Rich Armusewicz Construction

Contractor license
777228
State license record
Based in
Novato
On San Francisco permits
Jan 2008 to Jun 2021
Last 24 months
0 permits filed

5 permits since 2000: 2 completed, 3 never finaled.

Of the 3 never-finaled permits, 3 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllStairs 1Bathroom remodel 4

4 bathroom remodel permits: 2 completed, 2 never finaled. Typically 1 days from filing to permit and 124 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 7, 2017Never finaled
issued Apr 2017, no final
3614 Taraval Strev to pa201703282623: reduction of scope: back bathroom remains unchanged and unaltered.
Details
Permit
201704073459
Permit issued
Apr 7, 2017

rev to pa201703282623: reduction of scope: back bathroom remains unchanged and unaltered.

Open the permit page

Mar 28, 2017Never finaled
issued Mar 2017, no final
3614 Taraval Stremodel back bathroom into ada, remove non load bearing wall. remove front bathroom.
Details
Permit
201703282623
Permit issued
Mar 30, 2017

remodel back bathroom into ada, remove non load bearing wall. remove front bathroom.

Open the permit page

$15,000
Nov 4, 2016Completed
final sign-off Jul 2017
50 Burnside Avreplace extg garage door with window, replace extg balcony with landing and spiral stair at back yard. replace extg int. stair, replace extg ground floor bathroom, new bedroom at ground floor. new 1 hour separation at extg garage.
Details
Permit
201611042053
Permit issued
Jan 11, 2017
Final sign-off
Jul 26, 2017

replace extg garage door with window, replace extg balcony with landing and spiral stair at back yard. replace extg int. stair, replace extg ground floor bathroom, new bedroom at ground floor. new 1 hour separation at extg garage.

Open the permit page

$25,000
Jan 14, 2008Completed
final sign-off Mar 2008
2628 Laguna Strevision to pa# 2007/07/10/6358. remodel (e) master bathroom. remodel (e) 1/2 bath. install new lighting & plumbing fixtures. lighting fixtures to be fluorescant or on occupant sensor. no structural.
Details
Permit
200801142440
Permit issued
Jan 14, 2008
Final sign-off
Mar 6, 2008

revision to pa# 2007/07/10/6358. remodel (e) master bathroom. remodel (e) 1/2 bath. install new lighting & plumbing fixtures. lighting fixtures to be fluorescant or on occupant sensor. no structural.

Open the permit page

$28,000