Back to kitchen remodel contractors
R & D Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Aug 2026
- Last 24 months
- 20 permits filed
319 permits since 2000: 252 completed, 18 in progress, 33 never finaled, 16 expired or cancelled.
Of the 33 never-finaled permits, 8 are 3 to 5 years old, 8 are 5 to 10 years old, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
99 kitchen remodel permits: 80 completed, 3 in progress, 12 never finaled, 4 expired or cancelled. Typically 3 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 26, 2025 | In progress issued Dec 2025 | 108 Westwood Dr | 1st flr:excavate 1'-5" to meet ceiling hgts & full slab replacement. construct 2 new master beds with suite bath; family room, laundry, powder room. install new existing windows at bath room, family room, bathroom. 2nd fl: remove existing interior walls between kitchen & dining/living rooms toDetails
1st flr:excavate 1'-5" to meet ceiling hgts & full slab replacement. construct 2 new master beds with suite bath; family room, laundry, powder room. install new existing windows at bath room, family room, bathroom. 2nd fl: remove existing interior walls between kitchen & dining/living rooms to | $300,000 |
| Feb 21, 2025 | Expired or cancelled expired Apr 2026 | 249 Richland Av | revision to pa #202405212583 to replace additional area of foundation at rear of building, minor plan changes on 2nd floor closets and kitchenDetails
revision to pa #202405212583 to replace additional area of foundation at rear of building, minor plan changes on 2nd floor closets and kitchen | $8,000 |
| Feb 5, 2025 | In progress issued Apr 2025 | 2974 26th Av | revision to pa# 202412066324. bsmt: convert storage to 3 bedrooms, 2 bath, provide escape patio well for bedroom. 1/f: convert storage to rec room and bath. replace deteriorated foudnation at n&s side of bldg. upper/lower 2/f: remodel and reconfig (e) kitchen, breakfast rooms, dining room, removeDetails
revision to pa# 202412066324. bsmt: convert storage to 3 bedrooms, 2 bath, provide escape patio well for bedroom. 1/f: convert storage to rec room and bath. replace deteriorated foudnation at n&s side of bldg. upper/lower 2/f: remodel and reconfig (e) kitchen, breakfast rooms, dining room, remove | |
| Dec 6, 2024 | In progress issued Dec 2024 | 2974 26th Av | remodel 1 (e) kitchen & 1 (e) bathroom. demo laths & plaster at living rm & bedroom, approx 500 sfDetails
remodel 1 (e) kitchen & 1 (e) bathroom. demo laths & plaster at living rm & bedroom, approx 500 sf | $50,000 |
| Aug 26, 2024 | Completed final sign-off Jul 2025 | 540 Victoria St | roof: nw roofing, 2 nw skylights, replace existing skylight. 2ndfl:replace window inkind (wd front), remodel kitchen & bath. ground fl: replace garage door, alley windows+ rear windows in kind. remodel layout. voluntary seismic strengthing. nw rear conc. patio + stair. replace furnace w/heat pump.Details
roof: nw roofing, 2 nw skylights, replace existing skylight. 2ndfl:replace window inkind (wd front), remodel kitchen & bath. ground fl: replace garage door, alley windows+ rear windows in kind. remodel layout. voluntary seismic strengthing. nw rear conc. patio + stair. replace furnace w/heat pump. | $86,000 |
| May 21, 2024 | Completed final sign-off Apr 2026 | 249 Richland Av | remove (e) covered porch and stair. 73sf 1-story hoziontal addition over storage space at rear . reconstruct roof over kitchen/dining room .remodel ktichen and relcoate laundry , remodel lower level bathroom and new landing and stair to yard.Details
remove (e) covered porch and stair. 73sf 1-story hoziontal addition over storage space at rear . reconstruct roof over kitchen/dining room .remodel ktichen and relcoate laundry , remodel lower level bathroom and new landing and stair to yard. | $165,508 |
| Mar 13, 2024 | Completed final sign-off Feb 2025 | 7 Maddux Av | 1st fl: add side entry door. 2nd fl: relocate kitchen and bdrm. remodel bath. in fill interior stairs. add rear deck. revert vinyl siding back to stucco at front. replace window at front and rear per planDetails
1st fl: add side entry door. 2nd fl: relocate kitchen and bdrm. remodel bath. in fill interior stairs. add rear deck. revert vinyl siding back to stucco at front. replace window at front and rear per plan | $50,000 |
| Feb 29, 2024 | Completed final sign-off Mar 2025 | 1418 27th Av | 1st fl add 1 bedroom, 2 full baths family room and laundry. 2nd fl remodel kitchen and bath. new office. reconfigure interior stairs add 1 full bath. infill center patioDetails
1st fl add 1 bedroom, 2 full baths family room and laundry. 2nd fl remodel kitchen and bath. new office. reconfigure interior stairs add 1 full bath. infill center patio | $200,000 |
| Feb 1, 2024 | Completed final sign-off Mar 2024 | 1417 27th Av | revision to bpa# 202311070369: 3rd floor - layout change in kitchen and bathroom.Details
revision to bpa# 202311070369: 3rd floor - layout change in kitchen and bathroom. | |
| Nov 7, 2023 | Completed final sign-off Mar 2024 | 1417 27th Av | kitchen and bathroom remodel in kind.Details
kitchen and bathroom remodel in kind. | $28,000 |
| Nov 7, 2023 | Completed final sign-off Mar 2025 | 1418 27th Av | kitchen and bathroom on 2nd floor. remove (e) old finishes (doors, flooring, baseboards, etc.) replace damaged drywall in living and dining rooms. repair in kind.Details
kitchen and bathroom on 2nd floor. remove (e) old finishes (doors, flooring, baseboards, etc.) replace damaged drywall in living and dining rooms. repair in kind. | $38,000 |
