Back to bathroom remodel contractors
Reinhardt Construction Solutions Llc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Aug 2025
- Last 24 months
- 9 permits filed
25 permits since 2000: 17 completed, 2 in progress, 6 never finaled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2023 | Completed final sign-off Apr 2024 | 352 17th Av | installation of 2-new bathroom @ 2nd flr master bedroom, 2-new bathroom @ 3rd flr for a total of 4 bathrooms. replace front window to be egress compliant w/ casement sdl.Details
installation of 2-new bathroom @ 2nd flr master bedroom, 2-new bathroom @ 3rd flr for a total of 4 bathrooms. replace front window to be egress compliant w/ casement sdl. | $18,000 |
| Jul 27, 2023 | Never finaled issued Jul 2023, no final | 352 17th Av | exploratory demo to determine possible paths for (2) bathrooms. open up floors, ceilings, plumbing, electrical, mechanical, paths for future installation. allow 100 sq ft per floor. must be returned to original state if no follow up permits issued.Details
exploratory demo to determine possible paths for (2) bathrooms. open up floors, ceilings, plumbing, electrical, mechanical, paths for future installation. allow 100 sq ft per floor. must be returned to original state if no follow up permits issued. | $5,000 |
| Feb 3, 2023 | Completed final sign-off May 2023 | 320 Hermann St | repairs items on viol#201047379,paint blding to correct peeling paint , repair siding & trims , abate lead paint (front facing)replace sheetrock in kitchen after roof repair to remove mold in damage areas , paint to match,install bathroom vent, rpr molded sheetrock roof rpr bathroomDetails
repairs items on viol#201047379,paint blding to correct peeling paint , repair siding & trims , abate lead paint (front facing)replace sheetrock in kitchen after roof repair to remove mold in damage areas , paint to match,install bathroom vent, rpr molded sheetrock roof rpr bathroom | $3,500 |
| Jul 16, 2019 | Completed final sign-off Feb 2020 | 1776 Sacramento St | master bathroom tile replacement, remove floor tile and shower tile and pan. replace with new no altering of walls or plumbing except new shower drain. paint bathroom, new glass shower door. no work in common areas no fa/ls work requiredDetails
master bathroom tile replacement, remove floor tile and shower tile and pan. replace with new no altering of walls or plumbing except new shower drain. paint bathroom, new glass shower door. no work in common areas no fa/ls work required | $11,500 |