Back to bathroom remodel contractors
Remodeling Heroes Inc.
- Based in
- Concord
- On San Francisco permits
- Jan 2020 to Oct 2026
- Last 24 months
- 24 permits filed
93 permits since 2000: 58 completed, 13 in progress, 13 never finaled, 9 expired or cancelled.
Of the 13 never-finaled permits, 5 are 3 to 5 years old, 8 are 5 to 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
52 bathroom remodel permits: 33 completed, 5 in progress, 8 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1307 04th Av | work on 1307 4th ave only: bathroom remodel to reconfigure the bathroom, replace sink, fan, toilet and bathtub to shower (curbless) approximately 39sfDetails
work on 1307 4th ave only: bathroom remodel to reconfigure the bathroom, replace sink, fan, toilet and bathtub to shower (curbless) approximately 39sf | $28,000 |
| Sep 25, 2026 | In progress issued Sep 2026 | 2 Fallon Pl | unit # 52: laundry cabinet in the bathroom closetDetails
unit # 52: laundry cabinet in the bathroom closet | $10,000 |
| Aug 20, 2026 | In progress issued Aug 2026 | 1463 Pacific Av | like for like bathroom remodel, no structual changes, no removal of walls, replace lights, fan ,toilet, vanity. no tub to shower conversions, all work is interior.Details
like for like bathroom remodel, no structual changes, no removal of walls, replace lights, fan ,toilet, vanity. no tub to shower conversions, all work is interior. | $22,000 |
| Jan 9, 2026 | In progress issued Jan 2026 | 1527 11th Av | minor interior remodel of an attached sfd. including kitchen, bath, remodel 1st fl and new full bath and closets on 3rd flDetails
minor interior remodel of an attached sfd. including kitchen, bath, remodel 1st fl and new full bath and closets on 3rd fl | $110,000 |
| Oct 17, 2025 | Completed final sign-off Jan 2026 | 75 Vienna St | one bathroom remodel, like for like. no structural changes. replace toilet, shower, vanity, sin, fan upgrade. safety bars. mep to code. 41 sq ftDetails
one bathroom remodel, like for like. no structural changes. replace toilet, shower, vanity, sin, fan upgrade. safety bars. mep to code. 41 sq ft | $30,000 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 1325 Divisadero St | unit 104: bathroom remodel shower like for like 35 sqft, kitchen remodel like for like 65 sqft.Details
unit 104: bathroom remodel shower like for like 35 sqft, kitchen remodel like for like 65 sqft. | $48,000 |
| Aug 19, 2025 | Completed final sign-off Apr 2026 | 1587 11th Av | convert 92 sqft of (e) garage/den area on the 1st fl. to conditioned space for a new full bathroom and vestibule, with washer/dryer hookups. install topping slab over (e) concrete to accomodate new drain, waste, and vent (dpw) plumbing. add hvac register from (e) system to serve the new bath.Details
convert 92 sqft of (e) garage/den area on the 1st fl. to conditioned space for a new full bathroom and vestibule, with washer/dryer hookups. install topping slab over (e) concrete to accomodate new drain, waste, and vent (dpw) plumbing. add hvac register from (e) system to serve the new bath. | $30,000 |
| Jul 31, 2025 | In progress issued Aug 2025 | 219 Lake Merced Hill St North St | partial bathroom remodeling. replace shower pan, wet walls, shower head, and valve.Details
partial bathroom remodeling. replace shower pan, wet walls, shower head, and valve. | $10,000 |
| Jul 11, 2025 | Completed final sign-off Dec 2025 | 1260 Mason St | unit b 2nd floor: bathroom remodel. no structual changes like for like 33 sq ft shower.Details
unit b 2nd floor: bathroom remodel. no structual changes like for like 33 sq ft shower. | $15,000 |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 23 Scott Al | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $20,000 |
| Jan 16, 2025 | Completed final sign-off Apr 2025 | 1255 California St | unit 603: remodel guest bathroom like for like. replace all plumbing fixtures, shower, 2 outlets & 2 new r.l.Details
unit 603: remodel guest bathroom like for like. replace all plumbing fixtures, shower, 2 outlets & 2 new r.l. | $26,000 |
| Jan 3, 2025 | Completed final sign-off Mar 2025 | 3789 Fillmore St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). alteration of service equipment. | $25,000 |
| Nov 21, 2024 | Completed final sign-off Nov 2025 | 174 Arbor St | adding a 3rd bedroom and roof deck at the back patio. remodel 1/f and adding a 2nd bathroom.Details