| Jun 29, 2023 | Completed final sign-off Aug 2024 | 2720 20th St | 1/f: add habitable space at rear garage (2 bed & 2 baths), excavate 18-24in & replace (e) brick foundations,upgrade internal stair. 2/f: kitchen/bathroom remodel, add bed/bath.Details
1/f: add habitable space at rear garage (2 bed & 2 baths), excavate 18-24in & replace (e) brick foundations,upgrade internal stair. 2/f: kitchen/bathroom remodel, add bed/bath. | $211,000 |
| Apr 26, 2022 | Completed final sign-off Dec 2024 | 2558 17th Av | remodel kitchen and 3 bedrooms, relocate 2 baths. new deck over (e) roof accessible from 3/f. convert part of garage into conditioned area: new bedroom and bath, laundry and powder room, new family room.Details
remodel kitchen and 3 bedrooms, relocate 2 baths. new deck over (e) roof accessible from 3/f. convert part of garage into conditioned area: new bedroom and bath, laundry and powder room, new family room. | $500,000 |
| Apr 20, 2022 | Completed final sign-off Apr 2023 | 624 Urbano Dr | 2nd floor: kitchen remodel, convert half bath to a full bath. resize interior stair. remove skylight.Details
2nd floor: kitchen remodel, convert half bath to a full bath. resize interior stair. remove skylight. | $30,000 |
| Jan 13, 2022 | Never finaled issued Jan 2022, no final | 400 Franconia St | remodel (e) kitchen & batrooms, demo laths and plaster at living room & bedrooms, approx 600 sqt. verification site.Details
remodel (e) kitchen & batrooms, demo laths and plaster at living room & bedrooms, approx 600 sqt. verification site. | $28,000 |
| Dec 9, 2021 | Completed final sign-off May 2024 | 1737 08th Av | 1/f add (1) bedrom, family, exercixe, mud room, laundry; 2/f remodel bath & kitchen, add 1/2 bath, add deck @ rear; 3/f remodel bath & kitchen, add roof deck @ rear. reconfigure interior stairs, replace front windows in kind. replace garage door. sprinkler whole building with nfpa 13dDetails
1/f add (1) bedrom, family, exercixe, mud room, laundry; 2/f remodel bath & kitchen, add 1/2 bath, add deck @ rear; 3/f remodel bath & kitchen, add roof deck @ rear. reconfigure interior stairs, replace front windows in kind. replace garage door. sprinkler whole building with nfpa 13d | $135,000 |
| Sep 15, 2021 | Never finaled issued Sep 2021, no final | 2609 Diamond St | existing kitchen w/ led lights (80 sqft) and bathroom w/ led light w/ sencors (35 sqft) remodel in kind. to remove all existing interior finishes and exisiting interior hardwood floor. replace exh fan & re connect exh duct in bathroomDetails
existing kitchen w/ led lights (80 sqft) and bathroom w/ led light w/ sencors (35 sqft) remodel in kind. to remove all existing interior finishes and exisiting interior hardwood floor. replace exh fan & re connect exh duct in bathroom | $20,000 |
| Jun 8, 2021 | Expired or cancelled cancelled Mar 2022 | 28 Bache St | replace counter top, kitchen cabinet, kitchen sink, lightings and outlets at kitchen. replace bathroom tile, bathtub and toilet sink. for unit 28.Details
replace counter top, kitchen cabinet, kitchen sink, lightings and outlets at kitchen. replace bathroom tile, bathtub and toilet sink. for unit 28. | $16,000 |
| May 14, 2021 | Expired or cancelled cancelled Feb 2026 | 986 Burnett Av | interior remodel: 1st fl: add a bedroom, a family room, a study room, two full bathrooms. 2nd fl: remodel kitchen, relocate bathroom, remodel interior stair.Details
interior remodel: 1st fl: add a bedroom, a family room, a study room, two full bathrooms. 2nd fl: remodel kitchen, relocate bathroom, remodel interior stair. | $85,000 |
| May 13, 2021 | Completed final sign-off Dec 2021 | 432 35th Av | remodel (e) kitchen & master bathroom @ 3rd flDetails
remodel (e) kitchen & master bathroom @ 3rd fl | $18,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2021 | 61 Elk St | remove (e) wall between kitchen and diniing roomDetails
remove (e) wall between kitchen and diniing room | $4,000 |
| Mar 16, 2021 | Completed final sign-off Mar 2021 | 437 Ellsworth St | revision to pa# 201807033727. relocate (e) skylights, reconfigure powder room & kitchen & stairway layout to 2nd floor per plan.Details
revision to pa# 201807033727. relocate (e) skylights, reconfigure powder room & kitchen & stairway layout to 2nd floor per plan. | |
| Mar 11, 2021 | Completed final sign-off Jun 2021 | 61 Elk St | remodel extg kitchen and bathroom at 2nd floor. upgrade electrical throughout 2nd floor. replace damage drywall at dining room ceiling with 5/8" and type x sheetrock.Details
remodel extg kitchen and bathroom at 2nd floor. upgrade electrical throughout 2nd floor. replace damage drywall at dining room ceiling with 5/8" and type x sheetrock. | $32,000 |
| Mar 11, 2020 | Completed final sign-off Dec 2021 | 432 35th Av | interior remodel: legalize kitchen in 1st floor (total 557 sf) to be an adu per ordinance no 162-62. add 73 sq ft landscape permeable paver in front yard. to comply wiht nov 201906121.Details
interior remodel: legalize kitchen in 1st floor (total 557 sf) to be an adu per ordinance no 162-62. add 73 sq ft landscape permeable paver in front yard. to comply wiht nov 201906121. | $30,000 |
| Aug 1, 2019 | Completed final sign-off Aug 2020 | 1225 Douglass St | enclose (e) lightfill at south side of bld. relocate (e) kitchen, bathroom and add 1 bathrm at 2nd. new 2 bedrms, 2 baths, family rm, laundry rm & wine cellar at 1st & basement, new balconies on 1st & 2nd at rear side of bld. new roof deckDetails
enclose (e) lightfill at south side of bld. relocate (e) kitchen, bathroom and add 1 bathrm at 2nd. new 2 bedrms, 2 baths, family rm, laundry rm & wine cellar at 1st & basement, new balconies on 1st & 2nd at rear side of bld. new roof deck | $150,000 |
