Back to bathroom remodel contractors
Rafael Miranda Dba R M Constr.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Sep 2023
- Last 24 months
- 0 permits filed
75 permits since 2000: 50 completed, 12 never finaled, 13 expired or cancelled.
Of the 12 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 14 completed, 5 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2023 | Never finaled issued Sep 2023, no final | 1520 Leavenworth St | kitchen remodeling, bathroom remodeling update electrical bath: 5x6x2 kitchen: 8x10x2 unit 1, 2, 3Details
kitchen remodeling, bathroom remodeling update electrical bath: 5x6x2 kitchen: 8x10x2 unit 1, 2, 3 | $80,000 |
| May 10, 2023 | Never finaled issued May 2023, no final | 1175 Pine St | remodeling unit# a, uni# 2, and unit# 3, relplace kitchen counter top cabinets, sink faucet, all plumbing, rewire electric, bathroom new flooring, new tiles, toilet, vanity, foucet, sink, shower, plumbing, new fl. laminated water proof for the 3 units paint entire unit, replace all elec receptacles,Details
remodeling unit# a, uni# 2, and unit# 3, relplace kitchen counter top cabinets, sink faucet, all plumbing, rewire electric, bathroom new flooring, new tiles, toilet, vanity, foucet, sink, shower, plumbing, new fl. laminated water proof for the 3 units paint entire unit, replace all elec receptacles, | $90,000 |
| Nov 24, 2021 | Completed final sign-off May 2023 | 19 Card Al | 19 card & 19a -install insulation on exterior walls, new panel 125 and sub panel, remodel kitchen. remodel one bathroom, new flooring. no removal of walls.Details
19 card & 19a -install insulation on exterior walls, new panel 125 and sub panel, remodel kitchen. remodel one bathroom, new flooring. no removal of walls. | $78,000 |
| Nov 20, 2019 | Completed final sign-off May 2020 | 73 Card Al | replace two upper story front windows w/all wood double-hung windows w/integrated ogees w/in (e) openings. transom to remain. replace 3 non-visible windows elsewhere. no other work. reframe windows. rewiring one bedroom. replace bathroom faucetDetails
replace two upper story front windows w/all wood double-hung windows w/integrated ogees w/in (e) openings. transom to remain. replace 3 non-visible windows elsewhere. no other work. reframe windows. rewiring one bedroom. replace bathroom faucet | $11,200 |
| Oct 25, 2019 | Completed final sign-off Nov 2019 | 3372 19th St | reinforce (e) flooring in bathroom, upgrade lighting and receptacles, replace 3 toilets , replace kitchen sink in-kind, replace 2 bathroom sinks. no change on walls. no sprinklers.Details
reinforce (e) flooring in bathroom, upgrade lighting and receptacles, replace 3 toilets , replace kitchen sink in-kind, replace 2 bathroom sinks. no change on walls. no sprinklers. | $3,800 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 140 Laguna St | bathroom remodeling - remove bathtub, wash basing, medi cabient, relocate switch, install new bathroom fan, new plumbing fixtures, new sheetrock walls, etcDetails
bathroom remodeling - remove bathtub, wash basing, medi cabient, relocate switch, install new bathroom fan, new plumbing fixtures, new sheetrock walls, etc | $9,000 |
| Jul 5, 2016 | Never finaled issued Jul 2016, no final | 366 Lexington St | new plumbing in bathroom and kitchen. new electrical in dining room, bathroom and kitchen. carpentryDetails
new plumbing in bathroom and kitchen. new electrical in dining room, bathroom and kitchen. carpentry | $12,000 |
| Dec 16, 2014 | Completed final sign-off Jul 2017 | 233 Corbett Av | reconfigure new interior stair between main(street)level & lower flr & to basement. remodel lower flr rumpus room,laundry,bedrm,&bath.capture (e)covered porch areas for habitable space.patio & window changes not visible from street.partial basement to have "lanai"indoor/outdoor non condition space.Details
reconfigure new interior stair between main(street)level & lower flr & to basement. remodel lower flr rumpus room,laundry,bedrm,&bath.capture (e)covered porch areas for habitable space.patio & window changes not visible from street.partial basement to have "lanai"indoor/outdoor non condition space. | $140,687 |
| Aug 23, 2013 | Completed final sign-off Sep 2015 | 2828 Polk St | remove (e) old bathroom, demo bedroom closet. build 2 new bathrooms, alteration of bedroom partition walls to add closet. upgrade electrical & plumbingDetails
remove (e) old bathroom, demo bedroom closet. build 2 new bathrooms, alteration of bedroom partition walls to add closet. upgrade electrical & plumbing | $10,000 |
