Back to bathroom remodel contractors
Richard R Muhl Construction
- Based in
- Petaluma
- On San Francisco permits
- Mar 2001 to Mar 2014
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2014 | Completed final sign-off May 2014 | 2447 Vallejo St | replace existing cabinets and exhaust fan with new cabinets and microwave/fan combo, reconfigure closet for vent dyer to exterior at combustion air. install new dwv, water supply, 30 amp circuits. replace 1 recessed heat light for heat lamp in bath. repair drywall and flooring needed to remove plumbDetails
replace existing cabinets and exhaust fan with new cabinets and microwave/fan combo, reconfigure closet for vent dyer to exterior at combustion air. install new dwv, water supply, 30 amp circuits. replace 1 recessed heat light for heat lamp in bath. repair drywall and flooring needed to remove plumb | $3,700 |
| May 10, 2010 | Completed final sign-off Dec 2010 | 360 Guerrero St | replace kitchen cabinetry, countertop, appliances & flr. covering. replace bathroom vanity, toilet, tub. improve lighting & vent fan with high efficacy units. improve accessible with grab bars and ada approved fixtures.Details
replace kitchen cabinetry, countertop, appliances & flr. covering. replace bathroom vanity, toilet, tub. improve lighting & vent fan with high efficacy units. improve accessible with grab bars and ada approved fixtures. | $30,000 |
| Aug 25, 2004 | Completed final sign-off Nov 2004 | 990 Guerrero St | bath remodel, remove/replace tub vanity lavatory. install shower fan light combo, no structural alteDetails
bath remodel, remove/replace tub vanity lavatory. install shower fan light combo, no structural alte | $21,000 |
| Jun 8, 2004 | Completed final sign-off Sep 2004 | 413 Lily St | bath remodel. replace new floor coving in unit2. install new vanites in bath. replace bath showerDetails
bath remodel. replace new floor coving in unit2. install new vanites in bath. replace bath shower | $20,000 |
| Feb 5, 2004 | Completed final sign-off May 2004 | 316 Douglass St | bath remodel, remove and replace toilet, lavatory, shower serround, relocate lighting and switches,Details
bath remodel, remove and replace toilet, lavatory, shower serround, relocate lighting and switches, | $20,000 |
| Mar 19, 2001 | Completed final sign-off Aug 2001 | 926 Elizabeth St | bath remodel. 2nd flr. add new tub, toilet lavy, new wall , new door, new floor, new fluencent lightDetails
bath remodel. 2nd flr. add new tub, toilet lavy, new wall , new door, new floor, new fluencent light | $18,625 |