| Jul 1, 2019 | Never finaled issued Aug 2019, no final | 12 Barcelona Av | 1st flr -add 1 bedroom and 1 and a half bath. 2nd and 3rd flr -remodel kitchen and bath. add 1 full bath. reconfigure the interior stairs.Details
1st flr -add 1 bedroom and 1 and a half bath. 2nd and 3rd flr -remodel kitchen and bath. add 1 full bath. reconfigure the interior stairs. | $60,000 |
| Apr 17, 2019 | Completed final sign-off Aug 2020 | 1225 Douglass St | remodel (e) kitchen & bathroom at 2nd fl. remove and replace lath & plaster with 5/8" type x gb at bedrooms.Details
remodel (e) kitchen & bathroom at 2nd fl. remove and replace lath & plaster with 5/8" type x gb at bedrooms. | $7,000 |
| Mar 21, 2019 | Completed final sign-off Apr 2022 | 1783 08th Av | remove (e) non-permitted rear ext. stair. add 61.6 living area on (3) flrs each. add stair penthouse & roof deck for 1785 (unit 2). (n) kitchen & (n) bath for 1783 (unit 1).Details
remove (e) non-permitted rear ext. stair. add 61.6 living area on (3) flrs each. add stair penthouse & roof deck for 1785 (unit 2). (n) kitchen & (n) bath for 1783 (unit 1). | $50,000 |
| Jan 28, 2019 | Completed final sign-off Apr 2022 | 1783 08th Av | 1st floor: convert storage area to bedroom, add bath and stair. infill below bay. 2nd floor total remodel, relocate kitchen/bath, add stairs to 1st fl. 3rd floor: total remodel, extg kitchen to remain, relocate bath, add bath, change out front windows. add 1 bathroom windowDetails
1st floor: convert storage area to bedroom, add bath and stair. infill below bay. 2nd floor total remodel, relocate kitchen/bath, add stairs to 1st fl. 3rd floor: total remodel, extg kitchen to remain, relocate bath, add bath, change out front windows. add 1 bathroom window | $150,000 |
| Jan 9, 2018 | Completed final sign-off Nov 2020 | 337 Precita Av | remodel kitchen and bathroom fixtures to remain at same locationDetails
remodel kitchen and bathroom fixtures to remain at same location | $20,000 |
| Sep 26, 2017 | Completed final sign-off Nov 2018 | 1531 18th Av | infill left side lightwell. 1st fl: remodel bath, add 1 full bath, laundry and wet bar. 2nd fl: remodel kitchen & bathroom. add 1 full bath and office. and reconfigure interior stairs. new cantilever deck at rear.Details
infill left side lightwell. 1st fl: remodel bath, add 1 full bath, laundry and wet bar. 2nd fl: remodel kitchen & bathroom. add 1 full bath and office. and reconfigure interior stairs. new cantilever deck at rear. | $60,000 |
| Sep 15, 2017 | Completed final sign-off Aug 2018 | 224 Miguel St | 2nd fl - remodel (e) kitchen and bedroom. relocate (e) bathroom on 2nd floor. attic floor - new bedrooms, bathroom and roof deck. 4 new dormers. create (n) stairway to connect attic floorDetails
2nd fl - remodel (e) kitchen and bedroom. relocate (e) bathroom on 2nd floor. attic floor - new bedrooms, bathroom and roof deck. 4 new dormers. create (n) stairway to connect attic floor | $80,000 |
| Jul 24, 2017 | Never finaled issued Jul 2017, no final | 400 Franconia St | remodel (e) kitchen & bathrooms. demo laths & plaster at living room, bedrooms & in each floor. approx 600 sq ft for structural. verification space available for future construction.Details
remodel (e) kitchen & bathrooms. demo laths & plaster at living room, bedrooms & in each floor. approx 600 sq ft for structural. verification space available for future construction. | $58,000 |
| Jul 14, 2017 | Completed final sign-off Apr 2018 | 30 College Av | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $20,000 |
| Jul 11, 2017 | Completed final sign-off Nov 2018 | 1531 18th Av | demo laths & plaster at bathroom and kitchen on 2nd floor. approx 600 sf & bath tile to investigate space available for future construction remodel. remodel under sep permit. replace with 5/8" type x sheetrock after investigative demo.Details
demo laths & plaster at bathroom and kitchen on 2nd floor. approx 600 sf & bath tile to investigate space available for future construction remodel. remodel under sep permit. replace with 5/8" type x sheetrock after investigative demo. | $500 |
| Jun 22, 2017 | Never finaled issued Jul 2017, no final | 127 Seal Rock Dr | 1) proposed kitchen remodel including removing extg bearing wall. 2)reconfigure upper floor bedroom and bathroom layout. 3)add 651 sq ft habitable space to lower floor. 4) reconfigure stair to lower floor and new stair to new 350 sf deck.Details
1) proposed kitchen remodel including removing extg bearing wall. 2)reconfigure upper floor bedroom and bathroom layout. 3)add 651 sq ft habitable space to lower floor. 4) reconfigure stair to lower floor and new stair to new 350 sf deck. | $140,000 |
| Mar 9, 2017 | Expired or cancelled suspend Aug 2017 | 4068 Folsom St | interior renovation within (e) envelope. move kitchen to 1st flr: new bath on each floor. interior renovations per plans.Details
interior renovation within (e) envelope. move kitchen to 1st flr: new bath on each floor. interior renovations per plans. | $20,000 |
| Feb 9, 2017 | Completed final sign-off Nov 2017 | 1051 Alabama St | remodel (e) kitchen & bathroom & replace old lath & plaster at 2nd floor with new 5/8" type "x" gyp boardDetails
remodel (e) kitchen & bathroom & replace old lath & plaster at 2nd floor with new 5/8" type "x" gyp board | $20,000 |
| Feb 1, 2017 | Completed final sign-off Aug 2018 | 324 Douglass St | revision to 201608034116. new roof deck and spiral sairway. relocate kitchen, reconfigure bedroom and bath. add powder rm on 2nd floor per plan.Details
