Back to kitchen remodel contractors
Richard R Muhl Construction
- Based in
- Petaluma
- On San Francisco permits
- Mar 2001 to Mar 2014
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 89 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2010 | Completed final sign-off Dec 2010 | 360 Guerrero St | replace kitchen cabinetry, countertop, appliances & flr. covering. replace bathroom vanity, toilet, tub. improve lighting & vent fan with high efficacy units. improve accessible with grab bars and ada approved fixtures.Details
replace kitchen cabinetry, countertop, appliances & flr. covering. replace bathroom vanity, toilet, tub. improve lighting & vent fan with high efficacy units. improve accessible with grab bars and ada approved fixtures. | $30,000 |
| Apr 23, 2009 | Completed final sign-off Jun 2009 | 137 Caselli Av | kitchen remodel, install new cabinets, lighting, outlets, relocate range, refrigerator, remove pantry closet.Details
kitchen remodel, install new cabinets, lighting, outlets, relocate range, refrigerator, remove pantry closet. | $15,000 |
| Aug 23, 2001 | Completed final sign-off Nov 2001 | 1831 Castro St | remove & remodel exist kitchen, new sink, cabinets and recessed lights.Details
remove & remodel exist kitchen, new sink, cabinets and recessed lights. | $18,000 |