Back to bathroom remodel contractors
Reveal Partners
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Jul 2026
- Last 24 months
- 8 permits filed
69 permits since 2000: 58 completed, 2 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 20 completed, 2 in progress. Typically 0 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2026 | In progress filed Jul 2026, not yet issued | 89 Lake Forest Ct | 2nd fl: interior renovation of (e) 2nd floor. kitchen + (2) bath. new electrical, plumbing + insulation throughout. cathedral ceiling w/ view window in living room. (n) decorative gas firelace to replace masonry. no change to ground floor, roof, or street facing elevation. window/stucco work.Details
2nd fl: interior renovation of (e) 2nd floor. kitchen + (2) bath. new electrical, plumbing + insulation throughout. cathedral ceiling w/ view window in living room. (n) decorative gas firelace to replace masonry. no change to ground floor, roof, or street facing elevation. window/stucco work. | $500,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 637 19th Av | interior bathroom remodel with no strutrual work. converting tub to shower and removing pony wall.Details
interior bathroom remodel with no strutrual work. converting tub to shower and removing pony wall. | $60,000 |
| Jul 11, 2025 | Completed final sign-off Jun 2026 | 125 Randall St | convert existing pantry into new bathroom (toilet, vanity & shower). convert bedroom closet into laundry room with washer and dryerDetails
convert existing pantry into new bathroom (toilet, vanity & shower). convert bedroom closet into laundry room with washer and dryer | $50,000 |
| Oct 3, 2024 | Completed final sign-off Jul 2025 | 78 Wawona St | replace lower bathroom in kind. add a landing for bath fl. foundation replacement in the vicinity of the bathDetails
replace lower bathroom in kind. add a landing for bath fl. foundation replacement in the vicinity of the bath | $880,000 |
| Aug 5, 2024 | Completed final sign-off Mar 2025 | 46 Lippard Av | bathroom remodel. remove wall between toilet and bathroom.Details
bathroom remodel. remove wall between toilet and bathroom. | $75,000 |
| Sep 30, 2021 | Completed final sign-off Oct 2025 | 1600 Lake St | replace driveway gate, enlarge garage, replace lower level windows. replace windows in kitchen & dining w/ larger. replace 2nd level master bathroom windows.Details
replace driveway gate, enlarge garage, replace lower level windows. replace windows in kitchen & dining w/ larger. replace 2nd level master bathroom windows. | $250,000 |
| Apr 23, 2021 | Completed final sign-off Oct 2025 | 1600 Lake St | interior remodel (non structural). lower level: guest bedrm and bathrm. main level: kitchen, dining and family rm. 2nd level: master bedroom closet/bath.Details
interior remodel (non structural). lower level: guest bedrm and bathrm. main level: kitchen, dining and family rm. 2nd level: master bedroom closet/bath. | $150,000 |
| Nov 16, 2020 | Completed final sign-off Mar 2021 | 887 Rhode Island St | unit #885 & 887: re-tile bathroom/shower & floor. wood floor patch in kitchen. paint throughout. existing plumbing fixtures.Details
unit #885 & 887: re-tile bathroom/shower & floor. wood floor patch in kitchen. paint throughout. existing plumbing fixtures. | $20,000 |
| Aug 28, 2020 | Completed final sign-off Jan 2021 | 461 02nd St | unit 226: replace in-kind bathroom remodel. no wall relocation.Details
unit 226: replace in-kind bathroom remodel. no wall relocation. | $45,000 |
| Aug 7, 2019 | Completed final sign-off Nov 2019 | 355 Bryant St | #404: bathroom remodel - replace shower stall with new plumbing fixtures and tile on floor nad walls. shower stall replace in kind. no structural work. comply w/czc150.0(k)5.Details
#404: bathroom remodel - replace shower stall with new plumbing fixtures and tile on floor nad walls. shower stall replace in kind. no structural work. comply w/czc150.0(k)5. | $40,000 |
