 4, 2016 | Completed final sign-off Jun 2017 | 1030 Fell St | unit #7: remodel one kitchen: new cabinets,plumbing and electric, replace drywall, remodel one bath: replace shower pan, faucet, angle stop, replace heater (gas); maher n/aDetails
unit #7: remodel one kitchen: new cabinets,plumbing and electric, replace drywall, remodel one bath: replace shower pan, faucet, angle stop, replace heater (gas); maher n/a | $25,000 |
| Mar 30, 2016 | Completed final sign-off Jan 2017 | 1970 Fell St | unit 3: (e) light, kitchen hood & bath fan do not change; remodel (1) kitchen (cabinets, tile floor same place; replace drywall bedroom, hallway and living room; exterior wall type x5/8".Details
unit 3: (e) light, kitchen hood & bath fan do not change; remodel (1) kitchen (cabinets, tile floor same place; replace drywall bedroom, hallway and living room; exterior wall type x5/8". | $22,000 |
| Feb 16, 2016 | Completed final sign-off Oct 2016 | 3267 19th St | unit#4 remodel one kitchen & one bath. replace some drywall livingroom & bedroom, 200 sq ft.Details
unit#4 remodel one kitchen & one bath. replace some drywall livingroom & bedroom, 200 sq ft. | $24,000 |
| Apr 24, 2015 | Completed final sign-off Sep 2015 | 462 27th St | unit #1: remodel kitchen (replace cabinets, counter 8'x8') remodel bath (replace tub, tile 6'x6')Details
unit #1: remodel kitchen (replace cabinets, counter 8'x8') remodel bath (replace tub, tile 6'x6') | $18,000 |
| Feb 18, 2015 | Completed final sign-off Jul 2015 | 1030 Fell St | unit # 2 & 3 - 2nd flr. remodel kitchen (new cabinets, counter, tile floor) per unit. remodel (1) bathroom - tile floor & walls per unit. replace drywall in the entire unit (kitchen bath and room)Details
unit # 2 & 3 - 2nd flr. remodel kitchen (new cabinets, counter, tile floor) per unit. remodel (1) bathroom - tile floor & walls per unit. replace drywall in the entire unit (kitchen bath and room) | $60,000 |
| Dec 18, 2014 | Completed final sign-off Apr 2015 | 1030 Fell St | #5: remodel kitchen - cabinets with counter. remodel 1 bathroom - tile, floor & shower. replace drywall - kitchen, bath, living room.Details
#5: remodel kitchen - cabinets with counter. remodel 1 bathroom - tile, floor & shower. replace drywall - kitchen, bath, living room. | $30,000 |
| Nov 3, 2014 | Completed final sign-off Apr 2016 | 646 Corbett Av | unit#504. remodel 1 kitchen replace cabinets, tile floor. remodel 1 bathroom replace tub, tile, shower & floor. replace drywall in entire unit. 1800 sq ft for water damage. no change on walls.Details
unit#504. remodel 1 kitchen replace cabinets, tile floor. remodel 1 bathroom replace tub, tile, shower & floor. replace drywall in entire unit. 1800 sq ft for water damage. no change on walls. | $60,000 |
| Oct 15, 2014 | Completed final sign-off Feb 2015 | 646 Corbett Av | #404 & #604: #404- remodel kitchen, replace cabinets, tile floor. remodel bath, replace tub, tile shower & floor. replace drywall in entire #404 for water damage, 1800 sq.ft, all high efficacy lighting. #604- replace 1 window, not visable from street u<0.32Details
#404 & #604: #404- remodel kitchen, replace cabinets, tile floor. remodel bath, replace tub, tile shower & floor. replace drywall in entire #404 for water damage, 1800 sq.ft, all high efficacy lighting. #604- replace 1 window, not visable from street u<0.32 | $20,000 |
| Oct 15, 2014 | Never finaled issued Oct 2014, no final | 1900 Vallejo St | #100- remodel kitchen, replace cabinets, floor. remodel bath, replace toilet, tub & tile shower. no change in wall & opening layout, no change in lighting.Details
