Ren Lei Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Aug 2026
- Last 24 months
- 18 permits filed
238 permits since 2000: 172 completed, 14 in progress, 28 never finaled, 24 expired or cancelled.
Of the 28 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
21 deck permits: 12 completed, 2 in progress, 2 never finaled, 5 expired or cancelled. Typically 12 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2025 | In progress issued Mar 2026 | 534 18th Av | comply with nov 202316929 horizontal three story addition at rear. add 2 bed and 1.5 bath & entertainment, wet bar with 2 elec burner, expand kitchen and dinning room, add shower on 2nd fl. remove bed room on 3rd fl. add one bathroom on 3rd fl. remove deck at rear item number 4.Details
comply with nov 202316929 horizontal three story addition at rear. add 2 bed and 1.5 bath & entertainment, wet bar with 2 elec burner, expand kitchen and dinning room, add shower on 2nd fl. remove bed room on 3rd fl. add one bathroom on 3rd fl. remove deck at rear item number 4. | $250,000 |
| Jul 1, 2025 | In progress issued Jul 2025 | 534 18th Av | comply w/ nov 202316929 item #3 and #4. replace all plaster inside the house (2000 sqft), remodel (3) bathrooms and (1) kitchen. replace stucco in front of building in kind. item #4 deck repair is less than 50%. baths 40 sq ft, 40 sq ft, 25 sq ft. kitch. 200 sq ft. no moving walls.Details
comply w/ nov 202316929 item #3 and #4. replace all plaster inside the house (2000 sqft), remodel (3) bathrooms and (1) kitchen. replace stucco in front of building in kind. item #4 deck repair is less than 50%. baths 40 sq ft, 40 sq ft, 25 sq ft. kitch. 200 sq ft. no moving walls. | $50,000 |
| Sep 9, 2021 | Expired or cancelled withdrawn Mar 2022 | 1557 Francisco St | revision to 202102104392. relocate entry door on 1st fl. relocate fire place and remove n fire place, reconfigure laundry on 3rd fl. reconfig closet and fire place on 4th fl and convert roof to deckDetails
revision to 202102104392. relocate entry door on 1st fl. relocate fire place and remove n fire place, reconfigure laundry on 3rd fl. reconfig closet and fire place on 4th fl and convert roof to deck | $12,000 |
| Oct 10, 2019 | Completed final sign-off Apr 2021 | 3520 Fulton St | new 2 bedrooms 2 bathrooms unit on basement level. add bathroom to 2nd floor. replace rear windows and delay repair of deck and stair as in kind less than 50%Details
new 2 bedrooms 2 bathrooms unit on basement level. add bathroom to 2nd floor. replace rear windows and delay repair of deck and stair as in kind less than 50% | $96,000 |
| Jul 1, 2015 | Completed final sign-off Sep 2023 | 1335 Divisadero St | new 3 story addition @ southwest corner (rear yard) 3'-7" wide x 26'-5" long. 2 new decks @ rear yard. a 10'-0" wide deck @ the 3rd floor projecting 3' off the back wall. a 15'-6" wide deck. 12'-8" into back yard. max 4' high. 1 hour wall @ pl. replace the existing kitchen at 2/f ** maher: n/a **Details
new 3 story addition @ southwest corner (rear yard) 3'-7" wide x 26'-5" long. 2 new decks @ rear yard. a 10'-0" wide deck @ the 3rd floor projecting 3' off the back wall. a 15'-6" wide deck. 12'-8" into back yard. max 4' high. 1 hour wall @ pl. replace the existing kitchen at 2/f ** maher: n/a ** | $72,000 |
| May 6, 2015 | Completed final sign-off Jul 2015 | 138 Milton St | as built revision to 201503050121. remove partiton wall, remove 1 bath, demo rear deck, rebuild rear stairs. n/a ordinance #155-13Details
as built revision to 201503050121. remove partiton wall, remove 1 bath, demo rear deck, rebuild rear stairs. n/a ordinance #155-13 | |
| Feb 27, 2015 | Completed final sign-off Dec 2015 | 101 Maple St | scope includes construction of the garage level expansion the full width of the rear yard setback, remodel of a kitchen and construction of new deck above kitchen into the rear yard setback of 30'-6" from jackson street. revision to permit no.201202214556, 201307303143 andDetails
scope includes construction of the garage level expansion the full width of the rear yard setback, remodel of a kitchen and construction of new deck above kitchen into the rear yard setback of 30'-6" from jackson street. revision to permit no.201202214556, 201307303143 and | |
| Mar 4, 2014 | Expired or cancelled cancelled Mar 2018 | 135 14th Av | add bew 9' high deck (5'-8" x 6'-11") at second floor rear of property. 5' from property line.Details
add bew 9' high deck (5'-8" x 6'-11") at second floor rear of property. 5' from property line. | $11,000 |
| Dec 27, 2013 | Completed final sign-off Feb 2014 | 2926 Pine St | to comply w/ 200339866 & 201340661. repair exterior stairs & deck. about 15-20% stair will be replaced. including replacing wood deterioration at deck stairs. provide ledger & post for deck above ground fl at east side of the bldg.Details
to comply w/ 200339866 & 201340661. repair exterior stairs & deck. about 15-20% stair will be replaced. including replacing wood deterioration at deck stairs. provide ledger & post for deck above ground fl at east side of the bldg. | $8,000 |
