Richards Best Builder
- Based in
- Oakland
- On San Francisco permits
- Sep 2019 to Apr 2026
- Last 24 months
- 3 permits filed
9 permits since 2000: 7 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 1 in progress, 1 never finaled. Typically 6 days from filing to permit and 53 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2026 | In progress issued Apr 2026 | 1707 33rd Av | kitchen: new cabinets, add disposal & dishwasher, add outlets, replace plumbing and electrical. bathroom: replace shower pan, replace floor and wall tiles, waterproof shower, replace plumbing and electrical.Details
kitchen: new cabinets, add disposal & dishwasher, add outlets, replace plumbing and electrical. bathroom: replace shower pan, replace floor and wall tiles, waterproof shower, replace plumbing and electrical. | $40,000 |
| Apr 15, 2022 | Never finaled issued Apr 2022, no final | 195 09th Av | kitchen and bathroom remodel. cabinets upgrade. replacement of plumbing fixtures. upgrade of existing electric outlets to be gfci. upgrade tile floor for bath 1 kitchen and shower walls. lay out to be the same (no hanges). no new wall & no (e)wall relocation. new lighting comply cec 150.0(k)3 & (k)5Details
kitchen and bathroom remodel. cabinets upgrade. replacement of plumbing fixtures. upgrade of existing electric outlets to be gfci. upgrade tile floor for bath 1 kitchen and shower walls. lay out to be the same (no hanges). no new wall & no (e)wall relocation. new lighting comply cec 150.0(k)3 & (k)5 | $34,000 |
| Aug 13, 2020 | Completed final sign-off Dec 2020 | 275 Burnett Av | shower walls restoration, remove existing shower tiles wall and prepare for new tile wall installation. replacing of shower valve faucet. upgrade regular electric outlet to be a new gfci. bathroom approx 5'x8'. all work in kindDetails
shower walls restoration, remove existing shower tiles wall and prepare for new tile wall installation. replacing of shower valve faucet. upgrade regular electric outlet to be a new gfci. bathroom approx 5'x8'. all work in kind | $10,600 |
| Aug 7, 2020 | Completed final sign-off Oct 2020 | 790 07th Av | unit 103: bathroom renovation (5x8): remove (e) bath tub and install shower stall. replace plumbing & electrical fixtures.Details
unit 103: bathroom renovation (5x8): remove (e) bath tub and install shower stall. replace plumbing & electrical fixtures. | $14,800 |