| Dec 17, 2018 | Completed final sign-off Feb 2020 | 355 Bryant St | two bathrooms remodel. replace in kind. new fixtures and finishes. no walls moved, removed, added or installed. all existing layouts to remain unchangedDetails
two bathrooms remodel. replace in kind. new fixtures and finishes. no walls moved, removed, added or installed. all existing layouts to remain unchanged | $75,000 |
| Oct 24, 2018 | Completed final sign-off Nov 2018 | 1045 Lake St | to comply with nov #201890575 & 201890621. for kitchen & bath remodeling in unit 1. no change on walls. unit #1.Details
to comply with nov #201890575 & 201890621. for kitchen & bath remodeling in unit 1. no change on walls. unit #1. | $5,000 |
| May 23, 2018 | Completed final sign-off Jan 2019 | 3021 Washington St | replace in kind bathroom on street level. replace in kind windows on south face, level 2 & 3. windows and sliding doors not visible from the street.Details
replace in kind bathroom on street level. replace in kind windows on south face, level 2 & 3. windows and sliding doors not visible from the street. | $100,000 |
| May 10, 2018 | Completed final sign-off Aug 2019 | 355 Bryant St | unit #104: bathroom remodel. replace in kind. mew plumbing fixtures/new tiles. no structural work. no wall modification; n/a maherDetails
unit #104: bathroom remodel. replace in kind. mew plumbing fixtures/new tiles. no structural work. no wall modification; n/a maher | $50,000 |
| Aug 18, 2017 | Completed final sign-off Mar 2018 | 142 Mallorca Wy | bathroom remodel/replace in kind. new tile, plumbing fixtures and vanity cabinet.Details
bathroom remodel/replace in kind. new tile, plumbing fixtures and vanity cabinet. | $50,000 |
| Jul 10, 2017 | Completed final sign-off Jul 2017 | 2939 Folsom St | add plans to existing kitchen and bath remodel with wall changes ref 201702179660Details
add plans to existing kitchen and bath remodel with wall changes ref 201702179660 | |
| Feb 17, 2017 | Completed final sign-off Jul 2017 | 2939 Folsom St | kitchen & bathroom remodel, replace in kind, new plumbing fixtures, new electrical fixtures, new cabinets, new floor & wall coverings.Details
kitchen & bathroom remodel, replace in kind, new plumbing fixtures, new electrical fixtures, new cabinets, new floor & wall coverings. | $75,000 |
| Jul 8, 2016 | Completed final sign-off Mar 2017 | 67 Crags Ct | kitchen remodel: new cabinets, countertops, plumbing fixtures. bathroom remodel: new plumbing fixtures, new tiles. no change on walls.Details
kitchen remodel: new cabinets, countertops, plumbing fixtures. bathroom remodel: new plumbing fixtures, new tiles. no change on walls. | $75,000 |
| Dec 16, 2015 | Completed final sign-off Jul 2016 | 254 Clinton Pk | replace in-kind kitchen and bathroom. no structural work.Details
replace in-kind kitchen and bathroom. no structural work. | $75,000 |
| Jul 16, 2015 | Completed final sign-off Jun 2016 | 1354 Green St | bathroom addition within existing envelope 2nd fl, add toilet, shower stall, vanity, tub. replace in kind window unit on west wall.Details
bathroom addition within existing envelope 2nd fl, add toilet, shower stall, vanity, tub. replace in kind window unit on west wall. | $50,000 |
| Oct 17, 2014 | Completed final sign-off Mar 2015 | 601 04th St | #321 - bathroom remodel & kitchen remodel, new wood floor, new lighting. compliance with maher ordinance no 155-13 not required.Details
#321 - bathroom remodel & kitchen remodel, new wood floor, new lighting. compliance with maher ordinance no 155-13 not required. | $55,000 |
| Jul 14, 2014 | Completed final sign-off Jun 2015 | 142 Ord St | top unit - remodel bathroom, fixture location will change, add urinal, replace (e) skylight; add exhaust fan, repair dryrot in back of kitchen area. to comply with cec150(k) 10Details
top unit - remodel bathroom, fixture location will change, add urinal, replace (e) skylight; add exhaust fan, repair dryrot in back of kitchen area. to comply with cec150(k) 10 | $50,000 |