revision to 201608034116. new roof deck and spiral sairway. relocate kitchen, reconfigure bedroom and bath. add powder rm on 2nd floor per plan. | $30,000 |
| Nov 16, 2016 | Completed final sign-off May 2017 | 112 Virginia Av | 1. alternate extg 2nd floor as per plan. relocate extg kitchen and bathroom on 2nd floor. 2. voluntary structural strengthening of walls - installation of plywood sheathing.Details
1. alternate extg 2nd floor as per plan. relocate extg kitchen and bathroom on 2nd floor. 2. voluntary structural strengthening of walls - installation of plywood sheathing. | $40,000 |
| Nov 4, 2016 | Completed final sign-off May 2017 | 112 Virginia Av | new 2 bedroom, 2 bath and laundry at gr fl. remodel e kitchen and bath at 2nd fl relocate interior stairway. add new rear wood deck. replace existing rear flat roofDetails
new 2 bedroom, 2 bath and laundry at gr fl. remodel e kitchen and bath at 2nd fl relocate interior stairway. add new rear wood deck. replace existing rear flat roof | $10,000 |
| Sep 22, 2016 | Completed final sign-off Nov 2024 | 120 Brewster St | horizontal & vertical addition for 3 story w/ garage, add garage at front, add dining room, kitchen, family room, laundry rm on 1st fl, add bedroom, bathroom at 2nd fl, add living room at 3rd fl.Details
horizontal & vertical addition for 3 story w/ garage, add garage at front, add dining room, kitchen, family room, laundry rm on 1st fl, add bedroom, bathroom at 2nd fl, add living room at 3rd fl. | $100,000 |
| Sep 20, 2016 | Completed final sign-off May 2017 | 112 Virginia Av | replace lath & plaster at living room and dining room with drywall sheetrock. remodel (e) kitchen & bathroom.Details
replace lath & plaster at living room and dining room with drywall sheetrock. remodel (e) kitchen & bathroom. | $30,000 |
| Aug 3, 2016 | Completed final sign-off Aug 2018 | 324 Douglass St | 1st floor - add a bedroom and 1 bath; legalize laundry room, bedroom and bathroom. upgrade electrical, plumbing and mechanical. replace windows w/wood windows. new interior stair to connect to 2nd floor. strengthening foundation. 2nd floor - convert master bedrm to kitchen, remodel kitchen/bathroom,Details
1st floor - add a bedroom and 1 bath; legalize laundry room, bedroom and bathroom. upgrade electrical, plumbing and mechanical. replace windows w/wood windows. new interior stair to connect to 2nd floor. strengthening foundation. 2nd floor - convert master bedrm to kitchen, remodel kitchen/bathroom, | $150,000 |
| Jul 12, 2016 | Completed final sign-off May 2017 | 546 Anderson St | remodel (e) kitchen & 2 bathrooms, replace drywall at bedrooms and living room. no walls to be added or removed, no relocation of bathroom or kitchen. drywall replace approx. 1800 sq.ft.Details
remodel (e) kitchen & 2 bathrooms, replace drywall at bedrooms and living room. no walls to be added or removed, no relocation of bathroom or kitchen. drywall replace approx. 1800 sq.ft. | $36,000 |
| Nov 5, 2015 | Completed final sign-off Aug 2016 | 1754 08th Av | upper unit: remodel (e) kitchen & bathroom & add one master bathroom, upgrade interior stair connect to garage, infill (e) 10'x4" & 5'x2" lightwells. lower unit: remodel (e) kitchen & bathroom.Details
upper unit: remodel (e) kitchen & bathroom & add one master bathroom, upgrade interior stair connect to garage, infill (e) 10'x4" & 5'x2" lightwells. lower unit: remodel (e) kitchen & bathroom. | $130,000 |
| Oct 20, 2015 | Completed final sign-off Jun 2016 | 79 Arbor St | 1st flr: (n)2 bedrm, full bath, (n) interior stair up to 2nd fl, remove rear stair, (n) rear deck; 2nd floor (n) master bedrooms, 1 full bath,(n) laundry rooms, (n) windows; 3rd floor - remodel (e) kitchen, relocate and remodel (e) bathroom, change bedroom to dining room, replace 4 windows with newDetails
1st flr: (n)2 bedrm, full bath, (n) interior stair up to 2nd fl, remove rear stair, (n) rear deck; 2nd floor (n) master bedrooms, 1 full bath,(n) laundry rooms, (n) windows; 3rd floor - remodel (e) kitchen, relocate and remodel (e) bathroom, change bedroom to dining room, replace 4 windows with new | $150,000 |
| Oct 13, 2015 | Completed final sign-off Jun 2016 | 79 Arbor St | 1. kitchen and bathroom remodel - cabinet, counter top, floor tile. 2. soft demo - floor and wall finishes, cracked sheetrock.Details
1. kitchen and bathroom remodel - cabinet, counter top, floor tile. 2. soft demo - floor and wall finishes, cracked sheetrock. | $10,000 |
| Aug 10, 2015 | Completed final sign-off Aug 2016 | 4660 18th St | soft demolition - kitchen, bathroom, finishes, doors.Details
soft demolition - kitchen, bathroom, finishes, doors. | $5,000 |
| Jul 24, 2015 | Never finaled issued Aug 2015, no final | 65 Lippard Av | relocate 1/f unit down to basement, expand upper unit down to 1/f, modify partition walls, add 2 bathrooms, remodel kitchens, replace windows, repair deck in kind, provide slab on grade @ basement & modify front of bldg.Details
relocate 1/f unit down to basement, expand upper unit down to 1/f, modify partition walls, add 2 bathrooms, remodel kitchens, replace windows, repair deck in kind, provide slab on grade @ basement & modify front of bldg. | $140,000 |
| Nov 4, 2014 | Completed final sign-off Nov 2015 | 540 Texas St | legalize 2 bedrooms, 1 bathroom & 1/2 bathroom on 1/f, new interior stair, remodel (e) kitchen, bathroom @ 2/f. upgrade electrical & plumbing, replace all steel frame window with new wood windows, strengthening the foundation.Details
