Back to bathroom remodel contractors
R E G Construction
- Based in
- Dalycity
- On San Francisco permits
- Nov 2017 to Aug 2022
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2022 | Completed final sign-off Sep 2022 | 56 Rico Wy | one kitchen and one bath remodel simple change out of existing cabinets sink stove. replace toilet and vanity new tile, paint. closing off exisitng shower and replace mirror.Details
one kitchen and one bath remodel simple change out of existing cabinets sink stove. replace toilet and vanity new tile, paint. closing off exisitng shower and replace mirror. | $30,000 |
| Nov 16, 2020 | Completed final sign-off Mar 2021 | 3394 16th St | bathroom remodel in kind 49 sq ft floor 3. new walk in shower new toilet new vanity, new fixtures n electric heating pad under new tile replace e window in kind visible from streetDetails
bathroom remodel in kind 49 sq ft floor 3. new walk in shower new toilet new vanity, new fixtures n electric heating pad under new tile replace e window in kind visible from street | $14,000 |
| Feb 1, 2019 | Never finaled issued Feb 2019, no final | 571 Campbell Av | kitchen and bathroom remodel-new cabinets in kitchen, upper and lower new windows, plumbing, repair section sections on roof, electrical, new service panel, new sheetrock in kitchen and bathroomDetails
kitchen and bathroom remodel-new cabinets in kitchen, upper and lower new windows, plumbing, repair section sections on roof, electrical, new service panel, new sheetrock in kitchen and bathroom | $14,000 |
| Nov 30, 2017 | Completed final sign-off Jan 2018 | 63 Rae Av | dry rot removal front steps - in kind replacement less than 50%; bathroom floor (interior only)Details
dry rot removal front steps - in kind replacement less than 50%; bathroom floor (interior only) | $25,000 |