Ren Lei Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Aug 2026
- Last 24 months
- 18 permits filed
238 permits since 2000: 172 completed, 14 in progress, 28 never finaled, 24 expired or cancelled.
Of the 28 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
7 roof deck permits: 5 completed, 1 in progress, 1 never finaled. Typically 30 days from filing to permit and 568 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2024 | Completed final sign-off Dec 2025 | 331 Capistrano Av | to comply with nov #202423535 front window replacement. remove juliet balcony. update 3rd fl modification. add roof deck at front. ground floor unit to be addressed under seperate permit. unit 201408063132 - legalize dwelling unit without permit per ordDetails
to comply with nov #202423535 front window replacement. remove juliet balcony. update 3rd fl modification. add roof deck at front. ground floor unit to be addressed under seperate permit. unit 201408063132 - legalize dwelling unit without permit per ord | $12,000 |
| May 8, 2024 | Completed final sign-off Jun 2024 | 215 03rd Av | to comply w/ nov 202421698 to include 1st floor - add wet bar and enclose stairs with (n)wall and door. 2nd floor add window in pantry and glass guardrail. 3rd floor add window in bedroom and bathroom and update name of roof deck, roof framing and light tubeDetails
to comply w/ nov 202421698 to include 1st floor - add wet bar and enclose stairs with (n)wall and door. 2nd floor add window in pantry and glass guardrail. 3rd floor add window in bedroom and bathroom and update name of roof deck, roof framing and light tube | $10,000 |
| Jan 21, 2022 | In progress issued May 2025 | 1737 Webster St | remodel (e) unit residential home. remodel includes vertical addition for new story and roof deck @ 4th level, and 235 cy excavation for new basement. horizontal expansion, no additional depth into rear proposed, except permitted bay @ second level.Details
remodel (e) unit residential home. remodel includes vertical addition for new story and roof deck @ 4th level, and 235 cy excavation for new basement. horizontal expansion, no additional depth into rear proposed, except permitted bay @ second level. | $800,000 |
| Jul 27, 2018 | Completed final sign-off Jun 2020 | 2327 Fillmore St | to comply with nov 201876673 add 3 story elevator. ne bathroom, bedroom & family room on 1st flr. new roof deck on attice level and convert attic to habitable space and add (5) 8'x8' dormers. remove stucco on front facade and restore (e) wood siding. convert 2 2 bedrm/2 bathrooms to 1,3,3 aDetails
to comply with nov 201876673 add 3 story elevator. ne bathroom, bedroom & family room on 1st flr. new roof deck on attice level and convert attic to habitable space and add (5) 8'x8' dormers. remove stucco on front facade and restore (e) wood siding. convert 2 2 bedrm/2 bathrooms to 1,3,3 a | $180,000 |
| Oct 8, 2013 | Completed final sign-off May 2015 | 715 32nd Av | remodel (e) single family home interior living areas. new roof deck on 3rd floor or new balcony on 2nd floor. replace (e) windows w/new, same size in (e) location at front/rear areas. remodel kitchen & bathroom. repair/replace "in kind" (e) exterior surface. (n) family, bed/bath @ g/fDetails
remodel (e) single family home interior living areas. new roof deck on 3rd floor or new balcony on 2nd floor. replace (e) windows w/new, same size in (e) location at front/rear areas. remodel kitchen & bathroom. repair/replace "in kind" (e) exterior surface. (n) family, bed/bath @ g/f | $150,000 |
| Jul 30, 2013 | Completed final sign-off Dec 2015 | 101 Maple St | revision to pa# 2012-0221-4556/s1-modify interior partitins, interior stairs, bathroom & kitchen location. new accessible roof deck. modifications of structural design.Details
revision to pa# 2012-0221-4556/s1-modify interior partitins, interior stairs, bathroom & kitchen location. new accessible roof deck. modifications of structural design. | $90,000 |
| Jul 24, 2013 | Never finaled issued Sep 2013, no final | 1083 Pacheco St | new roof deck with stairs down to 9e) patio area, new stucco and wood siding to replace (e) shingle, reconfigure front window (n) aluminum cladDetails
new roof deck with stairs down to 9e) patio area, new stucco and wood siding to replace (e) shingle, reconfigure front window (n) aluminum clad | $5,000 |