Back to kitchen remodel contractors
R Bay Construction
- Based in
- Richmond
- On San Francisco permits
- Dec 2016 to May 2026
- Last 24 months
- 7 permits filed
23 permits since 2000: 19 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2026 | Completed final sign-off Apr 2026 | 1365 Scott St | unit #3 - kitchen remodel in kind. replace cabinets, sink, faucet, light, flooring, exhaust fan, sheetrock, and backsplash.Details
unit #3 - kitchen remodel in kind. replace cabinets, sink, faucet, light, flooring, exhaust fan, sheetrock, and backsplash. | $60,000 |
| Oct 27, 2022 | Completed final sign-off Jul 2023 | 1051 South Van Ness Av | replace existing kitchen and laundry room fixtures and finishes. remove walls to enlarge space new beam to carry load of (e) bearing wall. add new partition to define closet. replace four windows with new clad wood frame windows.Details
replace existing kitchen and laundry room fixtures and finishes. remove walls to enlarge space new beam to carry load of (e) bearing wall. add new partition to define closet. replace four windows with new clad wood frame windows. | $47,060 |
| Oct 14, 2022 | Completed final sign-off Jan 2023 | 1340 Scott St | in kind kitchen remodeling, no walls removing, new cabinets, new pergo flooring, new sink, dishwasherDetails
in kind kitchen remodeling, no walls removing, new cabinets, new pergo flooring, new sink, dishwasher | $75,000 |
| Aug 24, 2022 | Completed final sign-off Nov 2022 | 1332 Scott St | apt a #25. kitchen remodeling in kind. replace cabinets, sink, replace light fixture. replace electrical plugs. no structural work. no change in wall layout.Details
apt a #25. kitchen remodeling in kind. replace cabinets, sink, replace light fixture. replace electrical plugs. no structural work. no change in wall layout. | $70,000 |
| Dec 7, 2016 | Completed final sign-off Mar 2017 | 1332 Scott St | install new kitchen cabinets and sink, replace in-kind, approx. 10' x 8'. move gas to access through cabinets. install under cabinet lights.Details
install new kitchen cabinets and sink, replace in-kind, approx. 10' x 8'. move gas to access through cabinets. install under cabinet lights. | $20,000 |