Back to kitchen remodel contractors
Reed Design Dba Design Solutions
- Based in
- San Francisco
- On San Francisco permits
- May 2012 to Dec 2024
- Last 24 months
- 1 permit filed
38 permits since 2000: 36 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 16 completed. Typically 0 days from filing to permit and 267 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2023 | Completed final sign-off Jul 2024 | 283 Jersey St | remodel existing kitchen and master bathroom in kind. replace cabinets, countertops, lighting and plumbing fixtures. no change to floor layout. no change to wall layout. no structural work.Details
remodel existing kitchen and master bathroom in kind. replace cabinets, countertops, lighting and plumbing fixtures. no change to floor layout. no change to wall layout. no structural work. | $45,000 |
| Jan 5, 2023 | Completed final sign-off Jan 2023 | 1575 27th Av | revision to pa# 202112134272, eliminate 1 story rear deck and spiral stairs, no kitchen remodelDetails
revision to pa# 202112134272, eliminate 1 story rear deck and spiral stairs, no kitchen remodel | |
| Jul 11, 2022 | Completed final sign-off Mar 2023 | 204 Fair Oaks St | replace kitchen cabinets, countertops, recessed lighting, and finish plumbing fixtures. existing appliances and flooring to remain. cabinet to remain in kind.Details
replace kitchen cabinets, countertops, recessed lighting, and finish plumbing fixtures. existing appliances and flooring to remain. cabinet to remain in kind. | $25,000 |
| Jan 20, 2022 | Completed final sign-off Aug 2022 | 80 Rosewood Dr | remodel existing kitchen with new cabinets, recessed lights, countertops, and backsplash tile. no structural work - no wall/framing modifications.Details
remodel existing kitchen with new cabinets, recessed lights, countertops, and backsplash tile. no structural work - no wall/framing modifications. | $25,000 |
| Dec 13, 2021 | Completed final sign-off Jan 2023 | 1575 27th Av | rear yard deck & spiral stairs.remodel bath & kitchen, provide workshop & vanity @ 1st floor. fill in lightwell at north elevation,2nd floor.Details
rear yard deck & spiral stairs.remodel bath & kitchen, provide workshop & vanity @ 1st floor. fill in lightwell at north elevation,2nd floor. | $50,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2020 | 4175 Cesar Chavez St | remodel e kitchen and 1st fl bath. replace e kitchen cabinets, countertops, lighting, plumbing fixtures, backsplash tile. install new plumbing fixtures and tile for 1st fl bath.Details
remodel e kitchen and 1st fl bath. replace e kitchen cabinets, countertops, lighting, plumbing fixtures, backsplash tile. install new plumbing fixtures and tile for 1st fl bath. | $35,000 |
| Dec 30, 2019 | Completed final sign-off Dec 2020 | 109 Scott St | -++. replace e kitchen cabinets, countertops, ruse e led lighting and plumbing fixturesDetails
-++. replace e kitchen cabinets, countertops, ruse e led lighting and plumbing fixtures | $15,000 |
| May 22, 2018 | Completed final sign-off Nov 2018 | 831 Scott St | remodel existing kitchen. update cabinetss, lighting, plumbing fixtures appliances 10 x 15. lighting per cec 150 .k all appliances and cabinetry to stay in same locationDetails
remodel existing kitchen. update cabinetss, lighting, plumbing fixtures appliances 10 x 15. lighting per cec 150 .k all appliances and cabinetry to stay in same location | $30,000 |
| Nov 20, 2017 | Completed final sign-off Aug 2018 | 4179 17th St | remodel existing kitchen. replace cabinets, countertops, lighting and appliances. all (e) fixtures to remain in the same place as they currently are. in kind remodel - kitchenDetails
remodel existing kitchen. replace cabinets, countertops, lighting and appliances. all (e) fixtures to remain in the same place as they currently are. in kind remodel - kitchen | $35,000 |
| Sep 2, 2016 | Completed final sign-off Nov 2017 | 163 Laidley St | roof deck at 3rd fl over kitchen, kitchen remodelDetails
roof deck at 3rd fl over kitchen, kitchen remodel | $45,000 |
| Jul 19, 2016 | Completed final sign-off Dec 2016 | 117 Chaves Av | remodel existing kitchen. replace cabinets, counter tops, appliances & lighting. no structural, same configuration.Details
remodel existing kitchen. replace cabinets, counter tops, appliances & lighting. no structural, same configuration. | $20,000 |
| Jun 27, 2016 | Completed final sign-off Aug 2018 | 2349 North Point St | (unit legalization ordinance 43-14) legalize undocumented unit at 1st floor legalize 1 bedroom, 1 bathroom, 1 kitchen and 1 living roomDetails
(unit legalization ordinance 43-14) legalize undocumented unit at 1st floor legalize 1 bedroom, 1 bathroom, 1 kitchen and 1 living room | $95,000 |
| Jun 15, 2015 | Completed final sign-off May 2016 | 51 Jersey St | remodel (e) kitchen. all appliances, plumbing factor & cabinets to remain in current location. install new lighting, counter tops & flooring. all work at middle floor. maintain ceiling rating at recessed ceiling lights.Details
remodel (e) kitchen. all appliances, plumbing factor & cabinets to remain in current location. install new lighting, counter tops & flooring. all work at middle floor. maintain ceiling rating at recessed ceiling lights. | $18,000 |
| May 5, 2015 | Completed final sign-off Mar 2016 | 3841 23rd St | lighting ld & connct to (e) exhaust duct (range hood) remodel kitchen area. replace lighting, cabinets, countertops & plumbing fixtures. all fixtures same location. no moving of wallsDetails
lighting ld & connct to (e) exhaust duct (range hood) remodel kitchen area. replace lighting, cabinets, countertops & plumbing fixtures. all fixtures same location. no moving of walls | $15,000 |
| Oct 15, 2014 | Completed final sign-off May 2015 | 515 Diamond St | remodel kitchen and bathroom. replace lighting, cabinets, sink in kitchen area and replace floor tile and vanity in bathroom.Details
remodel kitchen and bathroom. replace lighting, cabinets, sink in kitchen area and replace floor tile and vanity in bathroom. | $19,000 |
| Dec 13, 2013 | Completed final sign-off Jun 2014 | 172 Alpine Tr | replace existing cabinets, countertops, flooring, lighting, and plumbing fixtures for the kitchen areaDetails
replace existing cabinets, countertops, flooring, lighting, and plumbing fixtures for the kitchen area | $35,000 |