Back to bathroom remodel contractors
Reed Design Dba Design Solutions
- Based in
- San Francisco
- On San Francisco permits
- May 2012 to Dec 2024
- Last 24 months
- 1 permit filed
38 permits since 2000: 36 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 340 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2024 | Completed final sign-off Sep 2025 | 375 30th St | remodel (e) master bath in kind keep all (e) fixtures in place for walk in shower and double sink vanity. replace shower fixtures, vanity sink facuets and tileDetails
remodel (e) master bath in kind keep all (e) fixtures in place for walk in shower and double sink vanity. replace shower fixtures, vanity sink facuets and tile | $10,000 |
| Dec 22, 2023 | Completed final sign-off Jul 2024 | 283 Jersey St | remodel existing kitchen and master bathroom in kind. replace cabinets, countertops, lighting and plumbing fixtures. no change to floor layout. no change to wall layout. no structural work.Details
remodel existing kitchen and master bathroom in kind. replace cabinets, countertops, lighting and plumbing fixtures. no change to floor layout. no change to wall layout. no structural work. | $45,000 |
| Dec 13, 2021 | Completed final sign-off Jan 2023 | 1575 27th Av | rear yard deck & spiral stairs.remodel bath & kitchen, provide workshop & vanity @ 1st floor. fill in lightwell at north elevation,2nd floor.Details
rear yard deck & spiral stairs.remodel bath & kitchen, provide workshop & vanity @ 1st floor. fill in lightwell at north elevation,2nd floor. | $50,000 |
| Mar 2, 2020 | Completed final sign-off Aug 2022 | 4179 17th St | bath remodel, replace toilet vanity, tile, lighting, shower enclosureDetails
bath remodel, replace toilet vanity, tile, lighting, shower enclosure | $15,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2020 | 4175 Cesar Chavez St | remodel e kitchen and 1st fl bath. replace e kitchen cabinets, countertops, lighting, plumbing fixtures, backsplash tile. install new plumbing fixtures and tile for 1st fl bath.Details
remodel e kitchen and 1st fl bath. replace e kitchen cabinets, countertops, lighting, plumbing fixtures, backsplash tile. install new plumbing fixtures and tile for 1st fl bath. | $35,000 |
| Sep 19, 2019 | Completed final sign-off Oct 2020 | 387 Eureka St | add 1st floor bathroom remodel in kind to permit 201801047843 s1. no alteration of wall, window and door.Details
add 1st floor bathroom remodel in kind to permit 201801047843 s1. no alteration of wall, window and door. | $15,000 |
| Mar 29, 2017 | Completed final sign-off Nov 2017 | 2943 Washington St | remodel 9e) master bathroom, convert (e) bath tub to a walk in shower, add new recessed lighting and finish plumbing fixtures, replace (e) single pane french doors with double pane glass.Details
remodel 9e) master bathroom, convert (e) bath tub to a walk in shower, add new recessed lighting and finish plumbing fixtures, replace (e) single pane french doors with double pane glass. | $25,000 |
| Jun 27, 2016 | Completed final sign-off Aug 2018 | 2349 North Point St | (unit legalization ordinance 43-14) legalize undocumented unit at 1st floor legalize 1 bedroom, 1 bathroom, 1 kitchen and 1 living roomDetails
(unit legalization ordinance 43-14) legalize undocumented unit at 1st floor legalize 1 bedroom, 1 bathroom, 1 kitchen and 1 living room | $95,000 |
| Mar 31, 2015 | Completed final sign-off Nov 2017 | 163 Laidley St | remodel third floor. 2 baths. add 1 roof dormer. extend 1 roof dormer.Details
remodel third floor. 2 baths. add 1 roof dormer. extend 1 roof dormer. | $110,000 |
| Mar 25, 2015 | Completed final sign-off Nov 2017 | 163 Laidley St | lower basement flr to make habitable clg. height. lower concrete slab at front entry. add bath & interior stair to 1 st flr. enlarge 2 windows at 3rd flrDetails
lower basement flr to make habitable clg. height. lower concrete slab at front entry. add bath & interior stair to 1 st flr. enlarge 2 windows at 3rd flr | $95,000 |
| Oct 15, 2014 | Completed final sign-off May 2015 | 515 Diamond St | remodel kitchen and bathroom. replace lighting, cabinets, sink in kitchen area and replace floor tile and vanity in bathroom.Details
remodel kitchen and bathroom. replace lighting, cabinets, sink in kitchen area and replace floor tile and vanity in bathroom. | $19,000 |
| Jul 12, 2013 | Completed final sign-off Oct 2013 | 2241 Sacramento St | replace tile, vanities, plumbing fixtures & electrical for existing bathrooms, bathrooms are approx. 5'x6'Details
replace tile, vanities, plumbing fixtures & electrical for existing bathrooms, bathrooms are approx. 5'x6' | $10,000 |