Back to kitchen remodel contractors
Rebase Building
- Based in
- Daly City
- On San Francisco permits
- Apr 2022 to Jul 2026
- Last 24 months
- 8 permits filed
14 permits since 2000: 13 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2025 | Completed final sign-off Dec 2025 | 250 Maywood Dr | kitchenette remodel: update cabinets, replace outlets, replace sink, hood/microwave, induction 12" stove, small fridge, add led light under cabinetsDetails
kitchenette remodel: update cabinets, replace outlets, replace sink, hood/microwave, induction 12" stove, small fridge, add led light under cabinets | $5,000 |
| Jan 14, 2025 | Completed final sign-off Jun 2025 | 145 Broadmoor Dr | 1/fl:kitchen remodel and 2nd/fl: second floor bath remodelDetails
1/fl:kitchen remodel and 2nd/fl: second floor bath remodel | $98,000 |
| Jul 9, 2024 | Completed final sign-off Nov 2024 | 373 26th Av | unit 1-kitchen remodel to include (n) cabinets, flooring, fixtures and finsihes. remain dishwasher, range, fridge and replace range hood. no wall removal or layout changeDetails
unit 1-kitchen remodel to include (n) cabinets, flooring, fixtures and finsihes. remain dishwasher, range, fridge and replace range hood. no wall removal or layout change | $35,000 |
| Aug 29, 2023 | Completed final sign-off Aug 2025 | 1568 Noe St | kitchen remodel remove wall betw kitc & dining. remove chiminey. relocate water lines & gas lines. install new laundry faucet. rought in waste, vent and water supply for new island sink location. installation of a new sub-pannel, new fixtures. heater & furnanceDetails
kitchen remodel remove wall betw kitc & dining. remove chiminey. relocate water lines & gas lines. install new laundry faucet. rought in waste, vent and water supply for new island sink location. installation of a new sub-pannel, new fixtures. heater & furnance | $29,500 |