legalize 2 bedrooms, 1 bathroom & 1/2 bathroom on 1/f, new interior stair, remodel (e) kitchen, bathroom @ 2/f. upgrade electrical & plumbing, replace all steel frame window with new wood windows, strengthening the foundation. | $70,000 |
| Oct 24, 2014 | Completed final sign-off Jan 2016 | 373 Cumberland St | remodel (e) kitchen & bathroom on main floor. remodel (e) bathroom on top floor. upgrade interior electrical throughout . replace (e) furnace.Details
remodel (e) kitchen & bathroom on main floor. remodel (e) bathroom on top floor. upgrade interior electrical throughout . replace (e) furnace. | $20,000 |
| Oct 2, 2014 | Completed final sign-off Feb 2015 | 114 Banks St | remodel (e) 2 bathroom, relocate (e) kitchen, legalize bathroom/bedroom @ 1st flr, relocate/rebuilt non conforming stair interior, upgrade electrical plumbing and mechanical, strengthening foundation, 5 replace 4 metal wd with wood wd in same opening.Details
remodel (e) 2 bathroom, relocate (e) kitchen, legalize bathroom/bedroom @ 1st flr, relocate/rebuilt non conforming stair interior, upgrade electrical plumbing and mechanical, strengthening foundation, 5 replace 4 metal wd with wood wd in same opening. | $78,000 |
| Sep 29, 2014 | Completed final sign-off Feb 2015 | 114 Banks St | remodel existing kitchen & bathroom on 2nd floor. repair damaged drywalls as needed on 2nd floor.Details
remodel existing kitchen & bathroom on 2nd floor. repair damaged drywalls as needed on 2nd floor. | $22,500 |
| Sep 19, 2014 | Completed final sign-off Dec 2015 | 1669 Alabama St | remodel of (e) single family dwelling, infill below (e) habitable space, remodel kitchen & bathrooms, add new bathrooms, add new roof deck. legalize (e) bedroom & livng on 1st fl.Details
remodel of (e) single family dwelling, infill below (e) habitable space, remodel kitchen & bathrooms, add new bathrooms, add new roof deck. legalize (e) bedroom & livng on 1st fl. | $150,000 |
| Sep 11, 2014 | Completed final sign-off May 2015 | 654 Precita Av | rebuilt non conforming interior stair, remodel (e) bathrm/elec/plmbg upgrade, replace partial slab & retaining wall @ 1st flr, new water heater, furnace. remodel kitchen& bathrm @ 2nd floor, remodel bathrm @ attic,, repl 7 old windows with wood windows in same opening.Details
rebuilt non conforming interior stair, remodel (e) bathrm/elec/plmbg upgrade, replace partial slab & retaining wall @ 1st flr, new water heater, furnace. remodel kitchen& bathrm @ 2nd floor, remodel bathrm @ attic,, repl 7 old windows with wood windows in same opening. | $85,000 |
| Sep 2, 2014 | Completed final sign-off Mar 2015 | 218 Richland Av | convert 1st to 2 bedroom, 2 baths, laundry room. replace interior stair. repair foundation & slab floor and structural strengthening. remodel kitchen & bathrooms. upgrade electrical, plumbing, mechanical. replace (5) existing windows in-kind.Details
convert 1st to 2 bedroom, 2 baths, laundry room. replace interior stair. repair foundation & slab floor and structural strengthening. remodel kitchen & bathrooms. upgrade electrical, plumbing, mechanical. replace (5) existing windows in-kind. | $80,000 |
| Aug 27, 2014 | Completed final sign-off Mar 2015 | 218 Richland Av | remodel (e) kitchen & bathroom (1) on 2nd fl. remove all damaged dry walls & replaced with (n) ones. no wall modification. no structural work.Details
remodel (e) kitchen & bathroom (1) on 2nd fl. remove all damaged dry walls & replaced with (n) ones. no wall modification. no structural work. | $25,000 |
| Aug 22, 2014 | Completed final sign-off Apr 2017 | 23 Peralta Av | construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath.Details
construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath. | $350,000 |
| Jul 29, 2014 | Completed final sign-off Aug 2016 | 4660 18th St | vertical & horizontal addition. add laundry, bedroom , bathroom and fam rm on 1/f, reconfigure 2/f (add 1 & 1/2 bathrm, reconfigure 3/f add 2 bathrms, add 4/f consist of dining rm, living rm, bedrm, kitchen, 1 & 1/2 bathrm (totally add 2 bedrms)Details
vertical & horizontal addition. add laundry, bedroom , bathroom and fam rm on 1/f, reconfigure 2/f (add 1 & 1/2 bathrm, reconfigure 3/f add 2 bathrms, add 4/f consist of dining rm, living rm, bedrm, kitchen, 1 & 1/2 bathrm (totally add 2 bedrms) | $512,000 |
| Apr 17, 2014 | Completed final sign-off Oct 2014 | 27 Appleton Av | replace partial conc. floor at 1st floor. convert partial 1st floor to 2 bedrooms and 2 baths. replace and rebuild non conforming stair. replace single glazing windows. install plywood on extg walls. 2nd floor:remodel extg kitchen/bathroom. new additional 1 bedroom and 1 bath.Details
replace partial conc. floor at 1st floor. convert partial 1st floor to 2 bedrooms and 2 baths. replace and rebuild non conforming stair. replace single glazing windows. install plywood on extg walls. 2nd floor:remodel extg kitchen/bathroom. new additional 1 bedroom and 1 bath. | $80,000 |
| Apr 15, 2014 | Completed final sign-off Oct 2014 | 169 Stanyan St | 1st floor:remove non-conforming stair and replace with new legal stair. relocate bathroom, bedroom, laundry, water heater/furnace, erplace extg deck. upgrade electrical at kitchen and bathroom. install new tankless wa. 3rd floor:relocate kitchen and 2 bathroom. add on in house office.Details
1st floor:remove non-conforming stair and replace with new legal stair. relocate bathroom, bedroom, laundry, water heater/furnace, erplace extg deck. upgrade electrical at kitchen and bathroom. install new tankless wa. 3rd floor:relocate kitchen and 2 bathroom. add on in house office. | $80,000 |
