Related California Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2016 to Aug 2026
- Last 24 months
- 14 permits filed
29 permits since 2000: 13 completed, 12 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 2 completed, 2 in progress, 1 never finaled. Typically 184 days from filing to permit and 330 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 26, 2025 | In progress issued May 2026 | 150 Oak St | phase 2: new ext canopies,partial roof/skylights & column removal on 6/f,resurface payyard,new entry gates,ext stairs & ter serving new sep entry & reno of (e) main entry w/ new canopy.nonstruct-ti's basement kitchen.Details
phase 2: new ext canopies,partial roof/skylights & column removal on 6/f,resurface payyard,new entry gates,ext stairs & ter serving new sep entry & reno of (e) main entry w/ new canopy.nonstruct-ti's basement kitchen. | $15,000,000 |
| Mar 17, 2025 | In progress issued Jun 2025 | 150 Oak St | ab-004 priority:phase 1b: renovate restrooms on floors 1-5.replace (e) toilet partitions w/ proviacy partitions where allwed by (e) fixture layouts.additoinal gender neutral restroom added to basement & 6/f.expand (e) egress stairs #05 from 1-2/f to service basements thru 3/f.add stairs #8 fr 3-6/f.Details
ab-004 priority:phase 1b: renovate restrooms on floors 1-5.replace (e) toilet partitions w/ proviacy partitions where allwed by (e) fixture layouts.additoinal gender neutral restroom added to basement & 6/f.expand (e) egress stairs #05 from 1-2/f to service basements thru 3/f.add stairs #8 fr 3-6/f. | $1,200,000 |
| Aug 24, 2021 | Completed final sign-off Aug 2022 | 1500 Mission St | revision to pa#202009114000: change type iib to va; int work: bsmt thru 2/f, minor int demo, fl openings at stair & duct shafts, n partitions, stair, ceiling, casewk, finishes & restrms within e shell. mep on sep permit. ext work: n occupied roof deck & landscaping added to e east roof deck,etcDetails
revision to pa#202009114000: change type iib to va; int work: bsmt thru 2/f, minor int demo, fl openings at stair & duct shafts, n partitions, stair, ceiling, casewk, finishes & restrms within e shell. mep on sep permit. ext work: n occupied roof deck & landscaping added to e east roof deck,etc | |
| Jan 29, 2021 | Never finaled issued Sep 2021, no final | 1500 Mission St | security improvements to the stairs at level -1 and level - 2 to prevent unauthorized individuals from gaining access to the building via the garage; added card readers at two doors to control access to the building. ** maher: n/a **Details
security improvements to the stairs at level -1 and level - 2 to prevent unauthorized individuals from gaining access to the building via the garage; added card readers at two doors to control access to the building. ** maher: n/a ** | $2,000 |
| Sep 11, 2020 | Completed final sign-off Aug 2022 | 1500 Mission St | change of use from office to health services on basement and first(ground) flr. basement-2/f-minor interior demo, floor openings @ stair & duct shaft, new partitions, stair ceilings, casework, finishes, restrooms within (e) shell. ref bpa#201805169291. mep/sprinklers/alarm under separate permit.Details
change of use from office to health services on basement and first(ground) flr. basement-2/f-minor interior demo, floor openings @ stair & duct shaft, new partitions, stair ceilings, casework, finishes, restrooms within (e) shell. ref bpa#201805169291. mep/sprinklers/alarm under separate permit. | $1,396,000 |