#100- remodel kitchen, replace cabinets, floor. remodel bath, replace toilet, tub & tile shower. no change in wall & opening layout, no change in lighting. | $15,000 |
| Aug 27, 2014 | Completed final sign-off Feb 2015 | 1030 Fell St | unit #8: remodel kitchen-cabinets, with counter, remodel bathroom tile floor and shower, replace dry wall in the entire unit (kitchen, bath,living rm, closet); maher n/aDetails
unit #8: remodel kitchen-cabinets, with counter, remodel bathroom tile floor and shower, replace dry wall in the entire unit (kitchen, bath,living rm, closet); maher n/a | $18,000 |
| May 7, 2013 | Completed final sign-off Feb 2014 | 835 Fillmore St | new kitchen, new bathroom, convert extg 1 bathroom to laundry room. reconfigure layout of 2 bathrooms adding a hallway. replace and re surface extg kitchen.Details
new kitchen, new bathroom, convert extg 1 bathroom to laundry room. reconfigure layout of 2 bathrooms adding a hallway. replace and re surface extg kitchen. | $25,000 |
| May 7, 2013 | Never finaled issued Jul 2013, no final | 899 Green St | kitchen remodel at unit #501: replace kitchen cabinets with granite counter, install tile in kitchen floor. no new wall and no wall relocation. repatch minor damaged sheet rock in-kind as (e) where required for electrical and plumbing work. lighting shall comply with cec 150(k)8.Details
kitchen remodel at unit #501: replace kitchen cabinets with granite counter, install tile in kitchen floor. no new wall and no wall relocation. repatch minor damaged sheet rock in-kind as (e) where required for electrical and plumbing work. lighting shall comply with cec 150(k)8. | $10,000 |
| May 7, 2012 | Completed final sign-off Jan 2013 | 410 15th Av | unit 7:replace kitchen cabinets, replace hardwood floor. install tile in kitchen. replace electric subpanel and add 4 circuits to kitchen and 6 receptacles. replace drain pipe same place.Details
unit 7:replace kitchen cabinets, replace hardwood floor. install tile in kitchen. replace electric subpanel and add 4 circuits to kitchen and 6 receptacles. replace drain pipe same place. | $10,000 |
| Oct 31, 2011 | Completed final sign-off Apr 2012 | 71 Valparaiso St | remodel 1 kitchen. replace cabinets with counter top, tile floor, replace p-trap and water line supply. remodel 1 bath, replace bath tub, sink cabinet, tile shower walls and floor. to comply with nov #201165148. replace all outlets (10) light switch, light fixtures (6).Details
remodel 1 kitchen. replace cabinets with counter top, tile floor, replace p-trap and water line supply. remodel 1 bath, replace bath tub, sink cabinet, tile shower walls and floor. to comply with nov #201165148. replace all outlets (10) light switch, light fixtures (6). | $10,000 |
| Sep 25, 2009 | Never finaled issued Sep 2009, no final | 1545 Buchanan St | work @ unit#6 only. kitchen-replace countertop & sink: replace electric stove and dish washer-tile floor. dish washer-tile floor. living room & bedroom -replace carpet.bathroom replace bath tub and tile shower/toilet, tile floor. no add and moving walls.Details
work @ unit#6 only. kitchen-replace countertop & sink: replace electric stove and dish washer-tile floor. dish washer-tile floor. living room & bedroom -replace carpet.bathroom replace bath tub and tile shower/toilet, tile floor. no add and moving walls. | $18,500 |
| Jul 28, 2009 | Expired or cancelled expired Mar 2011 | 1040 Ashbury St | #4: replace kitchen cabinetsDetails
#4: replace kitchen cabinets | $4,200 |