Back to kitchen remodel contractors
Rivera Builders
- Based in
- Daly City
- On San Francisco permits
- Oct 2010 to Jul 2026
- Last 24 months
- 14 permits filed
86 permits since 2000: 74 completed, 2 in progress, 7 never finaled, 3 expired or cancelled.
Of the 7 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2026 | Completed final sign-off Sep 2026 | 1766 Cayuga Av | kitchen remodel, no wall alterations, new cabinets, new electrical and plumbing as needed.Details
kitchen remodel, no wall alterations, new cabinets, new electrical and plumbing as needed. | $18,500 |
| Nov 18, 2022 | Expired or cancelled cancelled May 2026 | 434 02nd Av | for 436 2md ave: complete kitchen remodel: with new floors, cabinets and electrical and plumbing fixtures.Details
for 436 2md ave: complete kitchen remodel: with new floors, cabinets and electrical and plumbing fixtures. | $19,500 |
| Sep 28, 2021 | Completed final sign-off Jun 2022 | 2274 30th Av | one kitchen and one bath remodel with new electrical and plumbing for both bath and kitchen. no wall alterationDetails
one kitchen and one bath remodel with new electrical and plumbing for both bath and kitchen. no wall alteration | $24,500 |
| Sep 14, 2021 | Completed final sign-off May 2022 | 401 Los Palmos Dr | complete kitchen remodel with new cabinets new counter tops, electrical and plumbing no wall alteration. lighting comply with cec 150.0(k).Details
complete kitchen remodel with new cabinets new counter tops, electrical and plumbing no wall alteration. lighting comply with cec 150.0(k). | $19,500 |
| Sep 7, 2021 | Completed final sign-off Mar 2022 | 2694 21st Av | one kitchen remodel: installing new cabinets, new counter tops, with new electrical and plumbing. no wall alteration. lighting comply with cec 150.0 (k)Details
one kitchen remodel: installing new cabinets, new counter tops, with new electrical and plumbing. no wall alteration. lighting comply with cec 150.0 (k) | $19,500 |
| Jul 14, 2020 | Completed final sign-off Mar 2021 | 1652 Hayes St | kitchen remodel inkind. replace kitchen cabinets, countertops, refinish hardwood floor as need, plumbling & electrical as need for (n) applicances & fixtures.Details
kitchen remodel inkind. replace kitchen cabinets, countertops, refinish hardwood floor as need, plumbling & electrical as need for (n) applicances & fixtures. | $20,000 |
| Nov 14, 2019 | Completed final sign-off Jul 2020 | 115 Kensington Wy | 1 kitchen, 1 bath remodel. replace 5 windows in the kitchen and dining rm and bedrooms with milgard wood fiber clad in e openingsDetails
1 kitchen, 1 bath remodel. replace 5 windows in the kitchen and dining rm and bedrooms with milgard wood fiber clad in e openings | $30,000 |
| Apr 28, 2014 | Completed final sign-off Mar 2015 | 1749 Sutter St | interior remodel of kitchen, master bathroom & master bedroom. new kitchen cabinets & appliances. replace (e) french doors, relocate (e) windows, enlarge master bathroom & hall bathroom. relocate wall between living room & master bedroom.Details
interior remodel of kitchen, master bathroom & master bedroom. new kitchen cabinets & appliances. replace (e) french doors, relocate (e) windows, enlarge master bathroom & hall bathroom. relocate wall between living room & master bedroom. | $74,000 |
| Mar 3, 2014 | Completed final sign-off Mar 2014 | 220 Arlington St | dry rot repair under kitchen floor, remove and replace 2x8 floor joist with pressure treat new lumber and new 4x8 beam to support joist spand, replace existing beam 4x8" with post.Details
dry rot repair under kitchen floor, remove and replace 2x8 floor joist with pressure treat new lumber and new 4x8 beam to support joist spand, replace existing beam 4x8" with post. | $4,800 |
| Jun 15, 2011 | Completed final sign-off Aug 2011 | 189 Galewood Cr | kitchen remodel at 2nd floor: replace countertop, new sink, faucet, cabinets, wood flooring & overhead lights (5 pieces) including painting at wall and cabinets. no wall relocation.Details
kitchen remodel at 2nd floor: replace countertop, new sink, faucet, cabinets, wood flooring & overhead lights (5 pieces) including painting at wall and cabinets. no wall relocation. | $6,800 |
| Mar 9, 2011 | Completed final sign-off Jun 2011 | 170 Galewood Cr | remodeling 1 kitchen. replace kitchen cabinets, kitchen sink, hood, and new counter top. (not wall alterations). installing new ceiling lighting. lighting to wall window doors. lighting to comply w/ cec.Details
remodeling 1 kitchen. replace kitchen cabinets, kitchen sink, hood, and new counter top. (not wall alterations). installing new ceiling lighting. lighting to wall window doors. lighting to comply w/ cec. | $9,200 |