Back to kitchen remodel contractors
Reveal Partners
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Jul 2026
- Last 24 months
- 8 permits filed
69 permits since 2000: 58 completed, 2 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 15 completed, 1 in progress. Typically 0 days from filing to permit and 205 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2026 | In progress filed Jul 2026, not yet issued | 89 Lake Forest Ct | 2nd fl: interior renovation of (e) 2nd floor. kitchen + (2) bath. new electrical, plumbing + insulation throughout. cathedral ceiling w/ view window in living room. (n) decorative gas firelace to replace masonry. no change to ground floor, roof, or street facing elevation. window/stucco work.Details
2nd fl: interior renovation of (e) 2nd floor. kitchen + (2) bath. new electrical, plumbing + insulation throughout. cathedral ceiling w/ view window in living room. (n) decorative gas firelace to replace masonry. no change to ground floor, roof, or street facing elevation. window/stucco work. | $500,000 |
| Mar 13, 2025 | Completed final sign-off Oct 2025 | 1600 Lake St | revision to pa#202109309605-structural only. existing dining room window to remain(not enlarge) extend 2nd fl. ftao shearwall. strengthen post in garage/1st fl. enlarge footing at post. revise 2nd fl. framing over kitchen, existing deficient, change wd bm to stl bm/kitchen.Details
revision to pa#202109309605-structural only. existing dining room window to remain(not enlarge) extend 2nd fl. ftao shearwall. strengthen post in garage/1st fl. enlarge footing at post. revise 2nd fl. framing over kitchen, existing deficient, change wd bm to stl bm/kitchen. | $10,000 |
| Sep 30, 2021 | Completed final sign-off Oct 2025 | 1600 Lake St | replace driveway gate, enlarge garage, replace lower level windows. replace windows in kitchen & dining w/ larger. replace 2nd level master bathroom windows.Details
replace driveway gate, enlarge garage, replace lower level windows. replace windows in kitchen & dining w/ larger. replace 2nd level master bathroom windows. | $250,000 |
| Apr 23, 2021 | Completed final sign-off Oct 2025 | 1600 Lake St | interior remodel (non structural). lower level: guest bedrm and bathrm. main level: kitchen, dining and family rm. 2nd level: master bedroom closet/bath.Details
interior remodel (non structural). lower level: guest bedrm and bathrm. main level: kitchen, dining and family rm. 2nd level: master bedroom closet/bath. | $150,000 |
| Nov 16, 2020 | Completed final sign-off Mar 2021 | 887 Rhode Island St | unit #885 & 887: re-tile bathroom/shower & floor. wood floor patch in kitchen. paint throughout. existing plumbing fixtures.Details
unit #885 & 887: re-tile bathroom/shower & floor. wood floor patch in kitchen. paint throughout. existing plumbing fixtures. | $20,000 |
| Jan 14, 2020 | Completed final sign-off Nov 2020 | 301 Bryant St | kitchen remodel in kind. no structural work. comply w/ cec 150.0 (k) 3Details
kitchen remodel in kind. no structural work. comply w/ cec 150.0 (k) 3 | $50,000 |
| Oct 24, 2018 | Completed final sign-off Nov 2018 | 1045 Lake St | to comply with nov #201890575 & 201890621. for kitchen & bath remodeling in unit 1. no change on walls. unit #1.Details
to comply with nov #201890575 & 201890621. for kitchen & bath remodeling in unit 1. no change on walls. unit #1. | $5,000 |
| Feb 12, 2018 | Completed final sign-off Oct 2018 | 355 Bryant St | kitchen remodel. replace in kind cabinets, counters, sink, faucet, new ceiling lighting, new appliances. n/a maherDetails
kitchen remodel. replace in kind cabinets, counters, sink, faucet, new ceiling lighting, new appliances. n/a maher | $50,000 |
| Jul 10, 2017 | Completed final sign-off Jul 2017 | 2939 Folsom St | add plans to existing kitchen and bath remodel with wall changes ref 201702179660Details
add plans to existing kitchen and bath remodel with wall changes ref 201702179660 | |
| Feb 17, 2017 | Completed final sign-off Jul 2017 | 2939 Folsom St | kitchen & bathroom remodel, replace in kind, new plumbing fixtures, new electrical fixtures, new cabinets, new floor & wall coverings.Details
kitchen & bathroom remodel, replace in kind, new plumbing fixtures, new electrical fixtures, new cabinets, new floor & wall coverings. | $75,000 |
| Jul 8, 2016 | Completed final sign-off Mar 2017 | 67 Crags Ct | kitchen remodel: new cabinets, countertops, plumbing fixtures. bathroom remodel: new plumbing fixtures, new tiles. no change on walls.Details
kitchen remodel: new cabinets, countertops, plumbing fixtures. bathroom remodel: new plumbing fixtures, new tiles. no change on walls. | $75,000 |
| Dec 16, 2015 | Completed final sign-off Jul 2016 | 254 Clinton Pk | replace in-kind kitchen and bathroom. no structural work.Details
replace in-kind kitchen and bathroom. no structural work. | $75,000 |
| Nov 24, 2014 | Completed final sign-off Jul 2015 | 2750 36th Av | renovate kitchen and dining room, convert interior lightwell to living space. new skylightsDetails
renovate kitchen and dining room, convert interior lightwell to living space. new skylights | $65,000 |
| Oct 17, 2014 | Completed final sign-off Mar 2015 | 601 04th St | #321 - bathroom remodel & kitchen remodel, new wood floor, new lighting. compliance with maher ordinance no 155-13 not required.Details
#321 - bathroom remodel & kitchen remodel, new wood floor, new lighting. compliance with maher ordinance no 155-13 not required. | $55,000 |
| Jul 14, 2014 | Completed final sign-off Jun 2015 | 142 Ord St | top unit - remodel bathroom, fixture location will change, add urinal, replace (e) skylight; add exhaust fan, repair dryrot in back of kitchen area. to comply with cec150(k) 10Details
top unit - remodel bathroom, fixture location will change, add urinal, replace (e) skylight; add exhaust fan, repair dryrot in back of kitchen area. to comply with cec150(k) 10 | $50,000 |
| Jun 30, 2014 | Completed final sign-off Sep 2014 | 2938 Washington St | new range hood at existing kitchen. fire alarm work under separate permit. and suppression system for hood & duct.Details
new range hood at existing kitchen. fire alarm work under separate permit. and suppression system for hood & duct. | $28,000 |