Back to bathroom remodel contractors
R 3 Builders Inc.
- Based in
- Benicia
- On San Francisco permits
- Sep 2001 to Jul 2026
- Last 24 months
- 3 permits filed
124 permits since 2000: 83 completed, 3 in progress, 32 never finaled, 6 expired or cancelled.
Of the 32 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 26 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 6 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 80 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2026 | In progress issued Apr 2026 | 448 Brannan St | tenant improvement: equipment replacement in kitchen. existing hoods/mech to remain. new finishes, lighting, furniture & dining areas. bars & bathrooms. 1 new ada/ 1 non ada bathroom. all interior work no exterior alterations.Details
tenant improvement: equipment replacement in kitchen. existing hoods/mech to remain. new finishes, lighting, furniture & dining areas. bars & bathrooms. 1 new ada/ 1 non ada bathroom. all interior work no exterior alterations. | $600,000 |
| Apr 2, 2021 | Expired or cancelled withdrawn Mar 2024 | 531 Rhode Island St | new interior stair that connects the 3 levels. reconfiguring the lower level to include bedroom & bathroom. reconfiguring the main level to have an open floor plan. reconfigure upper level to have 2 bedrooms & 2 bathrooms. structural improvements: moment frames & foundation workDetails
new interior stair that connects the 3 levels. reconfiguring the lower level to include bedroom & bathroom. reconfiguring the main level to have an open floor plan. reconfigure upper level to have 2 bedrooms & 2 bathrooms. structural improvements: moment frames & foundation work | $80,000 |
| Oct 29, 2020 | Completed final sign-off Jun 2022 | 200 Brannan St | replacing appliances in kitchen, replace sheetrock in kitchen and bathroom bedrooms. reinstall doors, replace tile and vanities in 2 bathrooms. replace wood flooring througout. revision to pa# 201909202293. unit 424Details
replacing appliances in kitchen, replace sheetrock in kitchen and bathroom bedrooms. reinstall doors, replace tile and vanities in 2 bathrooms. replace wood flooring througout. revision to pa# 201909202293. unit 424 | $65,000 |
| Dec 2, 2014 | Never finaled issued Sep 2015, no final | 2136 Union St | removal of barriers to ada standards. this is an ada upgrades, changing front door, rear door, bathrooms to comply with ada regs.Details
removal of barriers to ada standards. this is an ada upgrades, changing front door, rear door, bathrooms to comply with ada regs. | $35,000 |
| Nov 22, 2013 | Completed final sign-off Feb 2016 | 601 Mission St | t.i. for (n) retail pharmacy on ground floor & basement work includes (n) fixtures, bathrooms, mep & non-passenger vertical lift. no exterior work, fire protection under separate permit.Details
t.i. for (n) retail pharmacy on ground floor & basement work includes (n) fixtures, bathrooms, mep & non-passenger vertical lift. no exterior work, fire protection under separate permit. | $835,000 |
| Jun 22, 2012 | Completed final sign-off Aug 2013 | 1101 Market St | change of use from check cashing to pharmacy-t.i. for new retail pharmacy work includes new partitions, fixtures, finishes, m.e.p, new bathrooms, interior stairs & interior elevator. fire protection under seperate permit. new storefront & facade under seperate pa# 201205170670Details
change of use from check cashing to pharmacy-t.i. for new retail pharmacy work includes new partitions, fixtures, finishes, m.e.p, new bathrooms, interior stairs & interior elevator. fire protection under seperate permit. new storefront & facade under seperate pa# 201205170670 | $400,000 |
| Sep 1, 2011 | Completed final sign-off May 2012 | 351 California St | int. t i for new pharmacy drug store. work includes new partitions, bathrooms, fixtures, finishes, mech, lighting and plumbing. no exterior work. fire protection under separate permit. all shelving and racking under separate permitDetails
int. t i for new pharmacy drug store. work includes new partitions, bathrooms, fixtures, finishes, mech, lighting and plumbing. no exterior work. fire protection under separate permit. all shelving and racking under separate permit | $500,000 |
| Aug 30, 2011 | Completed final sign-off Jul 2012 | 1760 Ocean Av | tenant improvement-new drugstore/pharmacy work includes new partitions, fixtures, finishes, new bathrooms, m.e.p. no exterior work. fire protection & signage under seperate permitsDetails
tenant improvement-new drugstore/pharmacy work includes new partitions, fixtures, finishes, new bathrooms, m.e.p. no exterior work. fire protection & signage under seperate permits | $200,000 |
| Jul 24, 2009 | Completed final sign-off Nov 2009 | 2801 Leavenworth St | interior remodel of existing bar/nightclub. remove ramps, install accessible lift, raise floor. add accessible bathroom, relocate bar and add 550 sq ft of office and support staff.m,e pd sprinkler under separate permit.Details
interior remodel of existing bar/nightclub. remove ramps, install accessible lift, raise floor. add accessible bathroom, relocate bar and add 550 sq ft of office and support staff.m,e pd sprinkler under separate permit. | $215,000 |