Back to kitchen remodel contractors
Rayco Development Solutions Inc
- Based in
- Castro Valley
- On San Francisco permits
- Jan 2012 to Jan 2017
- Last 24 months
- 0 permits filed
8 permits since 2000: 4 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 never finaled. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2013 | Completed final sign-off Jun 2013 | 55 Vandewater St | remove & replace hardwood floors, cabinets same style, 5 outlets in kitchen replace w/1 gfci outlet.Details
remove & replace hardwood floors, cabinets same style, 5 outlets in kitchen replace w/1 gfci outlet. | $5,000 |
| Apr 18, 2012 | Never finaled issued Apr 2012, no final | 2654 Gough St | bathroom/kitchen remodel - remove and repalce bathroom vanity, sink, shower, toilet, kitchen - remove and replace sink refrigerator, garbage disposal. electrical - replace receptalces, & switches in bathroom and ktichen. no lights. no structural work.Details
bathroom/kitchen remodel - remove and repalce bathroom vanity, sink, shower, toilet, kitchen - remove and replace sink refrigerator, garbage disposal. electrical - replace receptalces, & switches in bathroom and ktichen. no lights. no structural work. | $5,000 |
| Apr 11, 2012 | Never finaled issued Apr 2012, no final | 825 Post St | #301: installing toilet, vanity sink and faucet, kitchen sink and faucet, kitchen disposal, wall switchesDetails
#301: installing toilet, vanity sink and faucet, kitchen sink and faucet, kitchen disposal, wall switches | $5,000 |
| Jan 31, 2012 | Completed final sign-off Jun 2012 | 755 Green St | remodel kitchen and bath. new lights comply with cec 150k 8 and cec 150 10. unit 1 eDetails
remodel kitchen and bath. new lights comply with cec 150k 8 and cec 150 10. unit 1 e | $24,500 |