Back to kitchen remodel contractors
Rafael Miranda Dba R M Constr.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Sep 2023
- Last 24 months
- 0 permits filed
75 permits since 2000: 50 completed, 12 never finaled, 13 expired or cancelled.
Of the 12 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 11 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2023 | Never finaled issued Sep 2023, no final | 1520 Leavenworth St | kitchen remodeling, bathroom remodeling update electrical bath: 5x6x2 kitchen: 8x10x2 unit 1, 2, 3Details
kitchen remodeling, bathroom remodeling update electrical bath: 5x6x2 kitchen: 8x10x2 unit 1, 2, 3 | $80,000 |
| May 10, 2023 | Never finaled issued May 2023, no final | 1175 Pine St | remodeling unit# a, uni# 2, and unit# 3, relplace kitchen counter top cabinets, sink faucet, all plumbing, rewire electric, bathroom new flooring, new tiles, toilet, vanity, foucet, sink, shower, plumbing, new fl. laminated water proof for the 3 units paint entire unit, replace all elec receptacles,Details
remodeling unit# a, uni# 2, and unit# 3, relplace kitchen counter top cabinets, sink faucet, all plumbing, rewire electric, bathroom new flooring, new tiles, toilet, vanity, foucet, sink, shower, plumbing, new fl. laminated water proof for the 3 units paint entire unit, replace all elec receptacles, | $90,000 |
| Feb 14, 2022 | Completed final sign-off May 2023 | 19 Card Al | replace rotten wall studs & replace or repair floor ref #202111243146. kitchen area in 1st fl. framing members to be replaced in "like-kind" or better. contact district building inspector prior to start of work.Details
replace rotten wall studs & replace or repair floor ref #202111243146. kitchen area in 1st fl. framing members to be replaced in "like-kind" or better. contact district building inspector prior to start of work. | $2,800 |
| Nov 24, 2021 | Completed final sign-off May 2023 | 19 Card Al | 19 card & 19a -install insulation on exterior walls, new panel 125 and sub panel, remodel kitchen. remodel one bathroom, new flooring. no removal of walls.Details
19 card & 19a -install insulation on exterior walls, new panel 125 and sub panel, remodel kitchen. remodel one bathroom, new flooring. no removal of walls. | $78,000 |
| Jul 20, 2020 | Completed final sign-off Jul 2021 | 366 Lexington St | remove kitchen cabinets and tile. install new cabinets and granite. replace faucet. install a 200 amp panel. install 12 lights. repair kitchen walls. kitchen approx 10'x12'. all work in kind.Details
remove kitchen cabinets and tile. install new cabinets and granite. replace faucet. install a 200 amp panel. install 12 lights. repair kitchen walls. kitchen approx 10'x12'. all work in kind. | $31,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2019 | 3372 19th St | reinforce (e) flooring in bathroom, upgrade lighting and receptacles, replace 3 toilets , replace kitchen sink in-kind, replace 2 bathroom sinks. no change on walls. no sprinklers.Details
reinforce (e) flooring in bathroom, upgrade lighting and receptacles, replace 3 toilets , replace kitchen sink in-kind, replace 2 bathroom sinks. no change on walls. no sprinklers. | $3,800 |
| Mar 23, 2018 | Completed final sign-off May 2018 | 1201 Plymouth Av | to comply with nov 201851471 & 201851441, clean up kitchen equip reapirs and installation for health dept compliance, roof patching, new tile & painting maher naDetails
to comply with nov 201851471 & 201851441, clean up kitchen equip reapirs and installation for health dept compliance, roof patching, new tile & painting maher na | $4,080 |
| Jul 5, 2016 | Never finaled issued Jul 2016, no final | 366 Lexington St | new plumbing in bathroom and kitchen. new electrical in dining room, bathroom and kitchen. carpentryDetails
new plumbing in bathroom and kitchen. new electrical in dining room, bathroom and kitchen. carpentry | $12,000 |
| May 24, 2012 | Completed final sign-off Aug 2012 | 1200 Pine St | apt. #3: install new cabinets, sink, relocate stove, repair bathroom walls, repalce sink in bathroom & toilet, new shower valve. install new sub-panel and rewire kitchen. (verify in field - bathroom exhaust fan; lighting in bathroom & kitchen shall be light efficacy.Details
apt. #3: install new cabinets, sink, relocate stove, repair bathroom walls, repalce sink in bathroom & toilet, new shower valve. install new sub-panel and rewire kitchen. (verify in field - bathroom exhaust fan; lighting in bathroom & kitchen shall be light efficacy. | $8,200 |
| Mar 12, 2012 | Completed final sign-off Apr 2012 | 530 Grove St | work in unit #1: replace kitchen, new faucets and extra outlets.new floor tiles, refinish floor, paint unit at unit #1. no lighting change. to comply with complaint #2012019801.Details
work in unit #1: replace kitchen, new faucets and extra outlets.new floor tiles, refinish floor, paint unit at unit #1. no lighting change. to comply with complaint #2012019801. | $3,000 |
| Aug 3, 2011 | Completed final sign-off Apr 2012 | 919 Guerrero St | unit 919a: remodel bath, replace shower stall,wash basin, floor. remodel kitchen, new cabinets, sink, range and hood, new outlets. new lighting.Details
unit 919a: remodel bath, replace shower stall,wash basin, floor. remodel kitchen, new cabinets, sink, range and hood, new outlets. new lighting. | $14,000 |
| May 10, 2010 | Completed final sign-off Dec 2010 | 872 Kansas St | replace sheetrocks, new electrical and main panel, replace kitchen cabs, bathroom remodeling, repair back stairs less than 50%, replace kitchen sink. all work at main floor. replace all windows (total 11 windows). no relocation and no new wall.Details
replace sheetrocks, new electrical and main panel, replace kitchen cabs, bathroom remodeling, repair back stairs less than 50%, replace kitchen sink. all work at main floor. replace all windows (total 11 windows). no relocation and no new wall. | $35,700 |
| Mar 11, 2010 | Expired or cancelled cancelled Jan 2026 | 1877 Greenwich St | remodel batroom, kitchen. instulate wall, replace rotten 4x4, relocate door in non bearing wall. new elec painel, rewire unit. all work in front building, 1st floor, lower unit.Details
remodel batroom, kitchen. instulate wall, replace rotten 4x4, relocate door in non bearing wall. new elec painel, rewire unit. all work in front building, 1st floor, lower unit. | $17,500 |
| May 12, 2008 | Completed final sign-off Jul 2008 | 21 Robblee Av | comply w/ pid/eid correction notice dtd 4/23/08:remodel upstairs bathroom & kitchen, remove non-permitted bathroom & kitchen downstairs, cap utilities at source. upgrade electrical under separate permit.(n) kitchen lighting flourescent, (n) bath lighting flourescent or operated by occupant sensor.Details
comply w/ pid/eid correction notice dtd 4/23/08:remodel upstairs bathroom & kitchen, remove non-permitted bathroom & kitchen downstairs, cap utilities at source. upgrade electrical under separate permit.(n) kitchen lighting flourescent, (n) bath lighting flourescent or operated by occupant sensor. | $10,000 |
| Jun 14, 2005 | Completed final sign-off Oct 2005 | 3725 17th St | remodel kitchen, 2 baths, unit 3725 only,installatin of new subpanel electricDetails
remodel kitchen, 2 baths, unit 3725 only,installatin of new subpanel electric | $26,000 |