Back to bathroom remodel contractors
Regan Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2022 to Sep 2026
- Last 24 months
- 9 permits filed
10 permits since 2000: 6 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 1490 Francisco St | unit #5-partial bathroom remodel, new shower surround tile, new vanity, floor tile and toilet remain unchanged.Details
unit #5-partial bathroom remodel, new shower surround tile, new vanity, floor tile and toilet remain unchanged. | $5,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 1490 Francisco St | unit 2-kitchen and bathroom remodel in kind. no wall removal or layout change. to include replace toilet, faucet and tub in kind.Details
unit 2-kitchen and bathroom remodel in kind. no wall removal or layout change. to include replace toilet, faucet and tub in kind. | $25,000 |
| Mar 23, 2026 | Completed final sign-off Aug 2026 | 1570 Green St | partial remodel of (1) bathroom: new bathroom sink, toilet, and laundry.Details
partial remodel of (1) bathroom: new bathroom sink, toilet, and laundry. | $10,000 |
| Mar 3, 2026 | Completed final sign-off Apr 2026 | 1572 Green St | remodel 2 bathrooms, new toilet, vanity, shower valves, tiles. replace nob and tubes, new kitchen countertops, sink and faucet.Details
remodel 2 bathrooms, new toilet, vanity, shower valves, tiles. replace nob and tubes, new kitchen countertops, sink and faucet. | $30,000 |
| Jan 20, 2026 | Completed final sign-off Jul 2026 | 34 Bennington St | fl1: partial bathroom remodel (toilet, vanity/faucet, shower valve). throughout house: upgrade elec. and replace sheet rock(5/8x) in kind @ select demo (for electrical): 1st fl: office, 2nd fl: living and dining room. 3rd fl: bedroom. approx 300 sq ft for all sheet rock replacement.new sub-panel fl1Details
fl1: partial bathroom remodel (toilet, vanity/faucet, shower valve). throughout house: upgrade elec. and replace sheet rock(5/8x) in kind @ select demo (for electrical): 1st fl: office, 2nd fl: living and dining room. 3rd fl: bedroom. approx 300 sq ft for all sheet rock replacement.new sub-panel fl1 | $18,000 |
| Dec 5, 2022 | Never finaled issued Dec 2022, no final | 2649 Mission St | 2/flr apt# 1: interior remodel- 1080sqft that will include kitchen & bathroom remodel, new mini split, new tankless water heater. no exterior work.Details
2/flr apt# 1: interior remodel- 1080sqft that will include kitchen & bathroom remodel, new mini split, new tankless water heater. no exterior work. | $50,000 |