Block 1424, lot 003
223 09th Ave
- City’s use
- Multi-Family Residential
- Built
- 1940
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 3,076 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 8, 2021 | Completed final sign-off Jul 2021 | 223 09th Av | Tom Lee Roofing Inc. | re-roofingDetails
re-roofing | $21,000 |
| Jun 8, 2020 | Completed final sign-off Sep 2020 | 223 09th Av | R Diaz Construction | all work in-kind: r/r kitchen countertops, tile backsplash, same cabinets remain, laminate kitchen floor. r/r bathtub, r/r shower valve, new shower pan, tile shower in the tub area and floor.paint apt, no structural work is involved. no layout changes. no walls infilled or modified.Details
all work in-kind: r/r kitchen countertops, tile backsplash, same cabinets remain, laminate kitchen floor. r/r bathtub, r/r shower valve, new shower pan, tile shower in the tub area and floor.paint apt, no structural work is involved. no layout changes. no walls infilled or modified. | $22,000 |
| Sep 12, 2018 | Completed final sign-off Nov 2018 | 221 09th Av | Bay Area Window Pros | replace 21 existing windows total. all front windows to be wood aluminum clad with grids matching existing pattern and same openings and operation as existing. rear windows and non-visible lightwell windows to be replaced with vinyl frame window in existing openingsDetails
replace 21 existing windows total. all front windows to be wood aluminum clad with grids matching existing pattern and same openings and operation as existing. rear windows and non-visible lightwell windows to be replaced with vinyl frame window in existing openings | $23,000 |
| May 2, 2008 | Completed final sign-off Jun 2008 | 221 09th Av | 21st Century Home Improvt | remove & replace 4 windows in rear of home, install vinyl double-pane in kind no structural changes, not visible from streetDetails
remove & replace 4 windows in rear of home, install vinyl double-pane in kind no structural changes, not visible from street | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- 21st Century Home Improvt, Bay Area Window Pros, R Diaz Construction, Tom Lee Roofing Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.