Rl Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2022 to Dec 2024
- Last 24 months
- 1 permit filed
15 permits since 2000: 11 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 in progress, 1 never finaled. Typically 8 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2024 | Completed final sign-off Nov 2024 | 216 Los Palmos Dr | (1) kitchen remodel. (1) bathroom remodel with shower pan. upgrade electrical panel to 125 amps.Details
(1) kitchen remodel. (1) bathroom remodel with shower pan. upgrade electrical panel to 125 amps. | $65,000 |
| Jul 9, 2024 | Completed final sign-off Sep 2024 | 260 Chattanooga St | unit 2: remodel 1 kitchen, 1 bathroom with tub, 1 bathroom with shower pan, replace washer and dryer and upgrade electrical subpanel to 100 ampsDetails
unit 2: remodel 1 kitchen, 1 bathroom with tub, 1 bathroom with shower pan, replace washer and dryer and upgrade electrical subpanel to 100 amps | $68,000 |
| May 22, 2024 | In progress issued Jun 2024 | 2919 Pine St | remodel 2nd fl to match e remodel at 1st fl. move kitchen and bath plus add 1 bathrm. remove 1 window,add bath window, shorten kitchen window. replace siding in kind, as needed, seismic upgrade to upper level.Details
remodel 2nd fl to match e remodel at 1st fl. move kitchen and bath plus add 1 bathrm. remove 1 window,add bath window, shorten kitchen window. replace siding in kind, as needed, seismic upgrade to upper level. | $95,000 |
| Jul 3, 2023 | Never finaled issued Sep 2023, no final | 2919 Pine St | revision to pa# 201802221911, modify interior plan layout, relocate interior partition walls, eliminate 3rd bedroom, change 1/2 bath to full and add laundry closet, new windows (street facing) & doors.Details
revision to pa# 201802221911, modify interior plan layout, relocate interior partition walls, eliminate 3rd bedroom, change 1/2 bath to full and add laundry closet, new windows (street facing) & doors. | |
| Nov 15, 2022 | Completed final sign-off Dec 2022 | 838 Bay St | complete master bathroom with tub. medium bathroom remodel with shower pan. both bathrooms will have electrical and plumbing permits.Details
complete master bathroom with tub. medium bathroom remodel with shower pan. both bathrooms will have electrical and plumbing permits. | $22,000 |
| Aug 31, 2022 | Completed final sign-off Dec 2022 | 260 Chattanooga St | unit #1: remodel kitchen and (2) bathrooms with electrical & plumbing work. one bath with tub, one bath with shower. no structural workDetails
unit #1: remodel kitchen and (2) bathrooms with electrical & plumbing work. one bath with tub, one bath with shower. no structural work | $60,000 |