Back to bathroom remodel contractors
Rebase Building
- Based in
- Daly City
- On San Francisco permits
- Apr 2022 to Jul 2026
- Last 24 months
- 8 permits filed
14 permits since 2000: 13 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 in progress. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Jul 2026 | 1546 09th Av | bathroom remodel like for like, keeping radiant heating flooring tiles.Details
bathroom remodel like for like, keeping radiant heating flooring tiles. | $25,000 |
| Feb 2, 2026 | Completed final sign-off Jun 2026 | 145 Broadmoor Dr | 2nd fl: bathroom remodel (like for like)Details
2nd fl: bathroom remodel (like for like) | $25,000 |
| Mar 18, 2025 | Completed final sign-off May 2025 | 373 26th Av | unit 2: bathroom remodel like for like.Details
unit 2: bathroom remodel like for like. | $28,000 |
| Jan 15, 2025 | Completed final sign-off Apr 2025 | 373 26th Av | bathroom remodeling: all layout same, just replacing bath tub to shower area, replacement old to new items toilet, vanity, and fixture, fan replacement, receptaclesDetails
bathroom remodeling: all layout same, just replacing bath tub to shower area, replacement old to new items toilet, vanity, and fixture, fan replacement, receptacles | $30,000 |
| Jan 14, 2025 | Completed final sign-off Jun 2025 | 145 Broadmoor Dr | 1/fl:kitchen remodel and 2nd/fl: second floor bath remodelDetails
1/fl:kitchen remodel and 2nd/fl: second floor bath remodel | $98,000 |
| Feb 9, 2024 | Completed final sign-off May 2024 | 178 Ridgewood Av | unit c: remodel two bathrooms inkind. replace bath tub, floor,dry area walls and retile floor. bathtub replacement. fixture replacement. existing toilets to remain, new bath tubsDetails
unit c: remodel two bathrooms inkind. replace bath tub, floor,dry area walls and retile floor. bathtub replacement. fixture replacement. existing toilets to remain, new bath tubs | $25,000 |
| Apr 12, 2022 | Completed final sign-off Jul 2022 | 425 01st St | unit #902: living room add 2 more gfci outlets for planats pots on the wall, connect to (e) one, add one oulet behind tv connect to (e) one in bedroom, add one gfci outlet and connect to (e) one in bathroom, right side of the toliet area with open wall for wire and elec. box installDetails
unit #902: living room add 2 more gfci outlets for planats pots on the wall, connect to (e) one, add one oulet behind tv connect to (e) one in bedroom, add one gfci outlet and connect to (e) one in bathroom, right side of the toliet area with open wall for wire and elec. box install | $1,500 |