Back to kitchen remodel contractors
R & R Construction
- Based in
- San Leandro
- On San Francisco permits
- May 2007 to Oct 2014
- Last 24 months
- 0 permits filed
64 permits since 2000: 53 completed, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 8 completed, 1 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2014 | Completed final sign-off Nov 2014 | 919 Divisadero St | install (n) light fixtures in (e) locations through out dining room and hall way area. install 3 new toilets in (e) locations in bathrooms. install one (n) sink and faucet in bathroom. install (n) stainless steel pannels along (e0 pony wall in kitchen. paint interior and exterior of restaurant.Details
install (n) light fixtures in (e) locations through out dining room and hall way area. install 3 new toilets in (e) locations in bathrooms. install one (n) sink and faucet in bathroom. install (n) stainless steel pannels along (e0 pony wall in kitchen. paint interior and exterior of restaurant. | $4,800 |
| May 23, 2013 | Completed final sign-off Mar 2014 | 640 Polk St | ti of exist. approx. 320 sq ft. ground flr retail space. work to incl. new retail counter. minimal prep kitchen equipment for coffee shop. ada upgrade to exist entry and toilet.Details
ti of exist. approx. 320 sq ft. ground flr retail space. work to incl. new retail counter. minimal prep kitchen equipment for coffee shop. ada upgrade to exist entry and toilet. | $70,000 |
| Mar 12, 2013 | Completed final sign-off Apr 2013 | 214 Minerva St | remove & replace kitchen cabinets with new, update electrical in kitchen area. comply with current codes. install new sink, faucet, kitchen appliances. patch drywall as neededDetails
remove & replace kitchen cabinets with new, update electrical in kitchen area. comply with current codes. install new sink, faucet, kitchen appliances. patch drywall as needed | $18,000 |
| Dec 21, 2012 | Expired or cancelled cancelled May 2015 | 1406 Fillmore St | t.i permit to combine 2 (e) storefront retail business(restaurant) into 1 full service restaurant (aprox 2870 sf) work to include interior remodel of (e) kitchen & eating area. (e) bldg is fully sprinklered. elec & plumbing to be on separate permitsDetails
t.i permit to combine 2 (e) storefront retail business(restaurant) into 1 full service restaurant (aprox 2870 sf) work to include interior remodel of (e) kitchen & eating area. (e) bldg is fully sprinklered. elec & plumbing to be on separate permits | $150,000 |
| Nov 23, 2011 | Completed final sign-off Dec 2014 | 72 Alvarado St | basement-develop as per plans-add bedroom & bathroom, pour concrete floor & upgrade (e), upstairs-upgrade electrical, remodel bathroom & kitchen. add stairs to basement level bedroomDetails
basement-develop as per plans-add bedroom & bathroom, pour concrete floor & upgrade (e), upstairs-upgrade electrical, remodel bathroom & kitchen. add stairs to basement level bedroom | $100,000 |
| Nov 29, 2010 | Completed final sign-off Jul 2011 | 830 Cole St | remodel kitchen - appliance to remain in exisitng locations, upgrade electrical. remodel bathroom - remove & replace tile upgrade plumbing fixtures, upgrade electrical. new lighting comply w/cec 150 (k).Details
remodel kitchen - appliance to remain in exisitng locations, upgrade electrical. remodel bathroom - remove & replace tile upgrade plumbing fixtures, upgrade electrical. new lighting comply w/cec 150 (k). | $23,000 |
| Oct 5, 2010 | Never finaled issued Oct 2010, no final | 2790 Folsom St | to comply with nov#201036094. remove kitchen cabinets, sink and appliances, from bedroom unit #6. maintain extg bathroom. revert back to legal six dwelling units.Details
to comply with nov#201036094. remove kitchen cabinets, sink and appliances, from bedroom unit #6. maintain extg bathroom. revert back to legal six dwelling units. | $5,000 |
| Jul 15, 2010 | Completed final sign-off Nov 2011 | 652 Polk St | expand full service restaurant to next door vacant laundry store, move e kitchen to next door rear portion, doing all related workDetails
expand full service restaurant to next door vacant laundry store, move e kitchen to next door rear portion, doing all related work | $100,000 |
| Mar 29, 2010 | Completed final sign-off Aug 2010 | 2333 Bryant St | remodel kitche & bathroom-appliances stay in (e) location, repair plaster in rooms as needed. upgrade electrical in walls needed to be opened. no structural work. kitchen lighting to be at least 50% high efficacy & bathroom lighting to be high efficacy lighting or occupancy sensor controlDetails
remodel kitche & bathroom-appliances stay in (e) location, repair plaster in rooms as needed. upgrade electrical in walls needed to be opened. no structural work. kitchen lighting to be at least 50% high efficacy & bathroom lighting to be high efficacy lighting or occupancy sensor control | $21,000 |
| Nov 3, 2009 | Completed final sign-off Jan 2010 | 646 Fillmore St | kitchen remodel - area 10ft x 10ft , sheet rock, new electrical, new plumbing, cabinets, countertop sink appliancesDetails
kitchen remodel - area 10ft x 10ft , sheet rock, new electrical, new plumbing, cabinets, countertop sink appliances | $18,000 |