Remodeling Heroes Inc.
- Based in
- Concord
- On San Francisco permits
- Jan 2020 to Oct 2026
- Last 24 months
- 24 permits filed
93 permits since 2000: 58 completed, 13 in progress, 13 never finaled, 9 expired or cancelled.
Of the 13 never-finaled permits, 5 are 3 to 5 years old, 8 are 5 to 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 1 in progress, 1 never finaled. Typically 100 days from filing to permit and 281 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2025 | Completed final sign-off Nov 2025 | 174 Arbor St | revision 202406184700- document purpose to include sprial staircase shop drawings/engineering.Details
revision 202406184700- document purpose to include sprial staircase shop drawings/engineering. | |
| Jun 17, 2022 | Never finaled filed Jun 2022, never issued | 1012 Shrader St | remove (e) chimney. (n) code compliant stairs at 3rd flr to 4th flr at rear. (n) dormers at 4th flr. convert (e) attic to habitable conditioned space. (n) vert addition. (n) deck at roof.Details
remove (e) chimney. (n) code compliant stairs at 3rd flr to 4th flr at rear. (n) dormers at 4th flr. convert (e) attic to habitable conditioned space. (n) vert addition. (n) deck at roof. | $70,000 |
| Oct 7, 2021 | Completed final sign-off Nov 2022 | 2079 44th Av | remodeling 1 kitchen, 2 bathrooms, interior remodel to convert (e) garage to 371sf habitable space 1 bedroom, remove load bearign walls,r elocate washer/dryer to 1/f per plans, upgrade electrical and 200a, new rear deck with stairs.Details
remodeling 1 kitchen, 2 bathrooms, interior remodel to convert (e) garage to 371sf habitable space 1 bedroom, remove load bearign walls,r elocate washer/dryer to 1/f per plans, upgrade electrical and 200a, new rear deck with stairs. | $50,000 |
| May 13, 2021 | In progress issued Jul 2026 | 2432 Santiago St | interior remodel of the 1st and 2nd floors of an existing fully-detached single family residence. including a new rear exterior deck with stairsDetails
interior remodel of the 1st and 2nd floors of an existing fully-detached single family residence. including a new rear exterior deck with stairs | $400,000 |
| Mar 9, 2021 | Completed final sign-off Mar 2023 | 47 Winfield St | kitchen renovation. interior stair rebuilt.Details
kitchen renovation. interior stair rebuilt. | $50,000 |