Back to kitchen remodel contractors
Rl Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2022 to Dec 2024
- Last 24 months
- 1 permit filed
15 permits since 2000: 11 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 in progress. Typically 0 days from filing to permit and 48 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2024 | Completed final sign-off Nov 2024 | 216 Los Palmos Dr | (1) kitchen remodel. (1) bathroom remodel with shower pan. upgrade electrical panel to 125 amps.Details
(1) kitchen remodel. (1) bathroom remodel with shower pan. upgrade electrical panel to 125 amps. | $65,000 |
| Jul 9, 2024 | Completed final sign-off Sep 2024 | 260 Chattanooga St | unit 2: remodel 1 kitchen, 1 bathroom with tub, 1 bathroom with shower pan, replace washer and dryer and upgrade electrical subpanel to 100 ampsDetails
unit 2: remodel 1 kitchen, 1 bathroom with tub, 1 bathroom with shower pan, replace washer and dryer and upgrade electrical subpanel to 100 amps | $68,000 |
| May 22, 2024 | In progress issued Jun 2024 | 2919 Pine St | remodel 2nd fl to match e remodel at 1st fl. move kitchen and bath plus add 1 bathrm. remove 1 window,add bath window, shorten kitchen window. replace siding in kind, as needed, seismic upgrade to upper level.Details
remodel 2nd fl to match e remodel at 1st fl. move kitchen and bath plus add 1 bathrm. remove 1 window,add bath window, shorten kitchen window. replace siding in kind, as needed, seismic upgrade to upper level. | $95,000 |
| Oct 30, 2023 | Completed final sign-off Nov 2023 | 226 Los Palmos Dr | revision to permit 202310108351 (existing kitchen remodel). remove non-load bearing wall between kitchen and dining room.Details
revision to permit 202310108351 (existing kitchen remodel). remove non-load bearing wall between kitchen and dining room. | |
| Oct 10, 2023 | Completed final sign-off Nov 2023 | 226 Los Palmos Dr | kitchen remodel: plumbing electrical remove old cabinets and installing new cabinets. now wall removed.Details
kitchen remodel: plumbing electrical remove old cabinets and installing new cabinets. now wall removed. | $22,350 |
| Aug 25, 2023 | Completed final sign-off Oct 2023 | 420 Tehama St | scope of work limited to replace old counter top with new granite counter top at existing kitchen.Details
scope of work limited to replace old counter top with new granite counter top at existing kitchen. | $2,300 |
| May 5, 2023 | Completed final sign-off Jun 2023 | 1900 Vallejo St | work @ unit# 204. kitchen remodel gfci install add breaker dishwasher microwave, hood, fridge, add receptors in bedrooms, plumbing in kitchen shut off valve and angle stops.Details
work @ unit# 204. kitchen remodel gfci install add breaker dishwasher microwave, hood, fridge, add receptors in bedrooms, plumbing in kitchen shut off valve and angle stops. | $31,750 |
| Aug 31, 2022 | Completed final sign-off Dec 2022 | 260 Chattanooga St | unit #1: remodel kitchen and (2) bathrooms with electrical & plumbing work. one bath with tub, one bath with shower. no structural workDetails
unit #1: remodel kitchen and (2) bathrooms with electrical & plumbing work. one bath with tub, one bath with shower. no structural work | $60,000 |