Redwood Electric Group Inc
- Based in
- Santa Clara
- On San Francisco permits
- Apr 2000 to Apr 2026
- Last 24 months
- 6 permits filed
144 permits since 2000: 111 completed, 7 in progress, 19 never finaled, 7 expired or cancelled.
Of the 19 never-finaled permits, 11 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 43 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2024 | In progress issued Jun 2024 | 560 Mission St | provision of additonal area smoke detector covage as required by the romoval of stairs between floor 11 and floor 12 located on the west side of passanger elevator lobby reprogramming of 11th fl. fire smoke dumper sequence of operation as required by removal of stairs between 11th & 12the fl.Details
provision of additonal area smoke detector covage as required by the romoval of stairs between floor 11 and floor 12 located on the west side of passanger elevator lobby reprogramming of 11th fl. fire smoke dumper sequence of operation as required by removal of stairs between 11th & 12the fl. | $10,000 |