| Feb 4, 2014 | Completed final sign-off Oct 2015 | 421 Oak St | add mstr bdrm 3 with full bath and family room, add 1/2 bath and stairs to 1st fl. 2nd fl:add mster bedrm w full bath,remodel kitchen. 3rd fl add mstrm bedrm with full bath, remodel kitchen. convert attic to master bedroom, bath. remove all plaster and laths, replace w 5/8" type x gyp bd. throughoutDetails
add mstr bdrm 3 with full bath and family room, add 1/2 bath and stairs to 1st fl. 2nd fl:add mster bedrm w full bath,remodel kitchen. 3rd fl add mstrm bedrm with full bath, remodel kitchen. convert attic to master bedroom, bath. remove all plaster and laths, replace w 5/8" type x gyp bd. throughout | $150,000 |
| Feb 3, 2014 | Completed final sign-off Sep 2014 | 579 Anderson St | install concrete stair from main floor to lower floor with retaining wall for stair, enclose front foye & new 1/2 bath room & laundry room. remodel (e) bath & kitchen, upgrade electrical, plumbing, mechanical, replace garage door, add new bathroom inside bedroom @ lower floor. comply with sf greenDetails
install concrete stair from main floor to lower floor with retaining wall for stair, enclose front foye & new 1/2 bath room & laundry room. remodel (e) bath & kitchen, upgrade electrical, plumbing, mechanical, replace garage door, add new bathroom inside bedroom @ lower floor. comply with sf green | $78,000 |
| Dec 6, 2013 | Completed final sign-off May 2014 | 266 Denslowe Dr | comply w/ complaint#201334881. install 7'-0" tall fence. remodel (e) bathroom at 3rd fl. remodel (e) kitchen, bathrm, rewire elect lighting in dining rm & living rm at 2nd fl. legalize (e) family rm & remove/relocate bathrm at ground fl.Details
comply w/ complaint#201334881. install 7'-0" tall fence. remodel (e) bathroom at 3rd fl. remodel (e) kitchen, bathrm, rewire elect lighting in dining rm & living rm at 2nd fl. legalize (e) family rm & remove/relocate bathrm at ground fl. | $38,000 |
| Dec 3, 2013 | Completed final sign-off Apr 2020 | 306 Guerrero St | replace (e) foundation, remodel kitchen/bathrm & bedrm & add new bathrms. convert partial ground flr to bedrm & bath. new spiral stair & small landing deck @ rear. upgrade electrical, plumbing & mechanical.Details
replace (e) foundation, remodel kitchen/bathrm & bedrm & add new bathrms. convert partial ground flr to bedrm & bath. new spiral stair & small landing deck @ rear. upgrade electrical, plumbing & mechanical. | $65,000 |
| Sep 20, 2013 | Completed final sign-off Dec 2013 | 1422 Rhode Island St | convert 1st fl to new 2 bedrooms & 2 bathrooms with new playing room & laundry room. rebuild existing rear deck in-kind. 2nd fl relocate & remodel existing kitchen and bedroom. replace all windows in kind. volunteer strutural strengthening. replace existing stairs in-kind.Details
convert 1st fl to new 2 bedrooms & 2 bathrooms with new playing room & laundry room. rebuild existing rear deck in-kind. 2nd fl relocate & remodel existing kitchen and bedroom. replace all windows in kind. volunteer strutural strengthening. replace existing stairs in-kind. | $87,500 |
| Sep 16, 2013 | Completed final sign-off Dec 2013 | 1422 Rhode Island St | (e) bath & kitchen remodel, remove (e) carpet, repair damaged drywall in living room. no change of wall, door & window.Details
(e) bath & kitchen remodel, remove (e) carpet, repair damaged drywall in living room. no change of wall, door & window. | $17,600 |
| Jun 17, 2013 | Completed final sign-off Sep 2013 | 161 Arbor St | remodel extg kitchen (replace cabinet/sink) and repair damaged drywall.Details
remodel extg kitchen (replace cabinet/sink) and repair damaged drywall. | $2,000 |
| Jun 13, 2013 | Completed final sign-off Sep 2013 | 161 Arbor St | convert lower flr game rm to bedrm and add 1/2 bath & master bath. relocate bathrm @ upper flr. remodel kitchen. volunteer seismic upgrade. relocate (e) stair. remodel interior.Details
convert lower flr game rm to bedrm and add 1/2 bath & master bath. relocate bathrm @ upper flr. remodel kitchen. volunteer seismic upgrade. relocate (e) stair. remodel interior. | $75,000 |
| May 29, 2013 | Completed final sign-off May 2014 | 812 Corbett Av | demolish kitchen, bathrooms, remove all carpet, damaged sheetrock, in walls and ceiling. ref. to pa#201111219362Details
demolish kitchen, bathrooms, remove all carpet, damaged sheetrock, in walls and ceiling. ref. to pa#201111219362 | $9,000 |
| May 29, 2013 | Completed final sign-off Apr 2017 | 571 21st Av | vertical addition. (n) 3rd floor-convert single family house into 2 units. 3rd fl consist of 3 bedroom, 2 baths & storage. 2nd fl remodel kitchen. 1st fl add kitchen & 2 bathsDetails
vertical addition. (n) 3rd floor-convert single family house into 2 units. 3rd fl consist of 3 bedroom, 2 baths & storage. 2nd fl remodel kitchen. 1st fl add kitchen & 2 baths | $150,000 |
| May 17, 2013 | Completed final sign-off Jul 2013 | 109 Duncan St | revision to bpa# 2013-0514-6926. remove 10ft bearing wall between kitchen & dining room.Details
revision to bpa# 2013-0514-6926. remove 10ft bearing wall between kitchen & dining room. | $1,000 |
| May 14, 2013 | Completed final sign-off Jul 2013 | 109 Duncan St | convert extg powder room into full bath in unit 109. reconfigure extg bath. replace extg kitchen cabinets and countertop.Details
convert extg powder room into full bath in unit 109. reconfigure extg bath. replace extg kitchen cabinets and countertop. | $18,000 |
| Mar 6, 2013 | Completed final sign-off Apr 2017 | 23 Peralta Av | remodel of & 70 sq ft addition to the ground fl unit, remodel (e) kitchen & bath, replace portions of (e) slab foundation. interior remodel of owner's unit at middle floor, relocate (e) kitchen & bath. no work on 3rd upper floor.Details
