Back to kitchen remodel contractors
R E G Construction
- Based in
- Dalycity
- On San Francisco permits
- Nov 2017 to Aug 2022
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2022 | Completed final sign-off Jul 2024 | 2969 24th Av | revision to no-plan pa# 202203210430. fixing wood rot in kitchen. new beam. adding shower downstairs. framing room in garage downstairs.Details
revision to no-plan pa# 202203210430. fixing wood rot in kitchen. new beam. adding shower downstairs. framing room in garage downstairs. | $20,000 |
| Mar 21, 2022 | Completed final sign-off Jul 2024 | 2969 24th Av | kitchen remodel removing old cabinets, sink, and appliances. replacing with new. upstairs toliet same thing taking out old replacing with new in same place.Details
kitchen remodel removing old cabinets, sink, and appliances. replacing with new. upstairs toliet same thing taking out old replacing with new in same place. | $20,000 |
| Mar 8, 2022 | Completed final sign-off Sep 2022 | 56 Rico Wy | one kitchen and one bath remodel simple change out of existing cabinets sink stove. replace toilet and vanity new tile, paint. closing off exisitng shower and replace mirror.Details
one kitchen and one bath remodel simple change out of existing cabinets sink stove. replace toilet and vanity new tile, paint. closing off exisitng shower and replace mirror. | $30,000 |
| Oct 3, 2020 | Completed final sign-off Oct 2020 | 2409 Scott St | replacing (3) windows in rear of building (kitchen) straight like for like wood marvin windows w/ lowe glass. work not visible from the streetDetails
replacing (3) windows in rear of building (kitchen) straight like for like wood marvin windows w/ lowe glass. work not visible from the street | $1,500 |
| Jul 8, 2020 | Completed final sign-off Sep 2020 | 2409 Scott St | remodel kitchen, new cabinets,new floor tile. painting,install new gfci's install 4" lights. very light plumbingDetails
remodel kitchen, new cabinets,new floor tile. painting,install new gfci's install 4" lights. very light plumbing | $25,000 |
| Feb 1, 2019 | Never finaled issued Feb 2019, no final | 571 Campbell Av | kitchen and bathroom remodel-new cabinets in kitchen, upper and lower new windows, plumbing, repair section sections on roof, electrical, new service panel, new sheetrock in kitchen and bathroomDetails
kitchen and bathroom remodel-new cabinets in kitchen, upper and lower new windows, plumbing, repair section sections on roof, electrical, new service panel, new sheetrock in kitchen and bathroom | $14,000 |