adding a 3rd bedroom and roof deck at the back patio. remodel 1/f and adding a 2nd bathroom. | $98,392 |
| Nov 19, 2024 | Completed final sign-off Mar 2025 | 332 Castro St | kitchen & bath remodel in unit 332a like for like. no change in layout or walls. also doing a like for like window replacement. (3 total)Details
kitchen & bath remodel in unit 332a like for like. no change in layout or walls. also doing a like for like window replacement. (3 total) | $61,250 |
| Jun 18, 2024 | Completed final sign-off Jul 2024 | 1 Daniel Burnham Ct | bathroom remodel, like for like, no change in walls or layout.Details
bathroom remodel, like for like, no change in walls or layout. | $20,000 |
| Jan 30, 2024 | Completed final sign-off May 2024 | 1255 California St | unit 603-to comply w/ complaint# 202314738; full bath remodel code violation fix putting shower back in place and moving washer dryer backDetails
unit 603-to comply w/ complaint# 202314738; full bath remodel code violation fix putting shower back in place and moving washer dryer back | $25,000 |
| Dec 22, 2023 | Completed final sign-off Mar 2024 | 1465 Pacific Av | bathroom remodel and new laundry per planDetails
bathroom remodel and new laundry per plan | $45,000 |
| Oct 31, 2023 | Completed final sign-off Dec 2023 | 525 Wildwood Wy | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $25,840 |
| Sep 5, 2023 | Expired or cancelled cancelled Apr 2024 | 82 Landers St | kitchen and bath remodel. like for like. no structural , no layout changes.Details
kitchen and bath remodel. like for like. no structural , no layout changes. | $78,500 |
| Jun 22, 2023 | Expired or cancelled expired Aug 2026 | 22 Hillway Av | new construction of master bathroom and guest bathroom remodelDetails
new construction of master bathroom and guest bathroom remodel | $53,500 |
| Jun 7, 2023 | Expired or cancelled withdrawn Aug 2024 | 82 Landers St | replacing (e) deck. new construction bathroom. bathroom remodel. add new sliding door.Details
replacing (e) deck. new construction bathroom. bathroom remodel. add new sliding door. | $75,000 |
| Jun 7, 2023 | Completed final sign-off Sep 2023 | 1255 California St | 2 bathroom remodels: demo (e) tile and plumbing fixtures, reusing tub, replace each shower valvue in each shower, replace shower head and trims in each shower, repalce drain cover in walk-in shower, waterproof shower walls in both showers, and retile both showersDetails
2 bathroom remodels: demo (e) tile and plumbing fixtures, reusing tub, replace each shower valvue in each shower, replace shower head and trims in each shower, repalce drain cover in walk-in shower, waterproof shower walls in both showers, and retile both showers | $20,000 |
| May 8, 2023 | Completed final sign-off Nov 2023 | 344 Liberty St | kitchen remodel, 2 bathroom remodels, changing 1/2 bath into full bath. adding new construction windows (unit 344)Details
kitchen remodel, 2 bathroom remodels, changing 1/2 bath into full bath. adding new construction windows (unit 344) | $70,000 |
| Nov 4, 2022 | Completed final sign-off Sep 2023 | 56 Moss St | complete bathroom remodel, converting tub to walk-in shower, and adding a new soaking tub. adding a new skylight.Details
complete bathroom remodel, converting tub to walk-in shower, and adding a new soaking tub. adding a new skylight. | $25,000 |
| Oct 18, 2022 | Completed final sign-off Jun 2023 | 1220 Silver Av | 2nd fl: new construction bathroom. existing bathroom remodeling with change of tub to shower relocation. kitchen remodeling with relocation of sink, like for like replacement. remove one (e) skylight, and replace one (e) skylight.Details
2nd fl: new construction bathroom. existing bathroom remodeling with change of tub to shower relocation. kitchen remodeling with relocation of sink, like for like replacement. remove one (e) skylight, and replace one (e) skylight. | $15,000 |
| Oct 12, 2022 | Completed final sign-off Jan 2023 | 1914 45th Av | bathroom remodeling like for like. replace all plumbing fixtures, shower, toilet, sink, update e/m/p up to code. 2 gfci, 2 recessed lights.Details
bathroom remodeling like for like. replace all plumbing fixtures, shower, toilet, sink, update e/m/p up to code. 2 gfci, 2 recessed lights. | $25,000 |
