Back to kitchen remodel contractors
Richards Best Builder
- Based in
- Oakland
- On San Francisco permits
- Sep 2019 to Apr 2026
- Last 24 months
- 3 permits filed
9 permits since 2000: 7 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 1 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 209 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2026 | In progress issued Apr 2026 | 1707 33rd Av | kitchen: new cabinets, add disposal & dishwasher, add outlets, replace plumbing and electrical. bathroom: replace shower pan, replace floor and wall tiles, waterproof shower, replace plumbing and electrical.Details
kitchen: new cabinets, add disposal & dishwasher, add outlets, replace plumbing and electrical. bathroom: replace shower pan, replace floor and wall tiles, waterproof shower, replace plumbing and electrical. | $40,000 |
| Apr 15, 2022 | Never finaled issued Apr 2022, no final | 195 09th Av | kitchen and bathroom remodel. cabinets upgrade. replacement of plumbing fixtures. upgrade of existing electric outlets to be gfci. upgrade tile floor for bath 1 kitchen and shower walls. lay out to be the same (no hanges). no new wall & no (e)wall relocation. new lighting comply cec 150.0(k)3 & (k)5Details
kitchen and bathroom remodel. cabinets upgrade. replacement of plumbing fixtures. upgrade of existing electric outlets to be gfci. upgrade tile floor for bath 1 kitchen and shower walls. lay out to be the same (no hanges). no new wall & no (e)wall relocation. new lighting comply cec 150.0(k)3 & (k)5 | $34,000 |
| Jun 25, 2021 | Completed final sign-off Jan 2022 | 447 Dolores St | one kitchen remodel - remove (e) cabinets, countertops, appliances, light fixtures, plumbing fixtures, flooring, and baseboards from the kitchen area. upgrade cabinets, floors, and fixtures. add new recessed lights on ceiling upgrade electrical subpanel in the garage to add more circuitsDetails
one kitchen remodel - remove (e) cabinets, countertops, appliances, light fixtures, plumbing fixtures, flooring, and baseboards from the kitchen area. upgrade cabinets, floors, and fixtures. add new recessed lights on ceiling upgrade electrical subpanel in the garage to add more circuits | $27,000 |