Back to kitchen remodel contractors
Reinhardt Construction Solutions Llc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Aug 2025
- Last 24 months
- 9 permits filed
25 permits since 2000: 17 completed, 2 in progress, 6 never finaled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 80 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2023 | Completed final sign-off May 2023 | 320 Hermann St | repairs items on viol#201047379,paint blding to correct peeling paint , repair siding & trims , abate lead paint (front facing)replace sheetrock in kitchen after roof repair to remove mold in damage areas , paint to match,install bathroom vent, rpr molded sheetrock roof rpr bathroomDetails
repairs items on viol#201047379,paint blding to correct peeling paint , repair siding & trims , abate lead paint (front facing)replace sheetrock in kitchen after roof repair to remove mold in damage areas , paint to match,install bathroom vent, rpr molded sheetrock roof rpr bathroom | $3,500 |
| Dec 1, 2021 | Completed final sign-off Jan 2022 | 1700 Broadway | apt# 202: apartment remodel: new kitchen, paint, refinish of floors, new subpanel, new sink, and faucet. new gas valve for stove. comply to nov # 202179951Details
apt# 202: apartment remodel: new kitchen, paint, refinish of floors, new subpanel, new sink, and faucet. new gas valve for stove. comply to nov # 202179951 | $75,000 |
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 291 Geary St | soft demolition of 7th flr office space, small kitchenette, class conference room, interior walls, drop ceilings flooring and doors and trim(open space for designers). n/a for maher. remain vacancy under ab-017.Details
soft demolition of 7th flr office space, small kitchenette, class conference room, interior walls, drop ceilings flooring and doors and trim(open space for designers). n/a for maher. remain vacancy under ab-017. | $15,000 |