| Sep 22, 2022 | Completed final sign-off Jun 2023 | 1220 Silver Av | 2 bath remodel like for like, replace plumbing fixtures, update e/m/p to code. new flooring. kitchen remodel, like for like. replace plumbing fixtures, appliancesDetails
2 bath remodel like for like, replace plumbing fixtures, update e/m/p to code. new flooring. kitchen remodel, like for like. replace plumbing fixtures, appliances | $23,000 |
| Aug 17, 2022 | Completed final sign-off Sep 2022 | 1783 San Jose Av | (1) bathroom remodeling - like for like.Details
(1) bathroom remodeling - like for like. | $35,000 |
| May 23, 2022 | Completed final sign-off Oct 2022 | 2600 18th St | 2 bathroom remodeling like for like and kitchen like for like replace gas stove to electric, bathroom all plumbing fixtures to be replace tub to wall in shower tub to free standing update e/n/p up to codeDetails
2 bathroom remodeling like for like and kitchen like for like replace gas stove to electric, bathroom all plumbing fixtures to be replace tub to wall in shower tub to free standing update e/n/p up to code | $30,000 |
| May 19, 2022 | Completed final sign-off Sep 2023 | 760 Duboce Av | relocate kitchen. adding new construction half bath. adding new laundry room. increased closet space and relocate plumbing.Details
relocate kitchen. adding new construction half bath. adding new laundry room. increased closet space and relocate plumbing. | $40,000 |
| May 18, 2022 | Completed final sign-off Sep 2022 | 1262 48th Av | 2 bathroom remodel. 1 guest bathroom like to like. 1 master bathroom convert tub to walk in shower. shower head flow rate <1.8 gpmDetails
2 bathroom remodel. 1 guest bathroom like to like. 1 master bathroom convert tub to walk in shower. shower head flow rate <1.8 gpm | $60,000 |
| May 18, 2022 | Expired or cancelled cancelled Jul 2022 | 2225 23rd St | unit# 315. 1 bathroom remodel. convert tub to walk in shower.Details
unit# 315. 1 bathroom remodel. convert tub to walk in shower. | $15,000 |
| Apr 21, 2022 | Completed final sign-off Dec 2023 | 66 Clifford Tr | 2 and half bathrooms remodeling in kind.Details
2 and half bathrooms remodeling in kind. | $30,000 |
| Feb 2, 2022 | Never finaled issued Apr 2022, no final | 985 Clayton St | bathroom remodel.Details
bathroom remodel. | $27,000 |
| Jan 26, 2022 | Expired or cancelled cancelled Jan 2026 | 2724 Santiago St | master bath remodel with changes to the layout. create hallway between e bedroomsDetails
master bath remodel with changes to the layout. create hallway between e bedrooms | $37,000 |
| Jan 11, 2022 | Completed final sign-off Aug 2022 | 2655 16th Av | bathroom remodel like for like, installing new toilet, vanity, tub plumbing fixtures, light fixtures, bathroom fan, new wall tiles and floor tilesDetails
bathroom remodel like for like, installing new toilet, vanity, tub plumbing fixtures, light fixtures, bathroom fan, new wall tiles and floor tiles | $32,400 |
| Jan 5, 2022 | Completed final sign-off Mar 2022 | 2724 Santiago St | one bathroom remodel like for like (tub). non structural.Details
one bathroom remodel like for like (tub). non structural. | $25,700 |
| Oct 7, 2021 | Completed final sign-off Nov 2022 | 2079 44th Av | remodeling 1 kitchen, 2 bathrooms, interior remodel to convert (e) garage to 371sf habitable space 1 bedroom, remove load bearign walls,r elocate washer/dryer to 1/f per plans, upgrade electrical and 200a, new rear deck with stairs.Details
remodeling 1 kitchen, 2 bathrooms, interior remodel to convert (e) garage to 371sf habitable space 1 bedroom, remove load bearign walls,r elocate washer/dryer to 1/f per plans, upgrade electrical and 200a, new rear deck with stairs. | $50,000 |
| Jul 28, 2021 | Completed final sign-off Mar 2023 | 47 Winfield St | rev to pa202103096123: changes to master bath: shower/vanity instead of tub/shower & vanity, 1/f: change layout of closets, framing in the kitchen per plans.Details
rev to pa202103096123: changes to master bath: shower/vanity instead of tub/shower & vanity, 1/f: change layout of closets, framing in the kitchen per plans. | |
| Jul 26, 2021 | Never finaled issued Jul 2021, no final | 1421 Masonic Av | apt 51: remodel bathroom - like for like. (e) tub. new plumbing fixtures: shower head, valve, tub faucet. new tile onthe walls and floors, new vanity.Details
