Back to bathroom remodel contractors
R & R Construction
- Based in
- San Leandro
- On San Francisco permits
- May 2007 to Oct 2014
- Last 24 months
- 0 permits filed
64 permits since 2000: 53 completed, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2014 | Completed final sign-off Nov 2014 | 919 Divisadero St | install (n) light fixtures in (e) locations through out dining room and hall way area. install 3 new toilets in (e) locations in bathrooms. install one (n) sink and faucet in bathroom. install (n) stainless steel pannels along (e0 pony wall in kitchen. paint interior and exterior of restaurant.Details
install (n) light fixtures in (e) locations through out dining room and hall way area. install 3 new toilets in (e) locations in bathrooms. install one (n) sink and faucet in bathroom. install (n) stainless steel pannels along (e0 pony wall in kitchen. paint interior and exterior of restaurant. | $4,800 |
| Nov 23, 2011 | Completed final sign-off Dec 2014 | 72 Alvarado St | basement-develop as per plans-add bedroom & bathroom, pour concrete floor & upgrade (e), upstairs-upgrade electrical, remodel bathroom & kitchen. add stairs to basement level bedroomDetails
basement-develop as per plans-add bedroom & bathroom, pour concrete floor & upgrade (e), upstairs-upgrade electrical, remodel bathroom & kitchen. add stairs to basement level bedroom | $100,000 |
| Nov 29, 2010 | Completed final sign-off Jul 2011 | 830 Cole St | remodel kitchen - appliance to remain in exisitng locations, upgrade electrical. remodel bathroom - remove & replace tile upgrade plumbing fixtures, upgrade electrical. new lighting comply w/cec 150 (k).Details
remodel kitchen - appliance to remain in exisitng locations, upgrade electrical. remodel bathroom - remove & replace tile upgrade plumbing fixtures, upgrade electrical. new lighting comply w/cec 150 (k). | $23,000 |
| Oct 5, 2010 | Never finaled issued Oct 2010, no final | 2790 Folsom St | to comply with nov#201036094. remove kitchen cabinets, sink and appliances, from bedroom unit #6. maintain extg bathroom. revert back to legal six dwelling units.Details
to comply with nov#201036094. remove kitchen cabinets, sink and appliances, from bedroom unit #6. maintain extg bathroom. revert back to legal six dwelling units. | $5,000 |
| Mar 29, 2010 | Completed final sign-off Aug 2010 | 2333 Bryant St | remodel kitche & bathroom-appliances stay in (e) location, repair plaster in rooms as needed. upgrade electrical in walls needed to be opened. no structural work. kitchen lighting to be at least 50% high efficacy & bathroom lighting to be high efficacy lighting or occupancy sensor controlDetails
remodel kitche & bathroom-appliances stay in (e) location, repair plaster in rooms as needed. upgrade electrical in walls needed to be opened. no structural work. kitchen lighting to be at least 50% high efficacy & bathroom lighting to be high efficacy lighting or occupancy sensor control | $21,000 |