remodel of & 70 sq ft addition to the ground fl unit, remodel (e) kitchen & bath, replace portions of (e) slab foundation. interior remodel of owner's unit at middle floor, relocate (e) kitchen & bath. no work on 3rd upper floor. | $75,000 |
| Feb 27, 2013 | Completed final sign-off Oct 2013 | 1231 Castro St | add living rm, bedrm, bath & kitchen @ basement lvl for (n) location of lower unit. renovate (e) 1/f & 2/f for upper unit:remodel (e) kitchen & half bath on 1/f. 2nd flr: relocate (e) bath, convert (e) kitchen to 2 bedrms, convert (e) living to master bed & bath. replace windows, install skylight.Details
add living rm, bedrm, bath & kitchen @ basement lvl for (n) location of lower unit. renovate (e) 1/f & 2/f for upper unit:remodel (e) kitchen & half bath on 1/f. 2nd flr: relocate (e) bath, convert (e) kitchen to 2 bedrms, convert (e) living to master bed & bath. replace windows, install skylight. | $88,000 |
| Aug 30, 2012 | Completed final sign-off Apr 2013 | 125 College Av | interior remodel-no expansion of envelope, convert 727 sq ft basement (garage) to living space, relocate kitchen, new bathroom, relocate bathroom. modify lightwell roof above stairwell to achieve min code clearance. lower level remodel 727 sq ft upper level remodel, 382 sq ft. add garage door.Details
interior remodel-no expansion of envelope, convert 727 sq ft basement (garage) to living space, relocate kitchen, new bathroom, relocate bathroom. modify lightwell roof above stairwell to achieve min code clearance. lower level remodel 727 sq ft upper level remodel, 382 sq ft. add garage door. | $50,000 |
| Aug 16, 2012 | Completed final sign-off May 2013 | 1164 Church St | convert (e)livingroom into bedroom, add new masterbath, convert e bedroom into kitchen remodel e laundary room, remodel bathroom, relocated (e) bath on second floor, add interior stair to connect 1/f, infill and remodel on 1st floor, add new two and half bathrooms, excavate basement, retrofit foundaDetails
convert (e)livingroom into bedroom, add new masterbath, convert e bedroom into kitchen remodel e laundary room, remodel bathroom, relocated (e) bath on second floor, add interior stair to connect 1/f, infill and remodel on 1st floor, add new two and half bathrooms, excavate basement, retrofit founda | $70,000 |
| Aug 3, 2012 | Completed final sign-off Dec 2012 | 22 San Carlos St | remodel unit 22, 24 & 26. kitchen & bath. no change of walls.Details
remodel unit 22, 24 & 26. kitchen & bath. no change of walls. | $60,000 |
| Jun 11, 2012 | Completed final sign-off Jul 2012 | 116 Lunado Wy | remodel (e) kitchen and full bath on main floor & shower stall on the closet area of the half bath on main floor.Details
remodel (e) kitchen and full bath on main floor & shower stall on the closet area of the half bath on main floor. | $22,500 |
| Mar 16, 2012 | Completed final sign-off May 2012 | 305 Valdez Av | add half bathroom & remodel (e) kitchen & bathroom on 2nd floor only. repair about 30 sq ft of stucco above garage doorDetails
add half bathroom & remodel (e) kitchen & bathroom on 2nd floor only. repair about 30 sq ft of stucco above garage door | $21,500 |
| Feb 14, 2012 | Never finaled issued Feb 2012, no final | 254 Stonecrest Dr | to retile the half bath on 1/f next to kitchen, replace 2 existing flat bedroom doors with six panel doors on 2/f.Details
to retile the half bath on 1/f next to kitchen, replace 2 existing flat bedroom doors with six panel doors on 2/f. | $3,200 |
| Nov 21, 2011 | Completed final sign-off Jun 2014 | 812 Corbett Av | remodel & addition to (e) 2-story single family residence to include front yard extension & (n) kitchen & baths.Details
remodel & addition to (e) 2-story single family residence to include front yard extension & (n) kitchen & baths. | $235,000 |
| Sep 15, 2011 | Completed final sign-off Oct 2011 | 534 48th Av | existing kitchen remodel with same layout. upgrade all electrical works. kitchen on upper level, no change to wall layout and openings. (a minimum of 50& total rated wattage of permanently installed lighting shall be high efficiency, install carbon monoxide alarm & smoke detector per cebc 420.907Details
existing kitchen remodel with same layout. upgrade all electrical works. kitchen on upper level, no change to wall layout and openings. (a minimum of 50& total rated wattage of permanently installed lighting shall be high efficiency, install carbon monoxide alarm & smoke detector per cebc 420.907 | $10,300 |
| Jun 13, 2011 | Completed final sign-off Aug 2011 | 2030 Fell St | 1. replace kitchen cabinets and counter top. 2. upgrade electrical circuits in kitchen, change ceiling light fixtures. at least 50% high efficiency lighting by wattage. cec 150 (k). 3. replace kitchen sink and dishwasher.Details
1. replace kitchen cabinets and counter top. 2. upgrade electrical circuits in kitchen, change ceiling light fixtures. at least 50% high efficiency lighting by wattage. cec 150 (k). 3. replace kitchen sink and dishwasher. | $9,700 |
| Apr 6, 2011 | Completed final sign-off Jun 2011 | 618 28th Av | 1st floor-replace (e) kitchen cabinets, remove (e) door & stairs, remodel powder room. (n) lighting must comply w/ cec 150 (k) 2nd fl-reconfigure (e) closet & bathrm space to include a master bathrm. replace steel pipes with new copper plumb. & update elect. circuit to code.no work @ garage level.Details
