Back to bathroom remodel contractors
R Bay Construction
- Based in
- Richmond
- On San Francisco permits
- Dec 2016 to May 2026
- Last 24 months
- 7 permits filed
23 permits since 2000: 19 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2023 | Completed final sign-off Feb 2023 | 1340 Scott St | in kind bathroom remodel. replace bathtub tile in wall and floor. new light fixtures, vanity, shower valve. replace water heater. maher not reqDetails
in kind bathroom remodel. replace bathtub tile in wall and floor. new light fixtures, vanity, shower valve. replace water heater. maher not req | $60,000 |
| May 2, 2022 | Completed final sign-off Jun 2022 | 1340 Scott St | bathroom remodel, replace tile around tub & tile floor. replace shower valve, replace vanity, remove water heater & install tankless water heater, replace bathroom door. install exaust fan & light paint.Details
bathroom remodel, replace tile around tub & tile floor. replace shower valve, replace vanity, remove water heater & install tankless water heater, replace bathroom door. install exaust fan & light paint. | $25,000 |
| Feb 13, 2020 | Completed final sign-off Mar 2020 | 1804 Ellis St | unit e. 3/f. bathroom remodel. new bath tub, new shower valve, new tile floor, new tile walls in bath tub. new vanity, new light fixtures over the vanity. remodel in kind. comply with cec 150.0(k)5. 80 sf bathroom, no structural changes.Details
unit e. 3/f. bathroom remodel. new bath tub, new shower valve, new tile floor, new tile walls in bath tub. new vanity, new light fixtures over the vanity. remodel in kind. comply with cec 150.0(k)5. 80 sf bathroom, no structural changes. | $35,000 |
| Nov 19, 2019 | Completed final sign-off Jul 2020 | 1332 Scott St | bathroom remodel, install tile floor and tile walls. 80 sqft bathroom no structural work. no change to layout. replace tub with shower.Details
bathroom remodel, install tile floor and tile walls. 80 sqft bathroom no structural work. no change to layout. replace tub with shower. | $50,000 |
| Jan 7, 2019 | Completed final sign-off Feb 2019 | 1864 Ellis St | remodel bathroom take out tub and install a 36x36 walk in shower, replace shower faucet. install tile walls and floor. 10x8. everything in same location.Details
remodel bathroom take out tub and install a 36x36 walk in shower, replace shower faucet. install tile walls and floor. 10x8. everything in same location. | $20,000 |
| Aug 3, 2018 | Completed final sign-off Jul 2019 | 1332 Scott St | in-kind replacement of all fixtures in bathroom. no walls moved, removed, added or infilled, all existing layout to remain unchanged.Details
in-kind replacement of all fixtures in bathroom. no walls moved, removed, added or infilled, all existing layout to remain unchanged. | $35,000 |
| Aug 2, 2018 | Completed final sign-off May 2019 | 1332 Scott St | convert bath to shower. build 1/2 wall for shower. remove water heater and install tankless heater. in-kind replacement of all other fixturesDetails
convert bath to shower. build 1/2 wall for shower. remove water heater and install tankless heater. in-kind replacement of all other fixtures | $35,000 |
| Jan 18, 2018 | Completed final sign-off Jun 2018 | 2651 21st St | bathroom remodeling remove tub, install shower, bathroom fan, high efficiancy lightin new tile,in shower & floor, new sink, plumbing install laundry unit no change in walls.Details
bathroom remodeling remove tub, install shower, bathroom fan, high efficiancy lightin new tile,in shower & floor, new sink, plumbing install laundry unit no change in walls. | $39,500 |
| May 9, 2017 | Expired or cancelled expired Sep 2021 | 1374 Hayes St | bathroom remodeling, remove tub, install shower, replace sink ,bathroom fan, heater ,floor & new tile, high efficiancy lighting, no change in walls & opening layoutDetails
bathroom remodeling, remove tub, install shower, replace sink ,bathroom fan, heater ,floor & new tile, high efficiancy lighting, no change in walls & opening layout | $12,000 |