Back to kitchen remodel contractors
R Diaz Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Feb 2025
- Last 24 months
- 1 permit filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2023 | Completed final sign-off Feb 2026 | 2115 Kirkham St | abate planning code 2022-01279enf, dbi nov 202301551, 202301534, 202301428 & 202301403. remove unpermitted infill notches @ rear of bldg, remove unpermitted deck, kitchen, bathrm & rooms at 1st fl & legailized infill of lightwell againt blank wall. additionally all other unpermitted items listedDetails
abate planning code 2022-01279enf, dbi nov 202301551, 202301534, 202301428 & 202301403. remove unpermitted infill notches @ rear of bldg, remove unpermitted deck, kitchen, bathrm & rooms at 1st fl & legailized infill of lightwell againt blank wall. additionally all other unpermitted items listed | $100,000 |
| Feb 1, 2023 | Completed final sign-off Nov 2023 | 45 Cleary Ct | remove and replace (e) cabinets with same layout (no structural changes) remove and replace tile and plumbing fixtures: no exterior work- 2 bath and 1 kitchenDetails
remove and replace (e) cabinets with same layout (no structural changes) remove and replace tile and plumbing fixtures: no exterior work- 2 bath and 1 kitchen | $40,000 |
| Sep 2, 2022 | Completed final sign-off Oct 2022 | 1965 Bush St | apt #2: kitchen- remove and replace (6) cabinets, top, faucet. bath- remove and replace vanity, shower faucet, tile floor 5 x 6 shower walls. paint kitchen and bathroom. no structural or layout changes.Details
apt #2: kitchen- remove and replace (6) cabinets, top, faucet. bath- remove and replace vanity, shower faucet, tile floor 5 x 6 shower walls. paint kitchen and bathroom. no structural or layout changes. | $25,000 |
| Jun 8, 2020 | Completed final sign-off Sep 2020 | 223 09th Av | all work in-kind: r/r kitchen countertops, tile backsplash, same cabinets remain, laminate kitchen floor. r/r bathtub, r/r shower valve, new shower pan, tile shower in the tub area and floor.paint apt, no structural work is involved. no layout changes. no walls infilled or modified.Details
all work in-kind: r/r kitchen countertops, tile backsplash, same cabinets remain, laminate kitchen floor. r/r bathtub, r/r shower valve, new shower pan, tile shower in the tub area and floor.paint apt, no structural work is involved. no layout changes. no walls infilled or modified. | $22,000 |
| Oct 22, 2019 | Completed final sign-off Feb 2020 | 210 Ashbury St | replace kitchen cabinets and countertop inkind, same location. no structurau work is involved. remove bathroom tub and install shower pan.Details
replace kitchen cabinets and countertop inkind, same location. no structurau work is involved. remove bathroom tub and install shower pan. | $12,000 |