Back to bathroom remodel contractors
Rivera Builders
- Based in
- Daly City
- On San Francisco permits
- Oct 2010 to Jul 2026
- Last 24 months
- 14 permits filed
86 permits since 2000: 74 completed, 2 in progress, 7 never finaled, 3 expired or cancelled.
Of the 7 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 13 completed. Typically 0 days from filing to permit and 177 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2024 | Completed final sign-off Dec 2024 | 186 Brewster St | 2nd floor: complete remodel of master bathroom and kids bathroom. no wall alterationDetails
2nd floor: complete remodel of master bathroom and kids bathroom. no wall alteration | $22,500 |
| Jun 11, 2024 | Completed final sign-off Dec 2024 | 566 07th Av | master bathroom remodel. new plumbing fixtures & electrical in bathroom. no wall alteration. all in kind.Details
master bathroom remodel. new plumbing fixtures & electrical in bathroom. no wall alteration. all in kind. | $16,500 |
| Nov 18, 2022 | Completed final sign-off Mar 2023 | 110 Webster St | revision to pa# 201609228546 & 202212289269, to maintain existing bath and storage space at ground floor with one car garage.Details
revision to pa# 201609228546 & 202212289269, to maintain existing bath and storage space at ground floor with one car garage. | |
| Mar 30, 2022 | Completed final sign-off Aug 2022 | 958 Page St | remodel bathroom with new plumbing & electrical fixtures. no wall alteration. in-kind sf approox. 63 sf.Details
remodel bathroom with new plumbing & electrical fixtures. no wall alteration. in-kind sf approox. 63 sf. | $18,500 |
| Sep 28, 2021 | Completed final sign-off Jun 2022 | 2274 30th Av | one kitchen and one bath remodel with new electrical and plumbing for both bath and kitchen. no wall alterationDetails
one kitchen and one bath remodel with new electrical and plumbing for both bath and kitchen. no wall alteration | $24,500 |
| Nov 14, 2019 | Completed final sign-off Jul 2020 | 115 Kensington Wy | 1 kitchen, 1 bath remodel. replace 5 windows in the kitchen and dining rm and bedrooms with milgard wood fiber clad in e openingsDetails
1 kitchen, 1 bath remodel. replace 5 windows in the kitchen and dining rm and bedrooms with milgard wood fiber clad in e openings | $30,000 |
| Dec 14, 2016 | Completed final sign-off Mar 2017 | 1747 Lane St | remodel bathroom in unit with new shower, upgrade plumbing and electrical in bathroom and replace window in bathroom, same size with vinyl window. no moving or addition of walls, like for like.Details
remodel bathroom in unit with new shower, upgrade plumbing and electrical in bathroom and replace window in bathroom, same size with vinyl window. no moving or addition of walls, like for like. | $4,800 |
| Jun 14, 2016 | Completed final sign-off Mar 2017 | 210 Cortland Av | expand living area into existing basement area - add connecting stair, master bedroom , m. bath suite, den & floye.Details
expand living area into existing basement area - add connecting stair, master bedroom , m. bath suite, den & floye. | $50,000 |
| Mar 15, 2016 | Completed final sign-off Aug 2016 | 210 Cortland Av | to comply with nov# 201495231 to remove basement slab & bathroom installed w/o permits, and to comply with nov# 201318782, to remove deck in rearDetails
to comply with nov# 201495231 to remove basement slab & bathroom installed w/o permits, and to comply with nov# 201318782, to remove deck in rear | |
| Sep 21, 2015 | Completed final sign-off Dec 2017 | 51 Holly Park Cr | convert existing basement to media room with new interior stair to 1/f and add a full bathroom on ground floor. no work visible from street.Details
convert existing basement to media room with new interior stair to 1/f and add a full bathroom on ground floor. no work visible from street. | $50,000 |
| Apr 28, 2014 | Completed final sign-off Mar 2015 | 1749 Sutter St | interior remodel of kitchen, master bathroom & master bedroom. new kitchen cabinets & appliances. replace (e) french doors, relocate (e) windows, enlarge master bathroom & hall bathroom. relocate wall between living room & master bedroom.Details
interior remodel of kitchen, master bathroom & master bedroom. new kitchen cabinets & appliances. replace (e) french doors, relocate (e) windows, enlarge master bathroom & hall bathroom. relocate wall between living room & master bedroom. | $74,000 |
| Jul 2, 2013 | Completed final sign-off Jul 2014 | 785 Guerrero St | bathroom remodelling: replace sink, tub, wall and floor finishes. electrical upgrade in bathroom only. no new wall & no existing wall relocation. peermanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors - cec 150(k)10.Details
bathroom remodelling: replace sink, tub, wall and floor finishes. electrical upgrade in bathroom only. no new wall & no existing wall relocation. peermanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors - cec 150(k)10. | $6,800 |
| Jan 21, 2011 | Completed final sign-off May 2011 | 2475 Lombard St | remodel (e) bath and (e) w/c on 2nd fl. add sink in w/c and toilet in (e) bathDetails
remodel (e) bath and (e) w/c on 2nd fl. add sink in w/c and toilet in (e) bath | $15,000 |