Back to kitchen remodel contractors
Regan Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2022 to Sep 2026
- Last 24 months
- 9 permits filed
10 permits since 2000: 6 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 43 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jun 2026 | 1490 Francisco St | unit 2-kitchen and bathroom remodel in kind. no wall removal or layout change. to include replace toilet, faucet and tub in kind.Details
unit 2-kitchen and bathroom remodel in kind. no wall removal or layout change. to include replace toilet, faucet and tub in kind. | $25,000 |
| Mar 3, 2026 | Completed final sign-off Apr 2026 | 1572 Green St | remodel 2 bathrooms, new toilet, vanity, shower valves, tiles. replace nob and tubes, new kitchen countertops, sink and faucet.Details
remodel 2 bathrooms, new toilet, vanity, shower valves, tiles. replace nob and tubes, new kitchen countertops, sink and faucet. | $30,000 |
| Sep 2, 2025 | Completed final sign-off Oct 2025 | 4076 24th St | rear stair repair, less than 50%, ceiling repair at 4078 24th st, less than 40 sq ft. replace 1 kitchen cabinet, sink and faucet at 4076 24th street. to comply with nov #202536671 item #2,#3, & #5Details
rear stair repair, less than 50%, ceiling repair at 4078 24th st, less than 40 sq ft. replace 1 kitchen cabinet, sink and faucet at 4076 24th street. to comply with nov #202536671 item #2,#3, & #5 | $15,000 |
| Dec 5, 2022 | Never finaled issued Dec 2022, no final | 2649 Mission St | 2/flr apt# 1: interior remodel- 1080sqft that will include kitchen & bathroom remodel, new mini split, new tankless water heater. no exterior work.Details
2/flr apt# 1: interior remodel- 1080sqft that will include kitchen & bathroom remodel, new mini split, new tankless water heater. no exterior work. | $50,000 |