1st floor-replace (e) kitchen cabinets, remove (e) door & stairs, remodel powder room. (n) lighting must comply w/ cec 150 (k) 2nd fl-reconfigure (e) closet & bathrm space to include a master bathrm. replace steel pipes with new copper plumb. & update elect. circuit to code.no work @ garage level. | $27,500 |
| Jun 9, 2010 | Never finaled issued Jun 2010, no final | 325 Lakeview Av | replace existing linoleum with ceramic tiles in kitchen floor (125 sq.ft.)Details
replace existing linoleum with ceramic tiles in kitchen floor (125 sq.ft.) | $1,800 |
| Aug 20, 2009 | Completed final sign-off Jan 2010 | 1820 Anza St | demolish (e) kitchen, (e) pantry, (e) water closet, & (e) bath. add new cabients, new coutners, new sinks & new faucets. add new recessed lights, new pendant lights & new over & udner cabient lights. add new wall , new tile, new tankless water heater & washer/dryer.Details
demolish (e) kitchen, (e) pantry, (e) water closet, & (e) bath. add new cabients, new coutners, new sinks & new faucets. add new recessed lights, new pendant lights & new over & udner cabient lights. add new wall , new tile, new tankless water heater & washer/dryer. | $30,000 |
| Aug 19, 2009 | Never finaled issued Aug 2009, no final | 405 29th St | replace 2 brown upper cabinets with cherry cabinets in existing kitchen for 4 units. install tiles over existing linoleum kitchen floor for 4 units (approx 100 sf for each kitchen floor)Details
replace 2 brown upper cabinets with cherry cabinets in existing kitchen for 4 units. install tiles over existing linoleum kitchen floor for 4 units (approx 100 sf for each kitchen floor) | $10,300 |
| May 27, 2009 | Never finaled issued May 2009, no final | 811 29th Av | remove vinyl flooring on (e) kitchen. install new ceramic tile on kitchen floor (about 160 sq. ft.) 2nd floor. no other work.Details
remove vinyl flooring on (e) kitchen. install new ceramic tile on kitchen floor (about 160 sq. ft.) 2nd floor. no other work. | $2,100 |
| Apr 16, 2009 | Never finaled issued Apr 2009, no final | 820 Le Conte Av | replacement of existing kitchen cabinets and countertop, keep the exact same layout as previous. replacement of kitchen sink and faucet, no electrical work involvedDetails
replacement of existing kitchen cabinets and countertop, keep the exact same layout as previous. replacement of kitchen sink and faucet, no electrical work involved | $14,900 |
| Nov 17, 2008 | Completed final sign-off Feb 2009 | 3731 Rivera St | kitchen remodel and bathroom remodel on 2nd floor. lighting will comply with title 24.Details
kitchen remodel and bathroom remodel on 2nd floor. lighting will comply with title 24. | $24,000 |
| Jul 22, 2008 | Completed final sign-off Aug 2008 | 1370 26th Av | revision to application 200807015744. relocate kitchen on 2nd floor.Details
revision to application 200807015744. relocate kitchen on 2nd floor. | |
| Jul 14, 2008 | Completed final sign-off Oct 2008 | 2565 23rd Av | remodel existing kitchen, add staircase from 2nd floor to ground floor, all work at 2nd floor. construct two bedrooms, one family room & two bathroom on ground floor.Details
remodel existing kitchen, add staircase from 2nd floor to ground floor, all work at 2nd floor. construct two bedrooms, one family room & two bathroom on ground floor. | $68,000 |
| Jul 1, 2008 | Completed final sign-off Aug 2008 | 1370 26th Av | remodel kitchen, replace counter/cabinets, flooring & re-wire elect. lighting/receptacle. all work at 2nd floor. replace psi beam under kitchen wall in lightwell. repair (e) staircase in lightwell in kind (less than 50%).Details
remodel kitchen, replace counter/cabinets, flooring & re-wire elect. lighting/receptacle. all work at 2nd floor. replace psi beam under kitchen wall in lightwell. repair (e) staircase in lightwell in kind (less than 50%). | $28,000 |
| May 23, 2008 | Completed final sign-off Jul 2008 | 1644 Fulton St | add kitchen remodel, delete waher/dryer work from permit 2007 1127 9028Details
add kitchen remodel, delete waher/dryer work from permit 2007 1127 9028 | $22,000 |
| Apr 24, 2008 | Never finaled issued May 2012, no final | 380 19th Av | horizontal & vertical addition, excavate 1 ft.@ garage area, add bedrm & bath to ground flr;add ma bedrm,bath & relocate ktichen on 2nd flr;unit #2:add ma beth & relocate kitchen on 3rd flr; new 4th flr includes fam room,two bedrm, two bathrms and den.Details
horizontal & vertical addition, excavate 1 ft.@ garage area, add bedrm & bath to ground flr;add ma bedrm,bath & relocate ktichen on 2nd flr;unit #2:add ma beth & relocate kitchen on 3rd flr; new 4th flr includes fam room,two bedrm, two bathrms and den. | $350,000 |
| Oct 2, 2007 | Completed final sign-off Jan 2008 | 1822 Anza St | remodel 2nd floor kitchen and bedroom. rewire electrical wire for new lighting. replace 6 windows in rearDetails
remodel 2nd floor kitchen and bedroom. rewire electrical wire for new lighting. replace 6 windows in rear | $28,000 |
| Jun 27, 2007 | Completed final sign-off Aug 2007 | 649 14th St | (work to be done at unit 651 only) update kitchen install (n) cabients appliances & light & sink adjust door to swing in update bathrm (remove shower stall & move sink add shower head to tub) build returns for walls around dining rm area & trm down headers remove casing for door frame and sealDetails
(work to be done at unit 651 only) update kitchen install (n) cabients appliances & light & sink adjust door to swing in update bathrm (remove shower stall & move sink add shower head to tub) build returns for walls around dining rm area & trm down headers remove casing for door frame and seal | $15,000 |