| Aug 30, 2012 | Completed final sign-off Sep 2015 | 2826 Polk St | install new outlet & wall switches thruout aparment. remodel (2) bathrooms, replace (2) french doors & (1) window. all work replace in kind, same location. install light per cec 150(k)10, install window per cec 151-c.Details
install new outlet & wall switches thruout aparment. remodel (2) bathrooms, replace (2) french doors & (1) window. all work replace in kind, same location. install light per cec 150(k)10, install window per cec 151-c. | $25,000 |
| May 24, 2012 | Completed final sign-off Aug 2012 | 1200 Pine St | apt. #3: install new cabinets, sink, relocate stove, repair bathroom walls, repalce sink in bathroom & toilet, new shower valve. install new sub-panel and rewire kitchen. (verify in field - bathroom exhaust fan; lighting in bathroom & kitchen shall be light efficacy.Details
apt. #3: install new cabinets, sink, relocate stove, repair bathroom walls, repalce sink in bathroom & toilet, new shower valve. install new sub-panel and rewire kitchen. (verify in field - bathroom exhaust fan; lighting in bathroom & kitchen shall be light efficacy. | $8,200 |
| Aug 3, 2011 | Completed final sign-off Apr 2012 | 919 Guerrero St | unit 919a: remodel bath, replace shower stall,wash basin, floor. remodel kitchen, new cabinets, sink, range and hood, new outlets. new lighting.Details
unit 919a: remodel bath, replace shower stall,wash basin, floor. remodel kitchen, new cabinets, sink, range and hood, new outlets. new lighting. | $14,000 |
| Feb 7, 2011 | Never finaled issued Feb 2011, no final | 1177 De Haro St | new full bathroom and new office at existing storage space on garage levelDetails
new full bathroom and new office at existing storage space on garage level | $14,000 |
| Oct 13, 2010 | Expired or cancelled expired Nov 2011 | 1880 Jackson St | remodel existing bathroom & install new exhaust fan. no wall relocation. provide h.e. light or "manuel on" o.s.Details
remodel existing bathroom & install new exhaust fan. no wall relocation. provide h.e. light or "manuel on" o.s. | $800 |
| May 10, 2010 | Completed final sign-off Dec 2010 | 872 Kansas St | replace sheetrocks, new electrical and main panel, replace kitchen cabs, bathroom remodeling, repair back stairs less than 50%, replace kitchen sink. all work at main floor. replace all windows (total 11 windows). no relocation and no new wall.Details
replace sheetrocks, new electrical and main panel, replace kitchen cabs, bathroom remodeling, repair back stairs less than 50%, replace kitchen sink. all work at main floor. replace all windows (total 11 windows). no relocation and no new wall. | $35,700 |
| May 12, 2008 | Completed final sign-off Jul 2008 | 21 Robblee Av | comply w/ pid/eid correction notice dtd 4/23/08:remodel upstairs bathroom & kitchen, remove non-permitted bathroom & kitchen downstairs, cap utilities at source. upgrade electrical under separate permit.(n) kitchen lighting flourescent, (n) bath lighting flourescent or operated by occupant sensor.Details
comply w/ pid/eid correction notice dtd 4/23/08:remodel upstairs bathroom & kitchen, remove non-permitted bathroom & kitchen downstairs, cap utilities at source. upgrade electrical under separate permit.(n) kitchen lighting flourescent, (n) bath lighting flourescent or operated by occupant sensor. | $10,000 |
| Nov 7, 2007 | Completed final sign-off Feb 2008 | 312 Anza St | revision to application # 200710236202. relocation of sink and wall in (n) bathroom on 1st floor.Details
revision to application # 200710236202. relocation of sink and wall in (n) bathroom on 1st floor. | $250 |
| Oct 23, 2007 | Completed final sign-off Feb 2008 | 312 Anza St | convert portion of (e) garage/basement to bedroom/bathDetails
convert portion of (e) garage/basement to bedroom/bath | $5,000 |
| Jun 14, 2005 | Completed final sign-off Oct 2005 | 3725 17th St | remodel kitchen, 2 baths, unit 3725 only,installatin of new subpanel electricDetails
remodel kitchen, 2 baths, unit 3725 only,installatin of new subpanel electric | $26,000 |
| Mar 16, 2004 | Expired or cancelled expired Jan 2007 | 856 Haight St | 858- haight- relocate sink & plumbing, relocate gas line, new elec outlets, 856-remodel bathroom &Details
858- haight- relocate sink & plumbing, relocate gas line, new elec outlets, 856-remodel bathroom & | $10,000 |
| Oct 12, 2001 | Completed final sign-off Dec 2001 | 732 Arguello Bl | unit #2- remodeling bathroomDetails
unit #2- remodeling bathroom | $3,000 |