| Oct 8, 2013 | Expired or cancelled cancelled Jan 2026 | 663 Marina Bl | remove extg bathroom to replace for a new living area.new stairs to retractable roof hatch. remove part of fake sloped roofs. new guardrail and exterior handrails, new deck flooring.Details
remove extg bathroom to replace for a new living area.new stairs to retractable roof hatch. remove part of fake sloped roofs. new guardrail and exterior handrails, new deck flooring. | $20,000 |
| Aug 15, 2013 | Expired or cancelled cancelled Nov 2015 | 663 Marina Bl | 3/f: remove (e) bathrom, to replace for a new living area, new stairs to terrace. terrace floor: remove part of fake sloped roofs, new opening for new stairs, new guardrail and exterior handrails, new deck flooringDetails
3/f: remove (e) bathrom, to replace for a new living area, new stairs to terrace. terrace floor: remove part of fake sloped roofs, new opening for new stairs, new guardrail and exterior handrails, new deck flooring | $10,000 |
| May 7, 2013 | Completed final sign-off Mar 2015 | 663 Marina Bl | repair & upgrade rear deck, stair,& handrails. replace all windows as in kind new family room, bedroom, bathroom, pair bedroom, office and upgrade internal stairs. remodel kitchen and half bath at 2nd floor with new gas fire place. remodel 3rd floor bedrooms & bathroom. nw 3rd floor master bathroomDetails
repair & upgrade rear deck, stair,& handrails. replace all windows as in kind new family room, bedroom, bathroom, pair bedroom, office and upgrade internal stairs. remodel kitchen and half bath at 2nd floor with new gas fire place. remodel 3rd floor bedrooms & bathroom. nw 3rd floor master bathroom | $145,000 |
| Apr 16, 2013 | Never finaled issued Jul 2013, no final | 135 14th Av | revise pa# 2012/10/10/1770 to address nov# 201393402. correct width dimension of back addition area from 8'x11' to 8'x8'; revise scope of work to include 1 new dormers & internal stairs to attic. remove rear deck from porject.Details
revise pa# 2012/10/10/1770 to address nov# 201393402. correct width dimension of back addition area from 8'x11' to 8'x8'; revise scope of work to include 1 new dormers & internal stairs to attic. remove rear deck from porject. | $15,000 |
| Feb 5, 2013 | Completed final sign-off Feb 2014 | 1083 Pacheco St | remodel of extg resdntial s.f.d., interior living area, repair/upgrade extg rear exterior deck & stairs, handrails, guardrails, replace extg wndw with nw same size windows in extg locations at front/rear areas. repair/replace in kind extg exterior finishes. 1st fl: new office & 1/2 bth & nw grg drDetails
remodel of extg resdntial s.f.d., interior living area, repair/upgrade extg rear exterior deck & stairs, handrails, guardrails, replace extg wndw with nw same size windows in extg locations at front/rear areas. repair/replace in kind extg exterior finishes. 1st fl: new office & 1/2 bth & nw grg dr | $115,000 |
| Jan 17, 2013 | Completed final sign-off Feb 2013 | 619 Visitacion Av | 4 (n) storage rooms at ground floor. (n) deck at rear 2nd floor.Details
4 (n) storage rooms at ground floor. (n) deck at rear 2nd floor. | $20,000 |
| Nov 15, 2012 | Completed final sign-off Feb 2020 | 561 Valley St | rear addition, new decks, new bedrooms, foundation work, new living space.Details
rear addition, new decks, new bedrooms, foundation work, new living space. | $575,000 |
| Oct 2, 2012 | Never finaled issued Jul 2013, no final | 166 Edinburgh St | rebuild and legalize deck at rear. replace 1 slider and 5 windows. u=0.40 max. comply with 201257121. (windows to be replaced in kind).Details
rebuild and legalize deck at rear. replace 1 slider and 5 windows. u=0.40 max. comply with 201257121. (windows to be replaced in kind). | $10,000 |
| Jul 10, 2012 | Completed final sign-off Nov 2012 | 246 11th Av | revision to appl #2012.0413.8273 - relocate closet at ground floor & rebuild deck in rear as in kind, remove (e) property line window & infill lightwell at second floor, (3) new skylight & window at 2nd floor, revise 3rd floor bathroom.Details
revision to appl #2012.0413.8273 - relocate closet at ground floor & rebuild deck in rear as in kind, remove (e) property line window & infill lightwell at second floor, (3) new skylight & window at 2nd floor, revise 3rd floor bathroom. | $12,000 |
| Jun 22, 2012 | Expired or cancelled cancelled Sep 2017 | 751 25th Av | construction of connecting bridges from office space to exterior deck & from deck to (e) adjacent building. architectural screen panels will be installed at the exterior deck.Details
construction of connecting bridges from office space to exterior deck & from deck to (e) adjacent building. architectural screen panels will be installed at the exterior deck. | $2,000 |
| Aug 28, 2009 | Completed final sign-off Mar 2010 | 1663 16th Av | two story 5'-9" horizontal addition and a new 15'-9" deck.Details
two story 5'-9" horizontal addition and a new 15'-9" deck. | $35,000 |
| Jun 2, 2009 | Completed final sign-off Jul 2009 | 716 18th Av | add a deck at rear of the house- less than 10'-0" deep.Details
add a deck at rear of the house- less than 10'-0" deep. | $6,000 |