Rich Armusewicz Construction
- Based in
- Novato
- On San Francisco permits
- Jan 2008 to Jun 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 2 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 68 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2016 | Completed final sign-off Jul 2017 | 50 Burnside Av | replace extg garage door with window, replace extg balcony with landing and spiral stair at back yard. replace extg int. stair, replace extg ground floor bathroom, new bedroom at ground floor. new 1 hour separation at extg garage.Details
replace extg garage door with window, replace extg balcony with landing and spiral stair at back yard. replace extg int. stair, replace extg ground floor bathroom, new bedroom at ground floor. new 1 hour separation at extg garage. | $25,000 |