apt 51: remodel bathroom - like for like. (e) tub. new plumbing fixtures: shower head, valve, tub faucet. new tile onthe walls and floors, new vanity. | $15,000 |
| Jun 15, 2021 | Completed final sign-off Aug 2021 | 693 44th Av | one bathroom remodel, convert tub to shower. shower to washer & dryer area intall 2 recessed lights replace plumbing fixtures, update e/m/p up to code.Details
one bathroom remodel, convert tub to shower. shower to washer & dryer area intall 2 recessed lights replace plumbing fixtures, update e/m/p up to code. | $32,000 |
| Apr 15, 2021 | Never finaled issued Apr 2021, no final | 590 06th St | unit # 206: bathroom remodel in-kind. (1 of 3 bathrooms)Details
unit # 206: bathroom remodel in-kind. (1 of 3 bathrooms) | $18,000 |
| Feb 23, 2021 | Completed final sign-off Sep 2021 | 1998 Pacific Av | kitchen remodel like for like add island upgrade, elec/mech/plumbing up to code. 2 bathroom remodeling like for like replace plumbing fixtures (6) upgrade elec/mech/plum up to code add 18 totalDetails
kitchen remodel like for like add island upgrade, elec/mech/plumbing up to code. 2 bathroom remodeling like for like replace plumbing fixtures (6) upgrade elec/mech/plum up to code add 18 total | $33,000 |
| Jan 14, 2021 | Completed final sign-off Apr 2021 | 207 Caselli Av | bathroom remodeling ilke for like replace plumbing,fixtures replace tub, upgrade plumbing up to codeDetails
bathroom remodeling ilke for like replace plumbing,fixtures replace tub, upgrade plumbing up to code | $18,000 |
| Nov 30, 2020 | Expired or cancelled expired Sep 2026 | 367 Fair Oaks St | bathroom remodel. powder room remodel and remove wall.Details
bathroom remodel. powder room remodel and remove wall. | $30,000 |
| Nov 17, 2020 | Never finaled issued Jan 2021, no final | 590 06th St | revision to pa #202009295375 - add an utility sink on the first floor. remove non-load bearing wall and replace all fixtures in existing bathroom on third floorDetails
revision to pa #202009295375 - add an utility sink on the first floor. remove non-load bearing wall and replace all fixtures in existing bathroom on third floor | $20,000 |
| Nov 4, 2020 | Never finaled issued Jan 2021, no final | 2718 Bryant St | convert (e) office to full bathroom incl shower. no structural work.Details
convert (e) office to full bathroom incl shower. no structural work. | $18,000 |
| Oct 22, 2020 | Never finaled filed Oct 2020, never issued | 51 Kissling St | convert the basement & part of the garage into new 1st floor. new bathroom, bedroom, laundry room, dig down & redo the foundations & the slab and remove deck. ** maher: n/a **Details
convert the basement & part of the garage into new 1st floor. new bathroom, bedroom, laundry room, dig down & redo the foundations & the slab and remove deck. ** maher: n/a ** | $400,000 |
| Oct 16, 2020 | Completed final sign-off Apr 2024 | 1606 La Playa | remodel of one upstairs bathroom to convert to two en-suite bathrooms, creation of one bathroom downstairs in the garage workout area adjacent to the laundryDetails
remodel of one upstairs bathroom to convert to two en-suite bathrooms, creation of one bathroom downstairs in the garage workout area adjacent to the laundry | $20,000 |
| Sep 29, 2020 | Never finaled issued Sep 2020, no final | 590 06th St | 1 complete bathroom remodel like to like. no layout change. 1 complete bathroom remodel tub to walk-in shower (shower pan).Details
1 complete bathroom remodel like to like. no layout change. 1 complete bathroom remodel tub to walk-in shower (shower pan). | $12,000 |
| Aug 20, 2020 | Completed final sign-off May 2021 | 722 Joost Av | complete bathroom remodel like for like(60 sq feet), replacing from shower to shower, no wall relocation. all new fixtures.Details
complete bathroom remodel like for like(60 sq feet), replacing from shower to shower, no wall relocation. all new fixtures. | $5,000 |
| May 29, 2020 | Never finaled issued Jul 2020, no final | 1480 12th Av | retrofit 8 windows replacement at side of house of which 4 are visible from the street. shower conversion from tub to shower due to leak at plumbing. bathroom is 5 x 12.Details
retrofit 8 windows replacement at side of house of which 4 are visible from the street. shower conversion from tub to shower due to leak at plumbing. bathroom is 5 x 12. | $8,000 |